[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1134545":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1134545,796,1,"单选题","先张法预应力筋的张拉过程中，应抽查预应力筋的预应力值，其偏差的绝对值不得超过（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","按一个构件全部预应力筋预应力总值的5%",true,{"key":16,"text":17,"correct":18},"B","按全体构件预应力筋平均值的5%",false,{"key":20,"text":21,"correct":18},"C","按一个构件单根预应力值的5%",{"key":23,"text":24,"correct":18},"D","按全体构件预应力筋最大值的5%","2020版教材P146\u002F2019版教材P166 同时张拉多根预应力筋时，应预先调整其初应力，使相互之间的应力一致；张拉过程中，应使活动横梁与固定横梁始终保持平行，并应抽查预应力筋的预应力值，其偏差的绝对值不得超过按一个构件全部预应力筋总值的5%。",{"id":6,"name":27,"category":28,"favorite":29},"一建公路工程实务","建筑工程",0]