[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1134645":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1134645,796,1,"单选题","关于施工机械台班预算单价中安装拆卸及辅助设施费的说法，错误的是（ ）。2015年",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","该费用指机械在施工现场进行安装、拆卸所需的人工费、材料费、机械费、试运转费以及安装所需的辅助设施费",false,{"key":16,"text":17,"correct":14},"B","辅助设施费包括安装机械的基础、底座及固定的锚桩等项费用",{"key":19,"text":20,"correct":21},"C","属于台班单价的可变费用",true,{"key":23,"text":24,"correct":14},"D","混凝土搅拌站（楼）的安装、拆卸费用不在此费用内，需另行计算","不变费用包括折旧费、大修理费、经常修理费、安装拆卸及辅助设施费等。",{"id":6,"name":27,"category":28,"favorite":29},"一建公路工程实务","建筑工程",0]