[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1133169":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1133169,796,1,"单选题","培土路肩施工流程为：备料→推平→平整→X→Y→平整→碾压，其中X、Y工序分别是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","回填、切边",false,{"key":16,"text":17,"correct":14},"B","切边、回填",{"key":19,"text":20,"correct":21},"C","静压、切边",true,{"key":23,"text":24,"correct":14},"D","切边、静压","本题考查的是路肩施工。土路肩施工流程：备料→推平→平整→静压→切边→平整→碾压。",{"id":6,"name":27,"category":28,"favorite":29},"一建公路工程实务","建筑工程",0]