[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1134705":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1134705,796,1,"单选题","（2019年真题）热拌沥青碎石配合比设计采用（ ）设计。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","正交试验",false,{"key":16,"text":17,"correct":14},"B","针入度试验",{"key":19,"text":20,"correct":21},"C","马歇尔试验",true,{"key":23,"text":24,"correct":14},"D","洛杉矶磨耗试验","P61-63 本题考查的是路面沥青稳定基层（底基层）施工。热拌沥青碎石的配合比设计采用马歇尔试验设计方法。",{"id":6,"name":27,"category":28,"favorite":29},"一建公路工程实务","建筑工程",0]