[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1134594":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1134594,796,1,"单选题","由建设单位主持，检查施工合同的执行情况，评价工程质量是否符合技术标准及设计要求，是否可以移交下一阶段施工称为（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","竣工验收",false,{"key":16,"text":17,"correct":14},"B","中间交工验收",{"key":19,"text":20,"correct":21},"C","交工验收",true,{"key":23,"text":24,"correct":14},"D","工序验收","2020版教材P455\u002F2019版教材P446 交工验收阶段，其主要工作是：检查施工合同的执行情况，评价工程质量，对各参建单位工作进行初步评价。",{"id":6,"name":27,"category":28,"favorite":29},"一建公路工程实务","建筑工程",0]