[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1132940":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1132940,796,1,"单选题","关于仰拱和底板施工错误的是（）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","仰拱混凝土超前拱墙混凝土施工的超前距离，宜保持3倍以上衬砌循环作业长度。",false,{"key":16,"text":17,"correct":18},"B","仰拱施工宜左右半幅分次浇筑。",true,{"key":20,"text":21,"correct":14},"C","隧道底部（包括仰拱），超挖在允许范围内应采用与衬砌相同强度等级混凝土浇筑",{"key":23,"text":24,"correct":14},"D","仰拱以上的混凝土或片石混凝土应在仰拱混凝土达到设计强度的70%后施工。","仰拱施工宜整断面一次成型，不宜左右半幅分次浇筑。",{"id":6,"name":27,"category":28,"favorite":29},"一建公路工程实务","建筑工程",0]