[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1133327":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1133327,796,1,"单选题","在浇筑箱梁顶板和翼板混凝土时，为防止混凝土开裂，浇筑顺序应为（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","从内侧向外侧分两次完成",false,{"key":16,"text":17,"correct":14},"B","从内侧向外侧一次完成",{"key":19,"text":20,"correct":14},"C","从外侧向内侧分两次完成",{"key":22,"text":23,"correct":24},"D","从外侧向内侧一次完成",true,"本题考查的是悬臂浇筑施工。浇筑顶板及翼板混凝土时，应从外侧向内侧一次完成，以防发生裂纹。",{"id":6,"name":27,"category":28,"favorite":29},"一建公路工程实务","建筑工程",0]