[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1134558":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1134558,796,1,"单选题","刚构桥的施工一般采用（ ）施工。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","整体现浇",false,{"key":16,"text":17,"correct":14},"B","转体",{"key":19,"text":20,"correct":21},"C","平衡悬臂施工",true,{"key":23,"text":24,"correct":14},"D","采用分次浇筑法","2020版教材P203\u002F2019版教材P197 刚构桥的施工：1.平衡悬臂施工；2.悬臂梁起步施工；3.箱梁混凝土的浇筑；4.悬臂拼装；5.块件拼装接缝",{"id":6,"name":27,"category":28,"favorite":29},"一建公路工程实务","建筑工程",0]