[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-795-48":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":652},{"id":5,"name":6,"category":7,"favorite":8},795,"一建工程法规及相关知识","建筑工程",0,48,50,2683,[13,34,46,58,70,88,103,118,133,145,157,169,181,193,205,217,227,242,254,266,278,293,305,317,332,344,357,371,383,396,408,420,431,443,455,467,479,491,503,515,525,537,549,563,577,592,604,616,628,640],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1133894,1,"单选题","某施工合同约定以《建设工程价款结算暂行办法》作为结算依据，该工程结算价约4000万元，发包人应从接到承包人竣工结算报告和完整的竣工结算资料之日起（ ）天内核对（审查）完毕并提出审查意见。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","20",false,{"key":24,"text":25,"correct":22},"B","30",{"key":27,"text":28,"correct":22},"C","60",{"key":30,"text":31,"correct":32},"D","45",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1133895,"关于建设工程未经竣工验收，发包人擅自使用后又以使用部分质量不符合约定为由主张权利的说法，正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"发包人以装饰工程质量不符合约定主张索赔的，应予支持",{"key":24,"text":41,"correct":32},"承包人应当在工程的合理使用寿命内对地基基础和主题结构质量承担责任",{"key":27,"text":43,"correct":22},"凡不符合合同约定或者验收规范的工程质量问题，承包人应当承担责任",{"key":30,"text":45,"correct":22},"承包人的保修责任可以免除",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1133896,"施工企业承建的办公大楼没有经过验收，建设单位就提前使用，2年后该办公楼主体结构出现质量问题。关于该大楼质量问题的说法，正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":32},"主体结构的最低保修期限是设计的合理使用年限，施工企业应当承担保修责任",{"key":24,"text":53,"correct":22},"由于建设单位提前使用，施工企业不需要承担保修责任",{"key":27,"text":55,"correct":22},"施工企业是否承担保修责任，取决于建设单位是否已经全额支付工程款",{"key":30,"text":57,"correct":22},"超过2年保修期后，施工企业不承担保修责任",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1133897,"某施工合同约定按固定价结算工程价款。完工后双方无法就调价问题达成一致，施工企业起诉并请求进行造价鉴定。关于该案鉴定的说法，正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"鉴定申请应当在庭审结束前提出",{"key":24,"text":65,"correct":22},"鉴定报告由造价主管部门出具",{"key":27,"text":67,"correct":32},"法院对鉴定请求不予支持",{"key":30,"text":69,"correct":22},"鉴定期间计入审限",{"id":71,"libraryId":5,"type":72,"typeLabel":73,"stem":74,"options":75,"answer":87,"analysis":33},1133898,2,"多选题","下列情形中，发包人应当承担过错责任的有（ ）。",[76,78,80,82,84],{"key":20,"text":77,"correct":32},"发包人提供的设计图纸有缺陷，造成工程质量缺陷",{"key":24,"text":79,"correct":32},"发包人提供的设备不符合强制标准，引发工程质量缺陷",{"key":27,"text":81,"correct":32},"发包人直接指定分包人分包专业工程，分包工程发生质量缺陷",{"key":30,"text":83,"correct":22},"发包人未组织竣工验收擅自使用工程，主体结构出现质量缺陷",{"key":85,"text":86,"correct":32},"E","发包人指定购买的材料、建筑构配件不符合强制性标准，造成工程质量缺陷","ABCE",{"id":89,"libraryId":5,"type":72,"typeLabel":73,"stem":90,"options":91,"answer":102,"analysis":33},1133899,"建设工程竣工前，当事人对工程质量发生争议，经鉴定工程质量合格，关于竣工日期，说法正确的有（ ）。",[92,94,96,98,100],{"key":20,"text":93,"correct":22},"应当以合同约定的竣工日期作为竣工日期",{"key":24,"text":95,"correct":32},"应当以鉴定合格日期为竣工日期",{"key":27,"text":97,"correct":32},"鉴定日期为顺延工期的期间",{"key":30,"text":99,"correct":22},"应当以申请鉴定日期作为竣工日期",{"key":85,"text":101,"correct":22},"应当以提交竣工验收报告的日期为竣工日期","BC",{"id":104,"libraryId":5,"type":72,"typeLabel":73,"stem":105,"options":106,"answer":117,"analysis":33},1133900,"建设单位因急于投产，擅自使用了未经竣工验收的工程。