[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1134881":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1134881,796,2,"多选题","悬臂拼装法施工中，0号块和1号块之间采用湿接缝处理主要是为了控制该跨节段的（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","挠度",false,{"key":16,"text":17,"correct":18},"B","标高",true,{"key":20,"text":21,"correct":14},"C","截面尺寸",{"key":23,"text":24,"correct":18},"D","拼装方向",{"key":26,"text":27,"correct":14},"E","施工不平衡荷载","BD","本题考查的是悬臂拼装施工。块件拼装接缝一般为湿接缝与胶接缝两种，湿接缝用高强细石混凝土，胶接缝采用环氧树胶为接缝料。由于1号块的安装对控制该跨节段的拼装方向和标高非常关键，故1号块与0号块之间的接缝多以采用湿接缝以利调整1号块位置。",{"id":6,"name":31,"category":32,"favorite":33},"一建公路工程实务","建筑工程",0]