[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1133519":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1133519,796,1,"单选题","（ ）是成本管理中编制成本计划的依据。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目预算（直接）成本",false,{"key":16,"text":17,"correct":18},"B","计划预算（直接）成本",true,{"key":20,"text":21,"correct":14},"C","实际预算（直接）成本",{"key":23,"text":24,"correct":14},"D","责任目标成本","本题考查的是公路项目标后预算编制。计划预算（直接）成本是在施工过程中，根据年度生产计划中计划的工程量和标后预算清单单价计算的预算成本，是成本管理中编制成本计划的依据。参见教材P371。",{"id":6,"name":27,"category":28,"favorite":29},"一建公路工程实务","建筑工程",0]