[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-795-33":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":654},{"id":5,"name":6,"category":7,"favorite":8},795,"一建工程法规及相关知识","建筑工程",0,33,50,2683,[13,34,46,64,79,93,107,122,134,146,158,170,182,194,206,218,229,241,256,271,285,300,315,327,339,351,363,375,387,399,411,423,435,447,459,471,482,494,506,518,533,545,557,569,581,593,608,620,632,642],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1132629,1,"单选题","对于施工合同订立的特殊性的理解错误的一项是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","要约和承诺是订立合同的两个基本程序",false,{"key":24,"text":25,"correct":22},"B","投标文件中含有投标人期望订立的施工合同的具体内容，表达了投标人期望订立合同的意思，投标文件是要约",{"key":27,"text":28,"correct":22},"C","中标通知书是招标人对投标文件的肯定答复，因而是承诺",{"key":30,"text":31,"correct":32},"D","建设工程合同可以采用口头形式或者书面形式",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},1132630,"经建设单位的同意，甲建筑工程公司与乙建筑施工公司签订劳动分包合同，合同约定乙公司负责为甲公司承包的某建设项目提供劳务工作，甲公司以每工日30元支付乙公司所提供的劳务，因施工事故所造成的人员伤亡的责任一概由乙公司承担等。根据我国《合同法》规定，此分包合同（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"合法有效",{"key":24,"text":41,"correct":22},"因损害社会公共利益而无效",{"key":27,"text":43,"correct":22},"因显失公平而可撤销",{"key":30,"text":45,"correct":32},"因施工事故所造成的人员伤亡的责任一概由乙公司承担的条款无效",{"id":47,"libraryId":5,"type":48,"typeLabel":49,"stem":50,"options":51,"answer":63,"analysis":33},1132631,2,"多选题","《合同法》规定，合同内容一般包括（ ）等条款。",[52,54,56,58,60],{"key":20,"text":53,"correct":32},"标的",{"key":24,"text":55,"correct":32},"数量.质量",{"key":27,"text":57,"correct":32},"价款或者报酬",{"key":30,"text":59,"correct":22},"签订地点",{"key":61,"text":62,"correct":32},"E","解决争议的方法","ABCE",{"id":65,"libraryId":5,"type":48,"typeLabel":49,"stem":66,"options":67,"answer":78,"analysis":33},1132632,"根据《合同法》规定，建设工程施工合同的一般条款包括（ ）。",[68,70,72,74,76],{"key":20,"text":69,"correct":32},"工程范围",{"key":24,"text":71,"correct":32},"建设工期",{"key":27,"text":73,"correct":32},"竣工验收",{"key":30,"text":75,"correct":32},"工程造价",{"key":61,"text":77,"correct":22},"违约责任","ABCD",{"id":80,"libraryId":5,"type":48,"typeLabel":49,"stem":81,"options":82,"answer":92,"analysis":33},1132633,"标的可以是（ ）等。",[83,84,86,88,90],{"key":20,"text":75,"correct":22},{"key":24,"text":85,"correct":32},"货币",{"key":27,"text":87,"correct":22},"劳动条件",{"key":30,"text":89,"correct":32},"劳务",{"key":61,"text":91,"correct":32},"货物","BDE",{"id":94,"libraryId":5,"type":48,"typeLabel":49,"stem":95,"options":96,"answer":106,"analysis":33},1132634,"合同的内容一般包括以下哪些条款（ ）。",[97,99,100,102,104],{"key":20,"text":98,"correct":22},"价款或者赔偿",{"key":24,"text":77,"correct":32},{"key":27,"text":101,"correct":32},"标的、数量、质量",{"key":30,"text":103,"correct":32},"当事人的名称或者姓名和住所",{"key":61,"text":105,"correct":32},"履行期限、地点和方式","BCDE",{"id":108,"libraryId":5,"type":48,"typeLabel":49,"stem":109,"options":110,"answer":121,"analysis":33},1132635,"关于工程竣工验收的说法，正确的有（ ）。",[111,113,115,117,119],{"key":20,"text":112,"correct":32},"工程竣工验收合格的，以承包人送交竣工验收报告之日为竣工日期",{"key":24,"text":114,"correct":32},"承包人送交竣工验收报告后，当事人对工程质量发生争议，工程质量经鉴定合格的，以承包人送交竣工验收报告之日为竣工日期",{"key":27,"text":116,"correct":22},"工程按发包人要求修改后经竣工验收合格的，以承包人首次送交竣工验收报告之日为竣工日期",{"key":30,"text":118,"correct":32},"承包人送交竣工验收报告后，发包人拖延验收的，以承包人送交竣工验收报告之日为竣工日期",{"key":61,"text":120,"correct":32},"建设工程未经验收，发包人擅自使用的，以建设工程转移占有之日为竣工日期","ABDE",{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":24,"analysis":33},1132636,"甲公司向乙公司购买了一批钢材，双方约定采用合同书的方式订立合同，由于施工进度紧张，在甲公司的催促之下，双方在未签字盖章之前，乙公司将钢材送到了甲公司，甲公司接受并投入工程使用。甲、乙公司之间的买卖合同（ ）。( 2015真题 )",[126,128,130,132],{"key":20,"text":127,"correct":22},"无效",{"key":24,"text":129,"correct":32},"成立",{"key":27,"text":131,"correct":22},"可变更",{"key":30,"text":133,"correct":22},"可撤销",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":24,"analysis":33},1132637,"发包人与承包人约定按照固定价结算工程款。因合同履行过程中材料价格上涨，承包人请求进行造价鉴定.则人民法院对承包人的请求应（ ）。",[138,140,142,144],{"key":20,"text":139,"correct":22},"予以支持",{"key":24,"text":141,"correct":32},"不予支持",{"key":27,"text":143,"correct":22},"征求发包人意见",{"key":30,"text":145,"correct":22},"要求承包人提供证据",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":20,"analysis":33},1132638,"某扩建工程建发单位因急于参加认证，于11月15日未经验收而使用该工程，11月20承包人提交了竣工验收报告，11月30日建设单位组织验收，12月3日工程竣工验收合格，则该工程竣工日期为（ ）。",[150,152,154,156],{"key":20,"text":151,"correct":32},"11月15日",{"key":24,"text":153,"correct":22},"11月20日",{"key":27,"text":155,"correct":22},"11月30日",{"key":30,"text":157,"correct":22},"12月3日",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":27,"analysis":33},1132639,"甲建筑公司与乙房地产开发公司签订一份建设工程承包合同，合同规定由甲公司预先垫付20％的工程款，但没有约定利息的计算方法，若甲乙公司就工程款支付发生争议，甲公司起诉至人民法院，要求乙公司支付工程款并偿还垫付工程款的利息，人民法院应（ ）。",[162,164,166,168],{"key":20,"text":163,"correct":22},"对该诉讼请求予以支持",{"key":24,"text":165,"correct":22},"对该诉讼请求不予支持",{"key":27,"text":167,"correct":32},"对工程款诉讼请求予以支持，对利息诉讼请求不予支持",{"key":30,"text":169,"correct":22},"对工程款诉讼请求不予支持，对利息诉讼请求予以支持",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":20,"analysis":33},1132640,"乙施工单位通过招标程序中标了甲开发公司的一个施工项目。签约前，甲要求让利5%，否则不签施工合同。后双方按中标价签订了备案合同，同时签订了让利5%的补充协议。竣工结算时，甲按让利协议扣减结算总价5%，乙以自己亏损为由不同意让利并向法院提起诉讼，要求按中标价结算。