[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-795-30":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":634},{"id":5,"name":6,"category":7,"favorite":8},795,"一建工程法规及相关知识","建筑工程",0,30,50,2683,[13,34,46,58,70,82,94,112,127,142,154,166,178,190,202,214,227,242,255,267,279,291,303,314,328,340,351,363,376,388,400,412,424,436,448,460,474,486,498,509,521,533,545,554,566,578,590,599,611,623],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1132477,1,"单选题","甲承包人施工过程中，由于自身管理原因，未经监理工程师同意改变了已被批准的施工组织设计，导致同时在现场施工的乙承包人受到损失。按照《合同法》的违约责任原则，乙承包人的损失应（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","视为发包人的主观过错，要求发包人赔偿",false,{"key":24,"text":25,"correct":22},"B","视为发包人的合同责任，要求发包人赔偿",{"key":27,"text":28,"correct":22},"C","视为监理工程师协调不力，要求监理人赔偿",{"key":30,"text":31,"correct":32},"D","直接要求甲承包人赔偿",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1132478,"甲施工企业与乙供应商于2008年4月1日签订了水泥供应合同，约定2008年5月1日前交货。乙供应商随即与丙水泥厂签订了一份水泥买卖合同，要求丙水泥厂于2008年4 月20日前交货。后来由于原材料紧张，丙水泥厂于2008年5月8日才将水泥交付给乙供应商。乙供应商收到货物后立即办理托运手续发货。2008年5月11日，货物在运输途中因不可抗力灭失。关于本案的违约责任，下列表述中正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"由于发生不可抗力，乙供应商对甲施工企业不承担违约责任",{"key":24,"text":41,"correct":32},"甲施工企业只能要求乙供应商承担违约责任",{"key":27,"text":43,"correct":22},"甲施工企业可以要求乙供应商和丙水泥厂连带承担违约责任",{"key":30,"text":45,"correct":22},"由于是丙水泥厂迟延交货造成的，乙供应商对甲施工企业不承担违约责任",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1132479,"下列有关承担违约责任的说法，正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"违反合同的当事人在承担了赔偿金后，就免除了履约责任",{"key":24,"text":53,"correct":32},"当事人既约定了违约金又约定定金的，一方违约，对方可以选择适用违约金条款或定金条款，但两种违约责任不能合并使用",{"key":27,"text":55,"correct":22},"当事人一方履行合同不符合约定，在采取补救措施后，对方还有其他损失的，此时就不应再承担赔偿责任",{"key":30,"text":57,"correct":22},"合同约定违约金的，因当事人一方违约使对方产生损失，此时不论损失多大，均只应向损失方支付合同约定的违约金",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},1132480,"甲开发商与乙签订了商品房买卖合同，由乙购买甲开发的楼盘中的一栋别墅。交付前，甲又将此套别墅出售给丙，并办理了产权登记。在乙要求甲承担责任的方式中，不应采用的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"要求甲支付违约金",{"key":24,"text":65,"correct":22},"要求甲双倍返还定金",{"key":27,"text":67,"correct":22},"要求甲在楼盘中另提供一套价格相等的别墅",{"key":30,"text":69,"correct":32},"要求甲交付合同约定的别墅房屋",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1132481,"建设单位在施工合同履行中未能按约定付款，由此可能承担的法律责任是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"警告",{"key":24,"text":77,"correct":32},"支付违约金",{"key":27,"text":79,"correct":22},"罚款",{"key":30,"text":81,"correct":22},"赔礼道歉",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1132482,"甲建设单位与乙设计院签订设计合同，设计费用为300万元，双方在协商定金数额时发生意见分歧。