使用过程中，建设单位发现了一些质量缺陷，遂以质量不符合约定为由将施工单位诉到人民法院，则下列情形中，能够获得人民法院支持的有（ ）。",[107,109,111,113,115],{"key":20,"text":108,"correct":22},"有防水要求的卫生间发生渗漏",{"key":24,"text":110,"correct":32},"基础底板断裂",{"key":27,"text":112,"correct":22},"电气管线不通路",{"key":30,"text":114,"correct":22},"给水管道接口漏水",{"key":85,"text":116,"correct":32},"主体结构明显倾斜","BE",{"id":119,"libraryId":5,"type":72,"typeLabel":73,"stem":120,"options":121,"answer":132,"analysis":33},1133901,"建设工程竣工结算分为（ ）。",[122,124,126,128,130],{"key":20,"text":123,"correct":22},"分部工程竣工结算",{"key":24,"text":125,"correct":22},"分项工程竣工结算",{"key":27,"text":127,"correct":32},"单项工程竣工结算",{"key":30,"text":129,"correct":32},"单位工程竣工结算",{"key":85,"text":131,"correct":32},"项目竣工总结算","CDE",{"id":134,"libraryId":5,"type":15,"typeLabel":16,"stem":135,"options":136,"answer":27,"analysis":33},1133903,"某宾馆工程，由于业主急于按期开业迎客，于工程完工后在未进行竣工验收情况下就对外营业，使用中发现部分客房出现漏水现象，则该质量责任应由（ ）承担。",[137,139,141,143],{"key":20,"text":138,"correct":22},"总承包人",{"key":24,"text":140,"correct":22},"防水分包人",{"key":27,"text":142,"correct":32},"业主",{"key":30,"text":144,"correct":22},"物业公司",{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":24,"analysis":33},1133904,"关于发包人收到竣工结算文件后，在约定期限内不予答复，视为认可竣工结算文件的说法，正确的是（ ）。",[149,151,153,155],{"key":20,"text":150,"correct":22},"必须在合同中有此约定，才可作为结算依据",{"key":24,"text":152,"correct":32},"这是法定的视为认可竣工结算文件的情形",{"key":27,"text":154,"correct":22},"即使合同通用条款中由此约定，也不能作为结算依据",{"key":30,"text":156,"correct":22},"此约定即使写入合同中，也属无效条款",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":24,"analysis":33},1133905,"施工单位所承建的某办公楼，没有经过验收建设单位就提前使用。3年后，办公楼主体结构出现质量问题，下列说法正确的是（ ）。",[161,163,165,167],{"key":20,"text":162,"correct":22},"主体结构的最低保修期限应是50年，施工单位需要承担保修责任",{"key":24,"text":164,"correct":32},"主体结构的最低保修期限应是设计的合理使用年限，施工单位需要承担保修责任",{"key":27,"text":166,"correct":22},"施工单位是否承担保修责任，取决于建设单位是否已经足额支付工程款",{"key":30,"text":168,"correct":22},"由于建设单位提前使用，施工单位不需要承担保修责任",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":24,"analysis":33},1133906,"发包人擅自使用未经验收的建设工程，发现质量问题的，应当()。",[173,175,177,179],{"key":20,"text":174,"correct":22},"由承包人负主要责任，发包人承担补充责任",{"key":24,"text":176,"correct":32},"由发包人与承包人一起承担连带责任",{"key":27,"text":178,"correct":22},"由发包人承担责任",{"key":30,"text":180,"correct":22},"由发包人承担主要责任，承包人承担次要责任",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":27,"analysis":33},1133907,"根据《消防法》,除人员密集的大型场所和特殊工程以外的一般建设工程消防验收,（ ）。