[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1133635":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1133635,796,1,"单选题","土方路基工程施工中所用的材料，必须采用设计和规范规定的适用材料，保证原材料合格，正确确定土的（ ）和最佳含水量。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","天然密度",false,{"key":16,"text":17,"correct":14},"B","平均密度",{"key":19,"text":20,"correct":14},"C","毛体积密度",{"key":22,"text":23,"correct":24},"D","最大干密度",true,"2020版教材P321\u002F2019版教材P315 土方路基工程施工中常见质量控制关键点：使用适宜材料，必须采用设计和规范规定的适用材料，保证原材料合格，正确确定土的最大干密度和最佳含水量。",{"id":6,"name":27,"category":28,"favorite":29},"一建公路工程实务","建筑工程",0]