根据《担保法》的规定，该定金数额最多为（ ）万元。",[86,88,90,92],{"key":20,"text":87,"correct":22},"30",{"key":24,"text":89,"correct":22},"45",{"key":27,"text":91,"correct":32},"60",{"key":30,"text":93,"correct":22},"90",{"id":95,"libraryId":5,"type":96,"typeLabel":97,"stem":98,"options":99,"answer":111,"analysis":33},1132483,2,"多选题","甲施工单位将脚手架安装作业分包给乙单位，后因脚手架质量问题导致甲方丙跌落受伤，则下列关于本案中责任承担的说法中，正确的是（ ）。",[100,102,104,106,108],{"key":20,"text":101,"correct":32},"甲可要求乙承担违约责任",{"key":24,"text":103,"correct":22},"甲可要求乙承担侵权责任",{"key":27,"text":105,"correct":22},"丙可要求乙承担违约责任",{"key":30,"text":107,"correct":22},"丙可要求脚手架生产厂家承担违约责任",{"key":109,"text":110,"correct":32},"E","丙可要求甲承担赔偿责任","AE",{"id":113,"libraryId":5,"type":96,"typeLabel":97,"stem":114,"options":115,"answer":126,"analysis":33},1132484,"继续实际履行合同作为承担违约责任的方式之一，其构成要件包括（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":32},"必须有违约行为存在",{"key":24,"text":119,"correct":32},"必须由守约方在合理期限内提出继续履行合同要求",{"key":27,"text":121,"correct":32},"继续实际履行须在事实上可能",{"key":30,"text":123,"correct":22},"继续实际履行仅限于价款和报酬的给付",{"key":109,"text":125,"correct":32},"必须依据法律和合同的性质能够履行","ABCE",{"id":128,"libraryId":5,"type":96,"typeLabel":97,"stem":129,"options":130,"answer":141,"analysis":33},1132485,"某施工机械厂因经营需要分立为挖掘机制造厂及推土机制造厂两个法人企业。分立前由于三台挖掘机未能及时供货，买方欲追究违约责任，则下列关于本案中违约责任承担的说法中，正确的有（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":32},"买方可要求挖掘机生产厂承担违约责任",{"key":24,"text":134,"correct":32},"买方可要求推土机生产厂承担违约责任",{"key":27,"text":136,"correct":32},"买方可要求推土机与挖掘机生产厂共同承担违约责任",{"key":30,"text":138,"correct":22},"如果推土机与挖掘机生产厂对于该债务有约定，应按该约定处理",{"key":109,"text":140,"correct":22},"如果推土机与挖掘机生产厂对于该债务没有约定，则各自承担一半","ABC",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1132486,"某工程施工过程中发现设计图纸有较严重的错误，设计单位花了较长时间修改设计。在此期间，施工单位机械闲置和人员窝工损失3万元。另外，图纸延误造成施工单位竣工工期延误20天，合同规定的误期损害赔偿金为2500元／天。对此，（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"施工单位应向建设单位承担误期损害赔偿金5万元",{"key":24,"text":149,"correct":32},"建设单位应向施工单位承担机械闲置和人员窝工损失3万元",{"key":27,"text":151,"correct":22},"设计单位向施工单位承担机械闲置和人员窝工损失3万元",{"key":30,"text":153,"correct":22},"设计单位应向施工单位承担机械闲置和人员窝工损失3万元以及误期损害赔偿金5万元",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":30,"analysis":33},1132487,"当事人一方不履行合同义务或者履行合同义务不符合约定，给对方造成损失的，损失赔偿额应当相当于因违约所造成的损失，包括合同履行后可以获得的利益，但不得超过（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"直接损失",{"key":24,"text":161,"correct":22},"实际损失",{"key":27,"text":163,"correct":22},"全部损失",{"key":30,"text":165,"correct":32},"违反合同一方订立合同时预见到或者应当预见到的因违反合同可能造成的损失",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1132488,"某施工单付与采石场签订了石料供应合同，在合同中约定了违约责任。为确保合同履行，施工单位交付了3万元定金。由于采石场未能按时交货，根据合同约定应支付违约金4万元。