[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1134212":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1134212,796,1,"单选题","路面无机结合料稳定基层（底基层）施工中，碾压贫混凝土等强度较高的基层材料成型后可采用预切缝措施，并应符合的规定不包括（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","预切缝的间距宜为8～15m",false,{"key":16,"text":17,"correct":14},"B","宜在养护的3～5d内切缝",{"key":19,"text":20,"correct":21},"C","用拖拉机初压1～2遍",true,{"key":23,"text":24,"correct":14},"D","切缝深度宜为基层厚度的1\u002F2～1\u002F3，切缝宽度约5㎜","2020版教材P72\u002F2019版教材P68 路面无机结合料稳定基层（底基层）施工中，碾压贫混凝土等强度较高的基层材料成型后可采用预切缝措施，并应符合下列规定：（1）预切缝的间距宜为8～15m；（2）宜在养护的3～5d内切缝；（3）切缝深度宜为基层厚度的1\u002F2～1\u002F3，切缝宽度约5㎜；（4）切缝后应及时清理缝隙，并用热沥青填满。",{"id":6,"name":27,"category":28,"favorite":29},"一建公路工程实务","建筑工程",0]