2017真题",[185,187,189,191],{"key":20,"text":186,"correct":22},"施工企业应当向公安机关消防机构申请消防验收",{"key":24,"text":188,"correct":22},"建设单位应当先行备案后,方可进行消防验收",{"key":27,"text":190,"correct":32},"建设单位在验收后应当报公安机关消防机构备案",{"key":30,"text":192,"correct":22},"可以不经过消防验收,由公安机关消防机构进行抽查",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":24,"analysis":33},1133908,"对于非施工单位原因造成的质量问题，施工单位也应负责返修，造成的损失及返修费用最终由（ ）负责。☆2014真题",[197,199,201,203],{"key":20,"text":198,"correct":22},"监理单位",{"key":24,"text":200,"correct":32},"责任方",{"key":27,"text":202,"correct":22},"建设单位",{"key":30,"text":204,"correct":22},"施工单位",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":27,"analysis":33},1133909,"关于竣工工程质量问题处理的说法，正确的是（ ）。 2016",[209,211,213,215],{"key":20,"text":210,"correct":22},"因发包人提供的设计有缺陷，造成建设工程质量缺陷的，发包人不承担责任",{"key":24,"text":212,"correct":22},"因承包人的过错造成的质量问题，发包人可以要求承包人修理、返工，但不能减少支付工程价款",{"key":27,"text":214,"correct":32},"工程竣工时发现质量问题，无论是建设单位责任还是施工企业责任，施工企业都有义务进行修复或返修",{"key":30,"text":216,"correct":22},"未经竣工验收，发包人擅自使用建设工程的，工程质量责任全部由发包人承担",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":27,"analysis":33},1133910,"关于建设工程未经竣工验收，发包人擅自使用后又以使用部分质量不符合约定为由主持权利的说法，正确的是（ ）。2017真题",[221,222,224,226],{"key":20,"text":39,"correct":22},{"key":24,"text":223,"correct":22},"凡不符合合同约定或者验收规范的工程质量问题，承包人均应当承担责任",{"key":27,"text":225,"correct":32},"承包人应当在工程的合理使用寿命内对地基基础和主体结构质量承担责任",{"key":30,"text":45,"correct":22},{"id":228,"libraryId":5,"type":72,"typeLabel":73,"stem":229,"options":230,"answer":241,"analysis":33},1133911,"某工程已具备竣工条件，承包人在提交竣工验收报告的同时，向发包人递交竣工结算报告及完整的结算资料。关于该工程竣工验收和质量责任等的说法，正确的有（ ）。2014",[231,233,235,237,239],{"key":20,"text":232,"correct":22},"工程质量保证金应在保修期满后返还",{"key":24,"text":234,"correct":22},"发包人要求承包人完成合同以外零星项目，承包人未在规定时间内向发包人提出施工签证的，施工后可向发包人申请费用索赔",{"key":27,"text":236,"correct":32},"建设工程竣工时发现的质量问题或者质量缺陷，无论是建设单位的责任还是施工单位的责任，施工单位都有义务进行修复或返修",{"key":30,"text":238,"correct":22},"当事人对工程造价发生合同纠纷时，应当向仲裁机构申请仲裁或向人民法院起诉",{"key":85,"text":240,"correct":32},"承包人应当在建设工程的合理使用寿命内对地基基础工程和主体结构质量承担民事责任","CE",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":24,"analysis":33},1133912,"根据《最高人民法院关于审理建设工程施工合同纠纷案件适用法律问题的解释》，关于竣工工程质量责任的说法，正确的是（）。2018真题",[246,248,250,252],{"key":20,"text":247,"correct":22},"发包人指定分包人分包专业工程，应由分包人对承包人承担责任",{"key":24,"text":249,"correct":32},"建设工程未经竣工验收投入使用后，承包人在合理使用寿命内对地基基础工程质量承担民事责任",{"key":27,"text":251,"correct":22},"建设工程未经竣工验收投入使用，不免除承包人的保修责任",{"key":30,"text":253,"correct":22},"建设工程竣工时发现的质量问题，如果不是承包人的原因导致的，承包人有权拒绝修复",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":20,"analysis":33},1133914,"工程经建设单位组织验收合格后投入使用，2年后外墙出现裂缝，经查是由于设计缺陷造成的，则下列说法正确的是（ ）。