[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1133755":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1133755,796,1,"单选题","发包人应在监理人出具交工付款证书的（ ）d内，将应支付款支付给承包人。发包人不按期支付的，按合同条款的约定，将逾期付款违约金支付给承包人。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","7",false,{"key":16,"text":17,"correct":14},"B","14",{"key":19,"text":20,"correct":14},"C","21",{"key":22,"text":23,"correct":24},"D","28",true,"2020版教材P409\u002F2019版教材P400 监理人在收到承包人提交的竣工付款申请单后的14天内完成核查，提出发包人到期应支付给承包人的价教送发包人审核并抄送承包人。发包人应在收到后28天内审核完毕，由监理人向承包人出具经发包人签认的竣工付款证书。监理人未在约定时间内核查，又未提出具体意见的，视为承包人提交的竣工付款申请单己经监理人核査同意。发包人未在约定时间内审核又未提出具体意见的，监理人提出发包人到期应支付给承包人的价款视为己经发包人同意。@##",{"id":6,"name":27,"category":28,"favorite":29},"一建公路工程实务","建筑工程",0]