则本案中采石场最多应支付给施工单位（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"10万元",{"key":24,"text":173,"correct":32},"7万元",{"key":27,"text":175,"correct":22},"6万元",{"key":30,"text":177,"correct":22},"4万元",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},1132489,"在施工合同履行过程中，当事人一方可以免除违约责任的情形是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"因为建设单位拖延提供图纸，导致建筑公司未能按合同约定时间开工",{"key":24,"text":185,"correct":22},"因为建筑公司自有设备损坏，导致工期拖延",{"key":27,"text":187,"correct":32},"因为发生洪灾，建筑公司无法在合同约定的工期内竣工",{"key":30,"text":189,"correct":22},"因为三通一平工期拖延，建设单位不能在合同约定的时间内提供施工场地",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1132490,"水泥厂为承包商供应水泥，承包商已经支付了全部货款。交货时承包商因水泥厂交货时间经合同约定晚了两天而要求支付违约金，水泥厂表示拒绝并把水泥卸放在合同约定的地点。第二天上午乌云密布，下午降暴雨把部分水泥淋湿硬化。则该部分损失（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"由水泥厂承担",{"key":24,"text":197,"correct":32},"由承包商承担",{"key":27,"text":199,"correct":22},"由水泥厂和承包商共同承担",{"key":30,"text":201,"correct":22},"由承包商向水泥厂索赔",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},1132491,"合同当事人违反合同约定后，非违约方有权要求其依照合同约定继续履行合同，可以继续履行的情形是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":32},"合同约定的标的物仍有继续履行的可能",{"key":24,"text":209,"correct":22},"事实上不能履行的非金钱债务",{"key":27,"text":211,"correct":22},"履行费用过高的债务",{"key":30,"text":213,"correct":22},"债权人在合理期限内未要求履行的",{"id":215,"libraryId":5,"type":96,"typeLabel":97,"stem":216,"options":217,"answer":226,"analysis":33},1132492,"下列责任现实中，当事人承担违约责任的形式有（ ）。",[218,219,220,222,224],{"key":20,"text":81,"correct":22},{"key":24,"text":77,"correct":32},{"key":27,"text":221,"correct":32},"赔偿损失",{"key":30,"text":223,"correct":32},"采取补救措施",{"key":109,"text":225,"correct":22},"罚金","BCD",{"id":228,"libraryId":5,"type":96,"typeLabel":97,"stem":229,"options":230,"answer":241,"analysis":33},1132493,"《合同法》规定，当事人可以依照《担保法》约定一方向对方给付定金作为债权的担保，债务人履行债务后，定金应当抵作价款或者回收。在当事人一方发生违约时，适用下列罚则（ ）。",[231,233,235,237,239],{"key":20,"text":232,"correct":32},"给付定金的一方不履行约定的债务的，无权要求返还定金",{"key":24,"text":234,"correct":22},"由国家没收定金",{"key":27,"text":236,"correct":32},"收受定金的一方不履行约定的债务的，应当双倍返还定金",{"key":30,"text":238,"correct":22},"收付定金的一方不履行约定的债务的，有权要求返还全部定金",{"key":109,"text":240,"correct":22},"收受定金的一方不履行约定的债务的，应当退还全部定金","AC",{"id":243,"libraryId":5,"type":96,"typeLabel":97,"stem":244,"options":245,"answer":254,"analysis":33},1132494,"下列承担民事责任的方式中，只能适用于违约责任的有（ ）。",[246,248,250,251,253],{"key":20,"text":247,"correct":22},"停止侵害",{"key":24,"text":249,"correct":32},"修理、重作",{"key":27,"text":77,"correct":32},{"key":30,"text":252,"correct":22},"恢复名誉",{"key":109,"text":221,"correct":22},"BC",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":30,"analysis":33},1132495,"甲乙双方的施工合同约定工程应于2010年5月10日竣工，但是乙方因为管理不善导致工程拖期，在5月20日至5月25日该地区发生洪灾，造成工期一再拖延，最后竣工时间为2010年5月31日。