[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1133339":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1133339,796,1,"单选题","在悬臂浇筑施工中，挂篮组拼后，应全面检查安装质量，并对挂篮进行试压，以消除结构非弹性变形。挂篮试压的最大荷载一般可按（）考虑。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","全跨浇筑梁段重量的1.2倍",false,{"key":16,"text":17,"correct":14},"B","各悬浇梁段平均重量的1.2倍",{"key":19,"text":20,"correct":21},"C","最大悬浇梁段重量的1.3倍",true,{"key":23,"text":24,"correct":14},"D","各悬浇粱段平均重量的1.3倍","本题考查的是悬臂浇筑施工。挂篮组拼后，应全面检查安装质量，并对挂篮进行试压，以消除结构的非弹性变形。挂篮试压的最大荷载一般可按最大悬浇梁段重量的1.3倍考虑。挂篮试压通常采用水箱加压法、试验台加压法及砂袋法。",{"id":6,"name":27,"category":28,"favorite":29},"一建公路工程实务","建筑工程",0]