[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1133387":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1133387,796,1,"单选题","关于钢板桩围堰说法错误的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施打前，钢板桩的锁口应用止水材料捻缝，以防漏水",false,{"key":16,"text":17,"correct":18},"B","施打顺序按施工组织设计进行，一般由下游分两头向上游合龙。",true,{"key":20,"text":21,"correct":14},"C","钢板桩可用锤击、振动、射水等方法下沉",{"key":23,"text":24,"correct":14},"D","接长的钢板桩，其相邻两钢板桩的接头位置应上下错开","施打顺序按施工组织设计进行，一般由上游分两头向下游合龙。",{"id":6,"name":27,"category":28,"favorite":29},"一建公路工程实务","建筑工程",0]