甲方在支付乙方工程费用时，按照合同约定扣除因乙方工程拖期的违约费用，那么甲方应该计算（ ）天的拖期违约损失。",[259,261,263,265],{"key":20,"text":260,"correct":22},"15",{"key":24,"text":262,"correct":22},"16",{"key":27,"text":264,"correct":22},"17",{"key":30,"text":266,"correct":32},"21",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":27,"analysis":33},1132496,"当事人双方既约定违约金，又约定定金的合同，一方当事人违约时，对违约行为的赔偿处理原则是（ ）。",[271,273,275,277],{"key":20,"text":272,"correct":22},"只能采用违约金",{"key":24,"text":274,"correct":22},"由违约一方选择采用违约金或定金",{"key":27,"text":276,"correct":32},"由非违约方选择采用违约金或定金",{"key":30,"text":278,"correct":22},"同时采用违约金和定金",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":27,"analysis":33},1132497,"供应商在供应水泥运输途中发生泥石流造成交通中断，迟延运输10日，给施工方造成损失。下列说法中错误的是（ ）。",[283,285,287,289],{"key":20,"text":284,"correct":22},"供应商应及时通知施工方",{"key":24,"text":286,"correct":22},"施工方接到通知后有义务防止损失扩大",{"key":27,"text":288,"correct":32},"施工方因止损产生的费用由双方合理分担",{"key":30,"text":290,"correct":22},"施工方接到通知后没有采取止损措施，扩大的损失自行负担",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":30,"analysis":33},1132498,"违约责任中的继续实际履行，是指违约当事人不论是否已经承担赔偿损失或者违约金的责任，都必须（ ）条件下，对原合同未履行部分继续按照要求履行。",[295,297,299,301],{"key":20,"text":296,"correct":22},"在对方要求",{"key":24,"text":298,"correct":22},"能够履行",{"key":27,"text":300,"correct":22},"能够清偿时",{"key":30,"text":302,"correct":32},"根据对方的要求，并在自己能够履行的",{"id":304,"libraryId":5,"type":96,"typeLabel":97,"stem":305,"options":306,"answer":141,"analysis":33},1132499,"当事人一方不履行合同义务或者履行合同义务不符合约定的。在合同对违约责任没有具体约定的情况下，违约方应当承担的法定违约责任有（ ）。",[307,309,310,311,312],{"key":20,"text":308,"correct":32},"继续履行",{"key":24,"text":223,"correct":32},{"key":27,"text":221,"correct":32},{"key":30,"text":77,"correct":22},{"key":109,"text":313,"correct":22},"定金",{"id":315,"libraryId":5,"type":96,"typeLabel":97,"stem":316,"options":317,"answer":111,"analysis":33},1132500,"工程施工合同履行过程中，建设单位迟延支付工程款，则施工单位要求建设单位承担违约责任的方式可以是（ ）。",[318,320,322,324,326],{"key":20,"text":319,"correct":32},"继续履行合同",{"key":24,"text":321,"correct":22},"降低工程质量标准",{"key":27,"text":323,"correct":22},"提高合同价款",{"key":30,"text":325,"correct":22},"提前支付所有工程款",{"key":109,"text":327,"correct":32},"支付逾期利息",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":30,"analysis":33},1132501,"项目经理部没有按照合同约定完成施工任务，则应由（ ）承担违约责任。",[332,334,336,338],{"key":20,"text":333,"correct":22},"项目经理",{"key":24,"text":335,"correct":22},"建设单位",{"key":27,"text":337,"correct":22},"项目主要负责人",{"key":30,"text":339,"correct":32},"施工单位",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":27,"analysis":33},1132502,"某施工项目材料采购合同中，双方约定的违约金为4万元、定金为6万元。