下列说法正确的是（ ）。",[174,176,178,180],{"key":20,"text":175,"correct":32},"应以备案合同作为结算工程价款依据",{"key":24,"text":177,"correct":22},"该补充协议属于可撤销合同",{"key":27,"text":179,"correct":22},"应以补充协议座位结算工程价款依据",{"key":30,"text":181,"correct":22},"乙方行为构成合同违约",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":27,"analysis":33},1132641,"某建设工程施工合同签订于2008年3月2日，合同约定工程开、竣工日期分别是2008年3月10日和2009年10月1日；后工程于2009年10月15日竣工验收合格，先承包人欲行使工程价款优先受偿权，其最迟必须在（ ）前行使。",[186,188,190,192],{"key":20,"text":187,"correct":22},"2010年4月1日",{"key":24,"text":189,"correct":22},"2010年10月1日",{"key":27,"text":191,"correct":32},"2010年4月15日",{"key":30,"text":193,"correct":22},"2010年10月15日",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":27,"analysis":33},1132642,"某建设工程合同约定，“工程通过竣工验收后2个月内，结清全部工程款”。2005年10月1日工程通过竣工验收，10月10日承包人提交竣工结算文件，10月20日承包几将工程移交发包人，但发包人一直未付工程余款。2006年5月1日，承包人将发包人起诉至人民法院，要求其支付工程欠款及利息。则利息起算日应为（ ）。",[198,200,202,204],{"key":20,"text":199,"correct":22},"2005年10月10日",{"key":24,"text":201,"correct":22},"2005年10月20日",{"key":27,"text":203,"correct":32},"2005年12月1日",{"key":30,"text":205,"correct":22},"2006年5月1日",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":30,"analysis":33},1132643,"某施工项目材料采购合同中，当事人对价款没有约定，未达成补充协议，也无法根据合同有关条款或交易习惯确定，则应按照（ ）的市场价格履行。",[210,212,214,216],{"key":20,"text":211,"correct":22},"合同签订地",{"key":24,"text":213,"correct":22},"履行义务一方所在地",{"key":27,"text":215,"correct":22},"材料所在地",{"key":30,"text":217,"correct":32},"订立合同时履行地",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":30,"analysis":33},1132644,"某施工合同约定承包人对基础工程垫资施工，发包人对垫付资金按银行贷款利率2倍支付利息，后发包人未按合同约定支付垫资利息，承包人诉至法院，则人民法院对垫资利息的处理，正确的是（ ）。",[222,224,225,227],{"key":20,"text":223,"correct":22},"予以追缴",{"key":24,"text":141,"correct":22},{"key":27,"text":226,"correct":22},"支持按合同约定全部支付",{"key":30,"text":228,"correct":32},"只支持按银行同类贷款利息支付",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":30,"analysis":33},1132645,"甲建筑公司与乙房地产开发公司签订了一份建设工程承包合同，合同约定，由甲公司预先垫付20%的工程款，但没有约定利息的计算方法，则该合同（ ）。",[233,235,237,239],{"key":20,"text":234,"correct":22},"因违法而无效",{"key":24,"text":236,"correct":22},"因违法而可撤销",{"key":27,"text":238,"correct":22},"因违法而效力待定",{"key":30,"text":240,"correct":32},"有效",{"id":242,"libraryId":5,"type":48,"typeLabel":49,"stem":243,"options":244,"answer":255,"analysis":33},1132646,"以下情况可能会造成工期延误，但经工程师确认，其中（ ）情况工期可相应的顺延。",[245,247,249,251,253],{"key":20,"text":246,"correct":22},"一周内停水、停电累计超过8小时",{"key":24,"text":248,"correct":32},"设计变更和工程量增加",{"key":27,"text":250,"correct":32},"发包方未按合同约定提供图纸",{"key":30,"text":252,"correct":32},"不可抗力",{"key":61,"text":254,"correct":22},"承包方因质量不合格返工","BCD",{"id":257,"libraryId":5,"type":48,"typeLabel":49,"stem":258,"options":259,"answer":270,"analysis":33},1132647,"施工单位与建设单位签订施工合同，双方没有约定付款时间，后因利息计算产生争议，则下列有关工程价款应支付日期的表述正确的有（ ）。",[260,262,264,266,268],{"key":20,"text":261,"correct":22},"建设工程没有交付的，为提交验收报告之日",{"key":24,"text":263,"correct":32},"建设工程已实际交付的，为交付之日",{"key":27,"text":265,"correct":32},"建设工程没有交付的，为提交竣工结算文件之日",{"key":30,"text":267,"correct":22},"建设工程未交付，工程价款也未结算的，为人民法院判决之日",{"key":61,"text":269,"correct":32},"建设工程未交付，工程价款也未结算的，为当事人起诉之日","BCE",{"id":272,"libraryId":5,"type":48,"typeLabel":49,"stem":273,"options":274,"answer":270,"analysis":33},1132648,"当事人就合同履行地点约定不明确，不能达成补充协议，双方不能根据合同有关条款和交易习惯确定的，则（ ）。",[275,277,279,281,283],{"key":20,"text":276,"correct":22},"接受履行方有权选择履行地点",{"key":24,"text":278,"correct":32},"给付货币的，在接受货币一方所在地履行",{"key":27,"text":280,"correct":32},"交付不动产的，在不动产所在地履行",{"key":30,"text":282,"correct":22},"履行义务一方有权选择履行地点",{"key":61,"text":284,"correct":32},"其他标的，在履行义务一方所在地履行",{"id":286,"libraryId":5,"type":48,"typeLabel":49,"stem":287,"options":288,"answer":299,"analysis":33},1132649,"根据《最高人民法院关于审理建设工程施工合同纠纷案件适用法律问题的解释》规定，发包人具有（ ）情形的，承包人请求解除合同的，应予支持。",[289,291,293,295,297],{"key":20,"text":290,"correct":32},"未按照约定支付工程款",{"key":24,"text":292,"correct":32},"提供的主要建筑材料、建筑构配件和设备不符合强制标准",{"key":27,"text":294,"correct":22},"单方面要求变更原先的工程设计方案",{"key":30,"text":296,"correct":22},"干预承包人采购",{"key":61,"text":298,"correct":32},"不履行约定的协助义务","ABE",{"id":301,"libraryId":5,"type":48,"typeLabel":49,"stem":302,"options":303,"answer":314,"analysis":33},1132650,"发包人将在建工程抵押给银行贷款，后因发包人经营状况不佳而无力还贷及支付工程款，则下列关于承包人权利的说法中，正确的是（ ）。",[304,306,308,310,312],{"key":20,"text":305,"correct":32},"承包人可申请人民法院将该工程拍卖",{"key":24,"text":307,"correct":22},"承包人无权就该工程拍卖款优先于银行受偿",{"key":27,"text":309,"correct":22},"承包人申请拍卖该工程，应按照诉讼时效的规定，在工程竣工之日提出",{"key":30,"text":311,"correct":32},"承包人可不申请拍卖，而直接与发包人协商将工程折价",{"key":61,"text":313,"correct":22},"承包人因发包人违约所造成的损失，可在工程拍卖所得中扣除","AD",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":20,"analysis":33},1132651,"承包人、发包人以《建设工程施工合同（示范文本）》签订合同，在施工中，发包人申请延期开工，应（ ）。",[319,321,323,325],{"key":20,"text":320,"correct":32},"书面通知承包人，并顺延工期",{"key":24,"text":322,"correct":22},"承包人应在48小时内予以确认",{"key":27,"text":324,"correct":22},"承包人不予确认的工期不得顺延",{"key":30,"text":326,"correct":22},"征得承包人同意后顺延工期",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":30,"analysis":33},1132652,"当事人对欠付工程款利息计付标准没有约定时，应该按照中国人民银行的（ ）计息。",[331,333,335,337],{"key":20,"text":332,"correct":22},"国债利率",{"key":24,"text":334,"correct":22},"活期存款利率",{"key":27,"text":336,"correct":22},"同期同类存款利率",{"key":30,"text":338,"correct":32},"同期同类贷款利率",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":24,"analysis":33},1132653,"某发包人负责材料采购，欠供应商100万元。在工程实施过程中，为了筹措资金又将工程抵押给银行。工程竣工后，施工单位经多次催促，发包人始终无法支付结算价款，最后不得不向法院申请拍卖该工程。供应商和银行随后向法院起诉。