2014",[258,260,262,264],{"key":20,"text":259,"correct":32},"施工单位维修，建设单位直接承担费用",{"key":24,"text":261,"correct":22},"建设单位维修并承担费用",{"key":27,"text":263,"correct":22},"施工单位维修并承担费用",{"key":30,"text":265,"correct":22},"施工单位维修，设计单位直接承担费用",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":30,"analysis":33},1133915,"（2019年真题）关于建设工程未经竣工验收，建设单位擅自使用后，又以使用部分质量不符合约定为由主张权利的说法，正确的是（）",[270,272,274,276],{"key":20,"text":271,"correct":22},"建设单位以装饰工程质量不符合约定主张保修的，应予支持",{"key":24,"text":273,"correct":22},"凡不符合合同约定或者验收规范的工程质量问题，施工企业均应当承担民事责任",{"key":27,"text":275,"correct":22},"施工企业的保修责任可以全部免除",{"key":30,"text":277,"correct":32},"施工企业应当在工程的合理使用寿命内对地基基础和主体结构质量承担民事责任",{"id":279,"libraryId":5,"type":72,"typeLabel":73,"stem":280,"options":281,"answer":292,"analysis":33},1133916,"（2019年真题）根据《最高人民法院关于审理建设工程施工合同纷案件适用法律问题的解释》,发包人的下列行为中,造成建设工程质量缺陷,应当承担过错责任的有()。",[282,284,286,288,290],{"key":20,"text":283,"correct":32},"提供的设计有缺陷",{"key":24,"text":285,"correct":32},"提供的建筑料不符合强制性标准",{"key":27,"text":287,"correct":22},"同意总承包人选择分包人分包专业程",{"key":30,"text":289,"correct":32},"指定购买的建筑构配件不符合强制性标准",{"key":85,"text":291,"correct":32},"直接指定分包人分包专业工程","ABDE",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":24,"analysis":33},1133917,"某工程项目于2009年3月1日通过竣工验收，并于2009年3月12日办理了备案。根据规定，建设单位向有关部门移交工程档案的最后时限为（ ）。",[297,299,301,303],{"key":20,"text":298,"correct":22},"2009年4月1日",{"key":24,"text":300,"correct":32},"2009年6月1日",{"key":27,"text":302,"correct":22},"2009年3月12日",{"key":30,"text":304,"correct":22},"2009年6月12日",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":24,"analysis":33},1133918,"根据《城市建设档案管理规定》，建设单位应当在工程竣工验收后（ ）内，向城建档案馆送一套符合规定的建设工程档案。",[309,311,313,315],{"key":20,"text":310,"correct":22},"6个月",{"key":24,"text":312,"correct":32},"3个月",{"key":27,"text":314,"correct":22},"9个月",{"key":30,"text":316,"correct":22},"1年",{"id":318,"libraryId":5,"type":72,"typeLabel":73,"stem":319,"options":320,"answer":331,"analysis":33},1133919,"根据《城市建设档案管理规定》，施工企业一般应提交的档案资料有（）。2018真题",[321,323,325,327,329],{"key":20,"text":322,"correct":32},"工程技术档案资料",{"key":24,"text":324,"correct":32},"竣工图",{"key":27,"text":326,"correct":32},"工程检验评定资料",{"key":30,"text":328,"correct":22},"工程结算资料",{"key":85,"text":330,"correct":22},"材料采购合同","ABC",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":20,"analysis":33},1133920,"建设单位办理工程竣工验收备案应提交的材料不包括（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":32},"规划、招投标、公安消防、环保部门的完整备案文件",{"key":24,"text":339,"correct":22},"工程竣工验收报告",{"key":27,"text":341,"correct":22},"施工企业签署的工程质量保修书",{"key":30,"text":343,"correct":22},"住宅工程的《住宅质量保证书》、《住宅使用说明书》",{"id":345,"libraryId":5,"type":72,"typeLabel":73,"stem":346,"options":347,"answer":292,"analysis":33},1133921,"某体育馆项目竣工验收后，建设单位办理工程竣工验收备案应当提交下列文件包括（ ）。",[348,350,352,354,356],{"key":20,"text":349,"correct":32},"由规划、环保等部门出具的认可文件或者准许使用文件",{"key":24,"text":351,"correct":32},"公安消防部门出具的对大型的人员密集场所和其他特殊建设工程验收合格的证明文件",{"key":27,"text":353,"correct":22},"《质量保证书》和《使用说明书》",{"key":30,"text":355,"correct":32},"质量保修书",{"key":85,"text":339,"correct":32},{"id":358,"libraryId":5,"type":72,"typeLabel":73,"stem":359,"options":360,"answer":370,"analysis":33},1133923,"建设单位办理工程竣工验收备案应提交的材料包括（ ）。",[361,363,365,366,368],{"key":20,"text":362,"correct":22},"建设项目立项批准文件",{"key":24,"text":364,"correct":32},"工程竣工验收备案表",{"key":27,"text":339,"correct":32},{"key":30,"text":367,"correct":32},"施工单位签署的工程质量保修书",{"key":85,"text":369,"correct":32},"施工中有关质量检测数据和试验资料","BCDE",{"id":372,"libraryId":5,"type":72,"typeLabel":73,"stem":373,"options":374,"answer":382,"analysis":33},1133924,"建设单位办理大型公共建筑工程竣工验收备案应提交的材料有（ ）。",[375,376,378,379,380],{"key":20,"text":364,"correct":32},{"key":24,"text":377,"correct":22},"住宅使用说明书",{"key":27,"text":339,"correct":32},{"key":30,"text":367,"correct":32},{"key":85,"text":381,"correct":32},"公安机关消防机构出具的消防验收合格证明文件","ACDE",{"id":384,"libraryId":5,"type":72,"typeLabel":73,"stem":385,"options":386,"answer":395,"analysis":33},1133925,"某大型体育场项目竣工验收合格后15日内，建设单位应向有关部门提交的竣工验收备案文件包括（ ）。",[387,388,389,391,393],{"key":20,"text":364,"correct":32},{"key":24,"text":339,"correct":32},{"key":27,"text":390,"correct":32},"规划、消防、节能、环保部门出具的认可文件或准用文件",{"key":30,"text":392,"correct":32},"施工单位签署的质量保修书",{"key":85,"text":394,"correct":22},"施工许可证","ABCD",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":27,"analysis":33},1133926,"下列关于建设工程消防设计的审核与验收，说法不正确的是（ ）。",[400,402,404,406],{"key":20,"text":401,"correct":22},"建筑构件和建筑材料的防火性能必须符合国家标准或者行业标准",{"key":24,"text":403,"correct":22},"未经公安消防机构审核或者经审核不合格的，建设行政主管部门不得发给施工许可证，建设单位不得施工",{"key":27,"text":405,"correct":32},"经公安消防机构审核的建筑工程消防设计需要变更的，应当报建设行政主管部门核准",{"key":30,"text":407,"correct":22},"按照国家工程建设消防技术标准进行消防设计的建筑竣工时，必须经公安消防机构进行消防验收；未经验收或者经验收不合格的，不得投入使用",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":30,"analysis":33},1133927,"关于不符合建筑节能标准的建筑工程说法，错误的是（ ）。",[412,414,416,418],{"key":20,"text":413,"correct":22},"不得批准开工建设",{"key":24,"text":415,"correct":22},"已开工建设的，应当责令停止施工",{"key":27,"text":417,"correct":22},"已开工建设的，应当责令限期改正",{"key":30,"text":419,"correct":32},"已经建成的，可以正常使用",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":24,"analysis":33},1133928,"建设节能分部工程验收会议由（ ）主持。",[424,426,428,429],{"key":20,"text":425,"correct":22},"建筑节能工程分包人",{"key":24,"text":427,"correct":32},"总监理工程师",{"key":27,"text":138,"correct":22},{"key":30,"text":430,"correct":22},"建设单位法定代表人",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":24,"analysis":33},1133929,"某大型建设工程项目竣工后，建设单位于2005年4月1日向环境保护行政主管部门申请配套建设的环境保护设施竣工验收，环境保护行政主管部门于2005年4月5日收到申请。则环保行政主管部门完成该设施验收的截止日期为（ ）。",[435,437,439,441],{"key":20,"text":436,"correct":22},"2005年4月20日",{"key":24,"text":438,"correct":32},"2005年5月5日",{"key":27,"text":440,"correct":22},"2005年5月20日",{"key":30,"text":442,"correct":22},"2005年6月5日",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":24,"analysis":33},1133930,"环境保护设施验收，应当与主体工程竣工验收（ ）进行。",[447,449,451,453],{"key":20,"text":448,"correct":22},"分别",{"key":24,"text":450,"correct":32},"同时",{"key":27,"text":452,"correct":22},"交叉",{"key":30,"text":454,"correct":22},"顺序",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":24,"analysis":33},1133931,"建设项目需要进行试生产的，应当（ ）申请配套建设的环境保护设施竣工验收。",[459,461,463,465],{"key":20,"text":460,"correct":22},"在投入试生产之日",{"key":24,"text":462,"correct":32},"投入试生产之日起3个月内",{"key":27,"text":464,"correct":22},"投入试生产之日前3个月",{"key":30,"text":466,"correct":22},"分期验收后",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":27,"analysis":33},1133933,"建设单位应当在（ ）向规划部门提出规划验收申请。",[471,473,475,477],{"key":20,"text":472,"correct":22},"竣工验收前",{"key":24,"text":474,"correct":22},"竣工验收同时",{"key":27,"text":476,"correct":32},"竣工验收后6个月内",{"key":30,"text":478,"correct":22},"竣工验收后1个月内",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":27,"analysis":33},1133934,"对于环境保护“三同时”制度，下列说法不正确的是（ ）。",[483,485,487,489],{"key":20,"text":484,"correct":22},"建设项目需要配套、建设的环境保护设施，必须与主体工程同时设计，同时施工，同时投产使用",{"key":24,"text":486,"correct":22},"环境保护“三同时”制度是建设项目环境保护法律制度的重要组成部分",{"key":27,"text":488,"correct":32},"建设项目的主体工程完工后，需要进行试生产的，其配套建设的环境保护设施可独自运行",{"key":30,"text":490,"correct":22},"建设项目竣工后，建设单位应当向审批环境影响评价文件的环境保护行政主管部门申请该建设项目需要配套建设的环境保护设施竣工验收",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":20,"analysis":33},1133935,"建设单位应自建设项目投入试生产之日起（ ）个月内，向有关部门申请该建设项目需要配套建设的环境保护设施竣工验收。",[495,497,499,501],{"key":20,"text":496,"correct":32},"3",{"key":24,"text":498,"correct":22},"1",{"key":27,"text":500,"correct":22},"2",{"key":30,"text":502,"correct":22},"5",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":24,"analysis":33},1133936,"按照国家工程建筑消防技术标准需要进行消防设计的建筑工程，建设单位应当将建筑工程的消防设计图纸及有关资料报送（ ）审核。",[507,509,511,513],{"key":20,"text":508,"correct":22},"建设行政主管部门",{"key":24,"text":510,"correct":32},"公安消防机构",{"key":27,"text":512,"correct":22},"消防检测机构",{"key":30,"text":514,"correct":22},"质量监督机构",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":24,"analysis":33},1133937,"根据《建设工程质量管理条例》，建设单位应当自建设工程竣工验收合格之日起（ ）日内，将建设工程验收报告和规划、公安消防、环保等部门出具的认可文件或者准许使用文件报建设行政主管部门或者其他有关部门备案。",[519,520,522,524],{"key":20,"text":502,"correct":22},{"key":24,"text":521,"correct":32},"15",{"key":27,"text":523,"correct":22},"10",{"key":30,"text":25,"correct":22},{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":30,"analysis":33},1133938,"关于建设工程节能分部工程的验收的组织及参加人员，表述正确的是（ ）。",[529,531,533,535],{"key":20,"text":530,"correct":22},"应由监理工程师主持，施工单位相关专业的质量检查员与施工员参加",{"key":24,"text":532,"correct":22},"应由监理工程师主持，必要时可邀请设计单位相关专业的人员参加",{"key":27,"text":534,"correct":22},"应由总监理工程师主持，必要时可邀请设计单位相关专业的人员参加",{"key":30,"text":536,"correct":32},"应由总监理工程师主持，设计单位节能设计人员应当参加",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":20,"analysis":33},1133939,"对于大型人员密集场所或特殊工程外的一般建设工程，其消防验收方式为（ ）。",[541,543,545,547],{"key":20,"text":542,"correct":32},"在验收后应当报公安机关消防机构备案",{"key":24,"text":544,"correct":22},"建设单位应当先行备案后进行消防验收",{"key":27,"text":546,"correct":22},"可以不经消防验收，由公安机关消防机构进行抽查",{"key":30,"text":548,"correct":22},"施工单位应当向公安机关消防机构申请消防验收",{"id":550,"libraryId":5,"type":72,"typeLabel":73,"stem":551,"options":552,"answer":370,"analysis":33},1133940,"建设工程竣工验收合格后，还应当办理（ ）。",[553,555,557,559,561],{"key":20,"text":554,"correct":22},"施工安全验收",{"key":24,"text":556,"correct":32},"规划验收",{"key":27,"text":558,"correct":32},"消防验收或备案",{"key":30,"text":560,"correct":32},"环保验收",{"key":85,"text":562,"correct":32},"节能验收",{"id":564,"libraryId":5,"type":72,"typeLabel":73,"stem":565,"options":566,"answer":87,"analysis":33},1133942,"根据《消防法》，关于消防设计的审核、验收及安全指挥的说法，正确的有（ ）。",[567,569,571,573,575],{"key":20,"text":568,"correct":32},"消防设计图纸审核不合格的，不得颁发施工许可证",{"key":24,"text":570,"correct":32},"自动消防系统的操作员必须持证上岗",{"key":27,"text":572,"correct":32},"建设工程未经消防验收或消防验收不合格的，不得擅自使用",{"key":30,"text":574,"correct":22},"消防器材的经销人员必须持证上岗",{"key":85,"text":576,"correct":32},"企业、事业单位的主要负责人是本单位的消防安全负责人",{"id":578,"libraryId":5,"type":72,"typeLabel":73,"stem":579,"options":580,"answer":591,"analysis":33},1133943,"工程项目节能工程，存在（ ）时，不得组织节能验收。",[581,583,585,587,589],{"key":20,"text":582,"correct":32},"隐蔽验收记录等技术档案和施工管理资料不完整",{"key":24,"text":584,"correct":32},"违反强制性条文的质量问题而未整改完毕",{"key":27,"text":586,"correct":22},"参加验收各方主体验收意见不一致的",{"key":30,"text":588,"correct":22},"参加验收人员不具备相应资格的",{"key":85,"text":590,"correct":22},"验收程序和执行标准不符合要求的","AB",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":20,"analysis":33},1133944,"关于环境保护设施竣工验收的说法，正确的是（ ）。