采购方依约支付了6万元定金，供货方违约后，采购方有权主张的最高给付金额为（ ）万元。",[344,345,347,349],{"key":20,"text":262,"correct":22},{"key":24,"text":346,"correct":22},"10",{"key":27,"text":348,"correct":32},"12",{"key":30,"text":350,"correct":22},"4",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":24,"analysis":33},1132503,"《合同法》规定，违约责任除另有规定外，实行（ ）原则。",[355,357,359,361],{"key":20,"text":356,"correct":22},"过错责任",{"key":24,"text":358,"correct":32},"严格责任",{"key":27,"text":360,"correct":22},"损害赔偿",{"key":30,"text":362,"correct":22},"公平合理",{"id":364,"libraryId":5,"type":96,"typeLabel":97,"stem":365,"options":366,"answer":375,"analysis":33},1132504,"在工程建领域承担民事责任的方式中，只能适用于违约责任，不适用于侵权责任的是（ ）。",[367,369,370,372,374],{"key":20,"text":368,"correct":22},"返还财产",{"key":24,"text":81,"correct":22},{"key":27,"text":371,"correct":32},"修理、重作、更换",{"key":30,"text":373,"correct":22},"消除危险",{"key":109,"text":77,"correct":32},"CE",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":20,"analysis":33},1132505,"甲供货单位与乙采购单位于2005年3月1日订立水泥供应合同。约定水泥价格为每吨370元，2006年5月1日交货，逾期交货1个月的违约金为每吨10元。甲实际交货为2006年6月1日 。2006年5月1日水泥市场价格为每吨380元，2006年6月11日水泥市场价格为每吨390元，则乙最终应付总款为每吨（ ）元。",[380,382,384,386],{"key":20,"text":381,"correct":32},"360",{"key":24,"text":383,"correct":22},"370",{"key":27,"text":385,"correct":22},"380",{"key":30,"text":387,"correct":22},"390",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":24,"analysis":33},1132506,"甲与乙签订房屋买卖合同，将自有的一幢房屋卖给乙，并约定任何一方违约须向对方支付购房款25%的违约金。但在交房前，甲又与丙签订合同，将该房屋卖给丙，并与丙办理了过户登记手续。则下列说法中错误的是（ ）。",[392,394,396,398],{"key":20,"text":393,"correct":22},"若乙要求甲支付约定的违约金，甲可以请求法院或仲裁机构予以适当减少",{"key":24,"text":395,"correct":32},"甲必须收回房屋并向乙方支付",{"key":27,"text":397,"correct":22},"丙取得该房屋的所有权",{"key":30,"text":399,"correct":22},"乙不能要求甲实际支付该房屋，但可以要求甲承担违约责任",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":20,"analysis":33},1132507,"甲、乙双方订立的商品房买卖合同中约定：“乙将自己开发建设的某公寓A座10层住房出售给甲，2013年10月8日交付房屋。”2013年9月27日，甲发现该公寓A座仅盖到第2层。根据我国《合同法》规定，以下表述正确的是（ ）。",[404,406,408,410],{"key":20,"text":405,"correct":32},"甲可以立即起诉乙，要求其承担违约责任",{"key":24,"text":407,"correct":22},"甲只能要求乙支付迟延履行违约金而不能解除合同",{"key":27,"text":409,"correct":22},"甲只能等到2013年11月8日方能要求乙承担违约责任",{"key":30,"text":411,"correct":22},"甲只能在乙交房后接受交付，而不能要求乙承担违约责任",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":24,"analysis":33},1132508,"甲建筑企业与乙混凝土厂签订混凝土供应合同，总计金额约600万。甲先行支付定金150万，剩余款项根据供应进度结算；同时约定，若乙方迟延供货，违约金为按日支付5万元。后由于乙混凝土厂设备检修，迟延供货达30日。则甲建筑企业应如何要求乙承担违约责任最为妥当（ ）。",[416,418,420,422],{"key":20,"text":417,"correct":22},"要求乙双倍返还定金300万元",{"key":24,"text":419,"correct":32},"要求乙支付违约金150万元，返还定金120万元，并返还超出定金的30万元",{"key":27,"text":421,"correct":22},"要求乙双倍返还定金240万",{"key":30,"text":423,"correct":22},"要求乙支付违约金150万元，并返还定金120万元",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":24,"analysis":33},1132509,"甲公司与乙公司同时签订了两个合同，第一个合同是材料采购合同，合同中约定由甲公司先向乙公司提供材料，乙公司接受材料后向甲公司支付工程款。