[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1133430":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1133430,796,1,"单选题","钻孔灌注桩施工的主要工序有：埋设护筒、（ ）、清底、钢筋笼制作、吊装、灌注水下混凝土等。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","钻孔.抽浆",false,{"key":16,"text":17,"correct":18},"B","制备泥浆.钻孔",true,{"key":20,"text":21,"correct":14},"C","稳固护筒.抽浆",{"key":23,"text":24,"correct":14},"D","稳固护筒.制备泥浆","本题考查的是钻孔灌注桩施工。钻孔灌注桩施工的主要工序有：埋设护筒、制备泥浆、钻孔、清底、钢筋笼制作、吊装、灌注水下混凝土等。参见教材P147。",{"id":6,"name":27,"category":28,"favorite":29},"一建公路工程实务","建筑工程",0]