在拍卖完成后，最先受偿的应是（ ）。",[343,345,347,349],{"key":20,"text":344,"correct":22},"甲材料供应商",{"key":24,"text":346,"correct":32},"施工单位",{"key":27,"text":348,"correct":22},"银行",{"key":30,"text":350,"correct":22},"按生效判决先后确定",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":27,"analysis":33},1132654,"根据《合同法》，分期付款的买受人未支付到期价款的最低金额达到全部价款的（ ），出卖人即有权要求买受人支付全部价款或者解除合同。",[355,357,359,361],{"key":20,"text":356,"correct":22},"1\u002F3",{"key":24,"text":358,"correct":22},"1\u002F2",{"key":27,"text":360,"correct":32},"1\u002F5",{"key":30,"text":362,"correct":22},"2\u002F3",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":24,"analysis":33},1132655,"发包人和承包人在合同中约定垫资但没有约定垫资利息，后双方因垫资返还发生纠纷诉至法院。关于该垫资的说法，正确的是（ ）。",[367,369,371,373],{"key":20,"text":368,"correct":22},"法律规定禁止垫资，双方约定的垫资条款无效",{"key":24,"text":370,"correct":32},"发包人应返还承包人垫资，但可以不支付利息",{"key":27,"text":372,"correct":22},"双方约定的垫资条款有效，发包人应返还承包人垫资并支付利息",{"key":30,"text":374,"correct":22},"垫资违反相关规定，应予以没收",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":20,"analysis":33},1132656,"合同关于履行费用的负担约定不明确的，由（ ）负责合同履行费用。",[379,381,383,385],{"key":20,"text":380,"correct":32},"履行义务一方",{"key":24,"text":382,"correct":22},"接受履行的一方",{"key":27,"text":384,"correct":22},"双方平均分摊",{"key":30,"text":386,"correct":22},"双方按法定比例",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":24,"analysis":33},1132657,"建设工程施工合同签订后，发包人合同外附属市政工程委托承包人施工，对此价款未做约定，后无法协商一致，则市政工程价款应按照（ ）市场价格履行。",[391,393,395,397],{"key":20,"text":392,"correct":22},"订立合同时合同签订地",{"key":24,"text":394,"correct":32},"订立合同时合同履行地",{"key":27,"text":396,"correct":22},"履行合同时合同签订地",{"key":30,"text":398,"correct":22},"履行合同时合同履行地",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":27,"analysis":33},1132658,"某投标人中标后，招标人要求其压低报价10%，否则不签合同。于是双方先按照中标人的投标报价签订了甲合同并备案。接着，双方又根据施工单位同意压价后的价格签订了乙合同。后来，双方因工程款结算产生纠纷。关于工程款结算的合同依据，下列说法中，正确的是（ ）。",[403,405,407,409],{"key":20,"text":404,"correct":22},"甲合同不是双方实际履行的合同，应当作为无效合同处理",{"key":24,"text":406,"correct":22},"乙合同是双方真实意思的表示，应当以乙合同作为结算依据",{"key":27,"text":408,"correct":32},"乙合同背离了中标合同的实质性内容，应当以甲合同作为结算依据",{"key":30,"text":410,"correct":22},"两份合同均不能作为结算依据，双方应当申请工程造价鉴定",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":30,"analysis":33},1132659,"施工单位与建设单位签订施工合同，约定施工单位垫资20%，但没有约定垫资利息。后施工单位向人民法院提起诉讼，请求建设单位支付垫资利息。对施工单位的请求，人民法院正确的做法是（ ）。",[415,417,419,421],{"key":20,"text":416,"correct":22},"尽管未约定利息，施工单位要求按中国人民银行发布的同期同类贷款利率支付垫资利息，应予支持",{"key":24,"text":418,"correct":22},"由于垫资行为违法，施工单位要求返还垫资，不予支持",{"key":27,"text":420,"correct":22},"尽管未约定利息，施工单位要求按低于中国人民银行发布的同期同类贷款利率支付垫资利息，应予支持",{"key":30,"text":422,"correct":32},"由于未约定利息，施工单位要求支付垫资利息，不予支持",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":27,"analysis":33},1132660,"某市一建经过招投标中标后与开发商签订了一份施工总承包合同并备案，后建设单位又要求施工单位出具了降价10％的让利承诺。该承诺未再办理备案手续。对于此补充协议，下列说法正确的是（ ）。",[427,429,431,433],{"key":20,"text":428,"correct":22},"该补充协议对工程价款的改变不属于合同实质性内容的变更",{"key":24,"text":430,"correct":22},"该协议变更是双方真实意思表示，属于合同约定变更，不需要再次备案",{"key":27,"text":432,"correct":32},"由于该协议未办理备案，工程结算时只能以原备案合同作为结算依据",{"key":30,"text":434,"correct":22},"该补充协议应当作为工程款结算的依据",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":24,"analysis":33},1132661,"某建设工程项目中标人与招标人签订合同并备案的同时，双方针对结算条款签订了与备案合同完全不同的补充协议。