[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1134588":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1134588,796,1,"单选题","对于公路工程中出现的一般设计变更的审查，应由（ ）负责。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建设单位",true,{"key":16,"text":17,"correct":18},"B","设计单位",false,{"key":20,"text":21,"correct":18},"C","监理单位",{"key":23,"text":24,"correct":18},"D","交通行政主管部门","2020版教材P449\u002F2019版教材P440 项目法人负责对一般设计变更进行审查，并应当加强对公路工程设计变更实施的管理。项目法人即建设单位，",{"id":6,"name":27,"category":28,"favorite":29},"一建公路工程实务","建筑工程",0]