[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1134790":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1134790,796,2,"多选题","隧道涌水地段采用辅助坑道排水时应符合的要求有（）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","坑道应和正洞平行或接近平行",true,{"key":16,"text":17,"correct":14},"B","坑道底标高应低于正洞标高",{"key":19,"text":20,"correct":14},"C","坑道应超前正洞10～20m，至少应超前1～2个循环进尺",{"key":22,"text":23,"correct":24},"D","坑道底标高应高于正洞标高",false,{"key":26,"text":27,"correct":24},"E","坑道应和正洞成30度角","ABC","本题考查的是涌水地段施工特点。采用辅助坑道排水时应符合的要求： 1．坑道应和正洞平行或接近平行。 2．坑道底标高应低于正洞底标高。 3．坑道应超前正洞10～20m，至少应超前1～2个循环进尺。",{"id":6,"name":31,"category":32,"favorite":33},"一建公路工程实务","建筑工程",0]