后双方因计价问题发生纠纷，遂诉至法院。法院此时应该（ ）作为结算工程款的依据。",[439,441,443,445],{"key":20,"text":440,"correct":22},"双方达成的补充协议",{"key":24,"text":442,"correct":32},"双方签订的备案合同",{"key":27,"text":444,"correct":22},"类似项目的结算价格",{"key":30,"text":446,"correct":22},"市场的平均价格",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":27,"analysis":33},1132662,"甲建设单位和乙施工企业在施工合同中约定：“甲方于工程交付使用后15日内结清所欠乙方所有工程款”。乙施工企业于2010年1月8日提交了工程竣工验收报告，2010年1月12日工程验收合格并于三天后交付甲方使用，但甲建设单位直到2010年2月10日仍未支付工程欠款。乙施工企业当天即到工程所在地法院起诉，要求甲建设单位支付乙施工企业工程欠款并支付相应利息，则该工程欠款的利息应当从（ ）计付。",[451,453,455,457],{"key":20,"text":452,"correct":22},"2010年1月8日",{"key":24,"text":454,"correct":22},"2010年1月15日",{"key":27,"text":456,"correct":32},"2010年1月30日",{"key":30,"text":458,"correct":22},"2010年2月10日",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":27,"analysis":33},1132663,"施工中发包人如需提前竣工，以下做法正确的是（ ）。",[463,465,467,469],{"key":20,"text":464,"correct":22},"发包人只需要提前书面通知承包人提前竣工的时间",{"key":24,"text":466,"correct":22},"发包人需要通知通知承包人提前竣工的时间及追加的价款",{"key":27,"text":468,"correct":32},"发包人需要与承包人协商一致，签订提前竣工协议",{"key":30,"text":470,"correct":22},"发包人与承包人需要针对此工程另订协议",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":27,"analysis":33},1132664,"某工程施工合同约定承包人对基础工程垫资，时间为3个月，发包人对垫付资金按照银行定期3个月存款利率的2倍支付利息，后发包人未按照合同约定支付利息，承包人将其诉至法院。银行3个月定期存款利息为2.4%，同期贷款利率为6%，则法院对垫资利息的处理正确的是（ ）。",[475,476,478,480],{"key":20,"text":141,"correct":22},{"key":24,"text":477,"correct":22},"按照2.4%支付利息",{"key":27,"text":479,"correct":32},"按照4.8%支付利息",{"key":30,"text":481,"correct":22},"按照6%支付利息",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":27,"analysis":33},1132665,"某施工合同中约定垫资但未约定垫资利息，施工企业请求法院判决建设单位返还垫资及利息时，根据相关法律规定可以预见的判决结果是（ ）。",[486,488,490,492],{"key":20,"text":487,"correct":22},"返还垫资并按银行同期贷款利率支付利息",{"key":24,"text":489,"correct":22},"认定垫资违法，利息予以没收",{"key":27,"text":491,"correct":32},"返还垫资但不支付利息",{"key":30,"text":493,"correct":22},"返还垫资并双倍支付利息",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":24,"analysis":33},1132666,"某房地产开发项目，工程经竣工验收合格并交付使用，后承包人依约向发包人递交了工程竣工结算文件，由于双方分歧较大而成诉，双方对工程结算款项支付时间没有具体约定，则发包人支付工程欠款的利息应从（ ）起算。",[498,500,502,504],{"key":20,"text":499,"correct":22},"工程竣工验收合格之日",{"key":24,"text":501,"correct":32},"工程移交之日",{"key":27,"text":503,"correct":22},"竣工结算文件提交之日",{"key":30,"text":505,"correct":22},"起诉之日",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":30,"analysis":33},1132667,"某建设工程施工合同无效，但该工程竣工验收合格，以下说法正确的是（ ）。",[510,512,514,516],{"key":20,"text":511,"correct":22},"合同无效是从订立时起承包人的权益就不受法律保护，所以承包人无法获取工程价款",{"key":24,"text":513,"correct":22},"因为合同无效，承包人应提出要求对方赔偿损失",{"key":27,"text":515,"correct":22},"因合同无效，承包人可以请求参照市场价格支付工程价款",{"key":30,"text":517,"correct":32},"虽然合同无效，但承包人可以请求参照合同约定支付工程价款",{"id":519,"libraryId":5,"type":48,"typeLabel":49,"stem":520,"options":521,"answer":532,"analysis":33},1132668,"根据合同法相关规定，承包人行使优先受偿权的期限应当自建设工程（ ）起计算。",[522,524,526,528,530],{"key":20,"text":523,"correct":22},"合同订立之日",{"key":24,"text":525,"correct":32},"实际竣工之日",{"key":27,"text":527,"correct":22},"开工之日",{"key":30,"text":529,"correct":22},"保修期届满之日",{"key":61,"text":531,"correct":32},"合同约定竣工之日","BE",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":30,"analysis":33},1132669,"按照《建设工程施工合同（示范文本）》的规定，在合同履行过程中，承包人申请延期开工，发包人应在收到申请后（ ）予以答复，否则视为同意延期。",[537,539,541,543],{"key":20,"text":538,"correct":22},"7日内",{"key":24,"text":540,"correct":22},"2天内",{"key":27,"text":542,"correct":22},"72小时内",{"key":30,"text":544,"correct":32},"48小时内",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":27,"analysis":33},1132670,"《最高人民法院关于审理建设工程施工合同纠纷案件适用法律问题的解释》规定，因设计变更导致建设工程的质量或者质量标准发生变化，当事人对该部分工程价款不能协商一致的，可以（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"参照争议发生时当地建设行政主管部门发布的计价方法或者计价标准结算",{"key":24,"text":552,"correct":22},"参照争议发生时当地物价主管部门发布的计价方法或者计价标准结算",{"key":27,"text":554,"correct":32},"参照签订建设工程施工合同时当地建设行政主管部门发布的计价方法或者计价标准结算",{"key":30,"text":556,"correct":22},"参照签订建设工程施工合同时当地物价主管部门发布的计价方法或者计价标准结算",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":27,"analysis":33},1132671,"建设单位要求施工单位垫资进行建设，双方在合同中约定了垫资条款，建设单位同意按照中国人民银行发布的同期同类贷款利率支付垫资利息。工程竣工后，施工单位要求返还垫资并要求按照合同约定支付垫资利息。根据有关司法解释，下列说法正确的是（ ）。",[561,563,565,567],{"key":20,"text":562,"correct":22},"法院对垫资应当按照工程欠款处理",{"key":24,"text":564,"correct":22},"由于垫资违反法律的强制性规定，该合同无效",{"key":27,"text":566,"correct":32},"法院对返还垫资和支付垫资利息的请求均应予以支持",{"key":30,"text":568,"correct":22},"法院对返还垫资请求应予支持，但对支付垫资利息的请求不应支持",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":20,"analysis":33},1132672,"下列选项中，有关工程竣工日期的错误表述是（ ）。",[573,575,577,579],{"key":20,"text":574,"correct":32},"建设工程竣工前，当事人对工程质量发生争议，工程质量经鉴定合格的，鉴定日期为竣工日期",{"key":24,"text":576,"correct":22},"承包人已经提交竣工验收报告，发包人拖延验收的，以承包人提交验收报告之日为竣工日期",{"key":27,"text":578,"correct":22},"建设工程竣工验收合格的，以竣工验收合格之日为竣工日期",{"key":30,"text":580,"correct":22},"建设工程未经竣工验收，发包人擅自使用的，以转移占有建设工程之日为竣工日期",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":20,"analysis":33},1132673,"某施工企业于2012年3月5日向发包人提交了竣工验收报告，比合同约定工期提前一周，但发包人以质量存在严重缺陷为由拒绝组织验收。双方经协商，于2012年3月20日提请有关部门进行质量鉴定，鉴定部门于2012年4月10日出具了工程质量合格的鉴定结论。