第二个合同是劳务合同，合同中约定由乙为甲提供劳务，甲公司根据完成的工程量向乙公司支付劳务费。如果乙公司没有按照合同的约定支付材料款，则（ ）。",[428,430,432,434],{"key":20,"text":429,"correct":22},"甲公司就可以不向乙公司支付劳务费",{"key":24,"text":431,"correct":32},"甲公司可以追究乙公司的违约责任，但是应当继续向乙公司支付劳务款",{"key":27,"text":433,"correct":22},"甲公司不向乙公司支付劳务费是在行使不安抗辩权",{"key":30,"text":435,"correct":22},"甲公司不向乙公司支付劳务费是在行使后履行抗辩权",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":27,"analysis":33},1132510,"依据《合同法》的违约责任承担原则，发包人可以不赔偿承包人损失的情况是（ ）。",[440,442,444,446],{"key":20,"text":441,"correct":22},"建设资金未能按计划到位的施工暂停",{"key":24,"text":443,"correct":22},"发包人改变项目建设方案的工程停建",{"key":27,"text":445,"correct":32},"传染病流行导致施工暂停",{"key":30,"text":447,"correct":22},"征地拆迁工作不顺利导致施工现场移交延误",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":27,"analysis":33},1132511,"某施工单位与建设单位签订了一个施工承包合同，合同中约定2011年12月5日竣工。2011年10月5日，该地区发生了地震，使得在建的工程坍塌，施工单位没能按时交付工程，则施工单位没能按时交付工程属于（ ）。",[452,454,456,458],{"key":20,"text":453,"correct":22},"没有违约，因为地震坍塌属于外界因素，与施工单位无关",{"key":24,"text":455,"correct":22},"构成违约，因为客观上存在违约的事实",{"key":27,"text":457,"correct":32},"没有违约，因为是不可抗力所导致，施工单位可以申请免除责任",{"key":30,"text":459,"correct":22},"构成违约，因为从主观上说施工单位并没有保证好质量，使其坍塌严重",{"id":461,"libraryId":5,"type":96,"typeLabel":97,"stem":462,"options":463,"answer":141,"analysis":33},1132512,"关于违约金条款的适用，下列说法正确的有（ ）。",[464,466,468,470,472],{"key":20,"text":465,"correct":32},"约定的违约金低于造成的损失的，当事人可以请求人民法院或者仲裁机构予以增加",{"key":24,"text":467,"correct":32},"违约方支付迟延履行违约金后，另一方仍有权要求其继续履行",{"key":27,"text":469,"correct":32},"当事人既约定违约金，又约定定金的，一方违约时，对方可以选择适用违约金条款或定金条款",{"key":30,"text":471,"correct":22},"当事人既约定违约金，又约定定金的，一方违约时，对方可以同时适用违约金条款与定金条款",{"key":109,"text":473,"correct":22},"约定的违约金高于造成的损失的，当事人可以请求人民法院或者仲裁机构按实际损失金额调减",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":27,"analysis":33},1132513,"甲与乙订立了一份施工项目的材料采购合同，货款为40万元，乙向甲支付定金4万元，如任何一方不履行合同应支付违约金6万元。甲因将施工材料另卖他人而无法向乙完成交付，在乙提出的如下诉讼请求中，既能最大限度保护自己的利益，又能获得法院支持的诉讼请求是（ ）。( 2015真题 )",[478,480,482,484],{"key":20,"text":479,"correct":22},"请求甲支付违约金6万元",{"key":24,"text":481,"correct":22},"请求甲双倍返还定金8万元",{"key":27,"text":483,"correct":32},"请求甲支付违约金6万元，同时请求返还支付的定金4万元",{"key":30,"text":485,"correct":22},"请求甲双倍返还定金8万元，同时请求甲支付违约金6万元",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":30,"analysis":33},1132514,"甲施工企业与乙公司订立钢材加工合同，后因供电局无故断电，乙公司无法按时完成生产任务致使交货延迟，给甲施工企业造成了损失。关于该案责任承担的说法，正确的是（ ）。 