[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1133598":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1133598,796,1,"单选题","如图中挖3工序的最早开始时间和最早完成时间论述正确是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","挖3工序最早在第5d后开始并且最早在第6d晚上结束",true,{"key":16,"text":17,"correct":18},"B","挖3工序最早在第5d早晨开始并且最早在第6d晚上结束",false,{"key":20,"text":21,"correct":18},"C","挖3工序最早在第5d后开始并且最早在第8d晚上结束",{"key":23,"text":24,"correct":18},"D","挖3工序最早在第5d早晨开始并且最早在第9d晚上结束","2020版教材P306\u002F2019版教材P300 工序的最早开始时间在箭尾点的最早时间=5，是表示第5天后即第6天早晨，因为第一道工序的开始时间0则表示为第0天后即第1天早晨开始；工序最早完成不能用箭头点的参数，只能通过工序开始时间加持续时间计算求得，5+1=6，",{"id":6,"name":27,"category":28,"favorite":29},"一建公路工程实务","建筑工程",0]