则该工程的实际竣工日期应为（ ）。",[585,587,589,591],{"key":20,"text":586,"correct":32},"2012年3月5日",{"key":24,"text":588,"correct":22},"2012年3月12目",{"key":27,"text":590,"correct":22},"2012年3月20日",{"key":30,"text":592,"correct":22},"2012年4月10日",{"id":594,"libraryId":5,"type":48,"typeLabel":49,"stem":595,"options":596,"answer":607,"analysis":33},1132674,"合同内容约定不明确，不能达成补充协议，按照交易习惯不能解决时，根据我国《合同法》的规定，正确的说法有（ ）。",[597,599,601,603,605],{"key":20,"text":598,"correct":32},"质量要求不明确，可按照国家标准、行业标准履行",{"key":24,"text":600,"correct":32},"履行期限不明确，债务人可以随时履行，但应当给对方必要的准备时间",{"key":27,"text":602,"correct":32},"价款不明确的，可按照合同签订时履行地的市场价格履行",{"key":30,"text":604,"correct":22},"履行地点不明确，给付货币的，在给付货币一方所在地履行",{"key":61,"text":606,"correct":22},"履行费用负担不明确的，由债权人承担","ABC",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":24,"analysis":33},1132675,"某工程项目总承包单位按照合同约定将钢结构部分分包给甲公司，甲公司将钢结构的喷涂部分以较低的价格交由一家专业公司乙施工。竣工后发现钢结构喷涂部分存在质量问题，经乙修复后合格，乙请求甲支付工程款未果而诉至法院。针对上例下列说法错误的是（ ）。",[612,614,616,618],{"key":20,"text":613,"correct":22},"甲乙之间的合同是违法分包合同",{"key":24,"text":615,"correct":32},"乙承担修复费用后参照甲乙合同约定支付工程款",{"key":27,"text":617,"correct":22},"甲承担修复费用后参照甲乙合同约定支付工程款",{"key":30,"text":619,"correct":22},"人民法院可以收缴甲的违法所得",{"id":621,"libraryId":5,"type":15,"typeLabel":16,"stem":622,"options":623,"answer":27,"analysis":33},1132676,"承包人已经提交竣工验收报告，发包人拖延验收的，竣工日期（ ）。2014",[624,626,628,630],{"key":20,"text":625,"correct":22},"以合同约定的竣工日期为准",{"key":24,"text":627,"correct":22},"相应顺延",{"key":27,"text":629,"correct":32},"以承包人提交竣工报告之日为准",{"key":30,"text":631,"correct":22},"以实际通过的竣工验收之日为准",{"id":633,"libraryId":5,"type":15,"typeLabel":16,"stem":634,"options":635,"answer":24,"analysis":33},1132677,"某建筑公司与某开发公司签订了一份建设工程施工合同，合同的约定由建筑公司预先垫付20%的工程款，但没有约定利息的计算方法。后两公司就工程款支付发生争议，建筑公司诉至人民法院，要求开发公司支付工程款并偿还垫付工程款的利息，人民法院应（ ）。( 2015真题 )",[636,638,639,641],{"key":20,"text":637,"correct":22},"对该诉讼请求全部予以支持",{"key":24,"text":167,"correct":32},{"key":27,"text":640,"correct":22},"对该诉讼请求全部不予支持",{"key":30,"text":169,"correct":22},{"id":643,"libraryId":5,"type":15,"typeLabel":16,"stem":644,"options":645,"answer":30,"analysis":33},1132678,"某商品房开发工程因故停建，承包人及时起诉要求结算工程款并胜诉。法院在对该项目进行拍卖执行中，有许多债权人主张权利。各债权人的清偿顺序依法应为（ ）。2014",[646,648,650,652],{"key":20,"text":647,"correct":22},"承包人、抵押权人、普通债权人、全款购房人",{"key":24,"text":649,"correct":22},"抵押权人、普通债权人、全款购房人、承包人",{"key":27,"text":651,"correct":22},"普通债权人、全款购房人、承包人、抵押权人",{"key":30,"text":653,"correct":32},"全款购房人、承包人、抵押权人、普通债权人",[655,658,661,664,667,670],{"id":15,"name":656,"category":7,"favorite":657},"领导干部任职前廉政法规知识测试题",92,{"id":659,"name":660,"category":7,"favorite":15},595,"建筑结构与设备",{"id":662,"name":663,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":665,"name":666,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":668,"name":669,"category":7,"favorite":8},534,"BIM工程师",{"id":671,"name":669,"category":7,"favorite":8},535]