[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1134776":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1134776,796,1,"单选题","根据《公路水运工程施工安全标准化指南》，不属于危险性较大的分部分项工程是（ ）。2015年",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","高度18m 的土质边坡处理",true,{"key":16,"text":17,"correct":18},"B","水深15m 的围堰工程",false,{"key":20,"text":21,"correct":18},"C","深度7m 的挡墙基础",{"key":23,"text":24,"correct":18},"D","高瓦斯隧道","边坡高度大于20m 的路堤或地面斜坡坡率陡于1：2.5 的路堤，或不良地质地段、特殊岩土地段的路堤。",{"id":6,"name":27,"category":28,"favorite":29},"一建公路工程实务","建筑工程",0]