[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1134845":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1134845,796,2,"多选题","路基施工前应及时对来源不同，性质不同的拟作为路堤填料的材料进行取样实验，一般土的试验项目包括（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","标准击实试验",true,{"key":16,"text":17,"correct":14},"B","CBR试验",{"key":19,"text":20,"correct":14},"C","液限和塑限",{"key":22,"text":23,"correct":24},"D","固结试验",false,{"key":26,"text":27,"correct":14},"E","天然含水率","ABCE","本题考查的是路基施工技术准备。路基施工前应及时对来源不同、性质不同的拟作为路堤填料的材料进行复查和取样试验。土的试验项目包括天然含水率、液限、塑限、标准击实试验、CBR试验等，必要时应做颗粒分析、相对密度、有机质含量、易溶盐含量、冻胀和膨胀量等试验。参见教材P1。",{"id":6,"name":31,"category":32,"favorite":33},"一建公路工程实务","建筑工程",0]