2014",[596,598,600,602],{"key":20,"text":597,"correct":32},"环境保护设施未经竣工验收，主体工程投入使用的，由环境保护行政主管部门责令停止使用",{"key":24,"text":599,"correct":22},"需要进行试生产的建设项目，环境保护设施应当在投入试生产前申请竣工验收",{"key":27,"text":601,"correct":22},"分期建设、分期投入生产或者使用的建设项目，其相应的环境保护设施应当同时验收",{"key":30,"text":603,"correct":22},"建设项目投入试生产超过3个月，建设单位未申请环境保护设施竣工验收的，应当处10万元以下的罚款",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":27,"analysis":33},1133945,"根据《消防法》，关于建设工程竣工消防验收的说法，正确的是（ ）。 2016",[608,610,612,614],{"key":20,"text":609,"correct":22},"已经依法备案的建设工程消防设计确需修改的，修改后建设单位不必重新申请消防设计备案",{"key":24,"text":611,"correct":22},"公安机关消防机构应当自受理消防验收申请之日起30日内组织消防验收，并出具消防验收意见",{"key":27,"text":613,"correct":32},"公安机关消防机构实施消防验收，可以收取成本费",{"key":30,"text":615,"correct":22},"依法不需要取得施工许可的建设工程，可以不进行竣工验收消防备案",{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":24,"analysis":33},1133946,"（2019年真题）关于建设工程竣工规划验收的说法,正确的是（）",[620,622,624,626],{"key":20,"text":621,"correct":22},"建设工程竣工后,施工企业应当向城乡规划主管部门提出竣工规划验收申请",{"key":24,"text":623,"correct":32},"竣工规划验收合格的,由城乡规划主管部门岀具规划认可文件或核发建设工程规划验收合格证",{"key":27,"text":625,"correct":22},"报送有关竣工验收材料必须在竣工验收后1年内完成",{"key":30,"text":627,"correct":22},"未在规定时间内向城乡规划主管部门报送竣工验收材料的,责令限期补报,并处罚款",{"id":629,"libraryId":5,"type":15,"typeLabel":16,"stem":630,"options":631,"answer":27,"analysis":33},1133947,"（2019年真题）关于民用建筑强制节能标准的说法,正确的是()。",[632,634,636,638],{"key":20,"text":633,"correct":22},"不符合民用建筑强制性节能标准的项目,已经建成的必须拆除",{"key":24,"text":635,"correct":22},"监理单位发现某企业不按照民用建筑强制性节能标准施工的,应当直接向建设单位报告",{"key":27,"text":637,"correct":32},"不符合民用建筑强制性节能标准的项目,建设单位不得开工建设",{"key":30,"text":639,"correct":22},"监理单位发现施工企业不按照民用建筑强制性节能标准施工的,应当直接向有关行政部门报告",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":20,"analysis":33},1133948,"（2020年真题）关于建设工程竣工规划验收的说法，正确的是（ ）。",[644,646,648,650],{"key":20,"text":645,"correct":32},"建设工程未经核实或者经核实不符合规划条件的，建设单位不得组织竣工验收",{"key":24,"text":647,"correct":22},"建设单位应当向住房城乡建设上管部门提出竣工规划验收申请",{"key":27,"text":649,"correct":22},"对于验收合格的建设工程，城乡规划行政主管部门出具建设工程规划许可证",{"key":30,"text":651,"correct":22},"建设单位应当在竣工验收后3个月内向城乡规划行政主管部门报送有关线工验收资料",[653,656,659,662,665,668],{"id":15,"name":654,"category":7,"favorite":655},"领导干部任职前廉政法规知识测试题",92,{"id":657,"name":658,"category":7,"favorite":15},595,"建筑结构与设备",{"id":660,"name":661,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":663,"name":664,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":666,"name":667,"category":7,"favorite":8},534,"BIM工程师",{"id":669,"name":667,"category":7,"favorite":8},535]