[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1134561":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1134561,796,1,"单选题","悬臂浇筑钢筋混凝土箱梁的施工挠度控制时，对挠度的观测应在一天中的（ ）进行。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","温度最低时",false,{"key":16,"text":17,"correct":14},"B","温度最高时",{"key":19,"text":20,"correct":14},"C","平均气温时",{"key":22,"text":23,"correct":24},"D","温度变化最小时",true,"2020版教材P225\u002F2019版教材P219 挠度观测：在一天中温度变化相对小的时间，在箱梁的顶底板布置测点，测立模时、混凝土浇筑前、混凝土浇筑后、预应力束张拉前、预应力束张拉后的标高。",{"id":6,"name":27,"category":28,"favorite":29},"一建公路工程实务","建筑工程",0]