[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1134535":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1134535,796,1,"单选题","斜拉桥施工时，在主梁悬梁浇筑或悬臂拼装过程中，确保主梁线形和顺、正确是第一位的，施工中以（ ）控制为主。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","拉索索力",false,{"key":16,"text":17,"correct":18},"B","标高",true,{"key":20,"text":21,"correct":14},"C","预制块件接缝转角",{"key":23,"text":24,"correct":14},"D","混凝土强度","2020版教材P202\u002F2019版教材P196 1.斜拉桥施工时，在主梁悬臂浇筑或悬臂拼装过程中，确保主梁线形和顺、正确是第一位的，施工中以标高控制为主。",{"id":6,"name":27,"category":28,"favorite":29},"一建公路工程实务","建筑工程",0]