[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1134833":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1134833,796,2,"多选题","路基行车带施工中压实度不能满足质量标准要求，主要原因不包括（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","压实遍数不够",false,{"key":16,"text":17,"correct":14},"B","碾压不均匀，局部有漏压现象",{"key":19,"text":20,"correct":21},"C","换填土时清淤彻底",true,{"key":23,"text":24,"correct":21},"D","具有良好的路基顶面排水设施",{"key":26,"text":27,"correct":14},"E","土场土质种类多，出现不同类别土混填","CD","本题考查的是路基压实质量问题的防治。路基施工中压实度不能满足质量标准要求，甚至局部出现“弹簧”现象，主要原因是：（1）压实遍数不合理。（2）压路机质量偏小。（3）填土松铺厚度过大。（4）碾压不均匀，局部有漏压现象。（5）含水量大于最佳含水量，特别是超过最佳含水量两个百分点，造成弹簧现象。（6）没有对上一层表面浮土或松软层进行处治。（7）土场土质种类多，出现异类土壤混填；尤其透水性差的土壤包裹透水性好的土壤，形成了水囊，造成弹簧现象。（8）填土颗粒过大。参见教材P44。",{"id":6,"name":31,"category":32,"favorite":33},"一建公路工程实务","建筑工程",0]