[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1134537":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1134537,796,1,"单选题","转体施工工艺是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","脱架→转动→转盘封固→撤锚合龙",true,{"key":16,"text":17,"correct":18},"B","转动→转盘封固→撤锚合龙→脱架",false,{"key":20,"text":21,"correct":18},"C","脱架→转动→撤锚合龙→转盘封固",{"key":23,"text":24,"correct":18},"D","撤锚合龙→转动→脱架→转盘封固","2020版教材P193\u002F2019版教材P187 转体施工工艺包括脱架→转动→转盘封固→撤锚合龙。",{"id":6,"name":27,"category":28,"favorite":29},"一建公路工程实务","建筑工程",0]