[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1134552":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1134552,796,1,"单选题","刚构桥采用悬臂拼装法施工时，块件拼装接缝一般为（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","干接缝与胶接缝",false,{"key":16,"text":17,"correct":18},"B","湿接缝与胶接缝",true,{"key":20,"text":21,"correct":14},"C","平接缝与榫接缝",{"key":23,"text":24,"correct":14},"D","平接缝与企口接缝","2020版教材P204\u002F2019版教材P199198 该题主要考察：块件拼装接缝块件拼装接缝一般为湿接缝与胶接缝两种。湿接缝用高强细石混凝土，胶接缝则采用环氧树胶为接缝料",{"id":6,"name":27,"category":28,"favorite":29},"一建公路工程实务","建筑工程",0]