2016",[490,492,494,496],{"key":20,"text":491,"correct":22},"供电局向甲施工企业承担责任",{"key":24,"text":493,"correct":22},"供电局与乙公司向甲施工企业承担连带责任",{"key":27,"text":495,"correct":22},"乙公司可以要求供电局向甲施工企业承担责任",{"key":30,"text":497,"correct":32},"乙公司向甲施工企业承担责任",{"id":499,"libraryId":5,"type":96,"typeLabel":97,"stem":500,"options":501,"answer":508,"analysis":33},1132515,"（2019年真题）建设工程施工合同中，违约责任的主要承担方式有（）",[502,503,505,506,507],{"key":20,"text":368,"correct":22},{"key":24,"text":504,"correct":22},"修理",{"key":27,"text":221,"correct":32},{"key":30,"text":308,"correct":32},{"key":109,"text":373,"correct":22},"CD",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":20,"analysis":33},1132516,"甲将闲置不用的工程设备出售给乙，双方约定3天后交付设备，次日，甲又将该设备卖给丙，并向丙交付了该设备。经查，丙不知甲与乙之间有合同关系。关于甲、乙、丙之间的合同效力的说法，正确的是（ ）。",[513,515,517,519],{"key":20,"text":514,"correct":32},"甲与乙、丙之间的合同均有效",{"key":24,"text":516,"correct":22},"甲与乙之间的合同无效，甲与丙之间的合同有效",{"key":27,"text":518,"correct":22},"甲与乙、丙之间的合同均无效",{"key":30,"text":520,"correct":22},"甲与乙之间的合同先生效后失效，甲与丙之间的合同有效",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":27,"analysis":33},1132517,"某施工企业为了支付农民工工资，擅自将租赁的脚手架钢管卖给王某，则下列关于该转让合同效力的表述中，正确的是（ ）。",[525,527,529,531],{"key":20,"text":526,"correct":22},"合同有效",{"key":24,"text":528,"correct":22},"合同无效",{"key":27,"text":530,"correct":32},"出租方追认则合同生效",{"key":30,"text":532,"correct":22},"钢管实际交付后，合同生效",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":24,"analysis":33},1132518,"甲乙两公司为减少应纳税款，以低于实际成交的价格签订合同。根据《合同法》，该合同为（ ）合同。",[537,539,541,543],{"key":20,"text":538,"correct":22},"有效",{"key":24,"text":540,"correct":32},"无效",{"key":27,"text":542,"correct":22},"效力待定",{"key":30,"text":544,"correct":22},"可变更、可撤销",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":20,"analysis":33},1132519,"施工企业法定代表人甲超出公司章程的规定权限，与钢材经销商乙订立了价值800万元的钢材采购合同。钢材经销商乙由于不了解施工企业的内部规定，因而并不知甲超出公司章程的规定权限。则该买卖合同（ ）。",[549,550,551,553],{"key":20,"text":538,"correct":32},{"key":24,"text":540,"correct":22},{"key":27,"text":552,"correct":22},"可撤销",{"key":30,"text":542,"correct":22},{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":30,"analysis":33},1132520,"因欺诈、胁迫而订立的施工合同可能是无效合同，也可能是可撤销合同。认定其为无效合同的必要条件是（ ）。",[558,560,562,564],{"key":20,"text":559,"correct":22},"违背当事人的意志",{"key":24,"text":561,"correct":22},"乘人之危",{"key":27,"text":563,"correct":22},"显失公平",{"key":30,"text":565,"correct":32},"损害国家利益",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":30,"analysis":33},1132521,"下列建设工程施工合同情况中，不属于无效合同情形的是（ ）。",[570,572,574,576],{"key":20,"text":571,"correct":22},"承包人未取得建筑施工企业资质或者超越资质等级的",{"key":24,"text":573,"correct":22},"没有资质的实际施工人借用有资质的建筑施工企业名义的",{"key":27,"text":575,"correct":22},"建筑工程必须进行招标而未招标或者中标无效的",{"key":30,"text":577,"correct":32},"承揽全部劳务作业的劳务分包合同",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":20,"analysis":33},1132522,"某施工企业派采购员王某采购一批外墙面砖，王某与某建筑材料公司签订一份外墙面砖供应合同，因洽谈顺利，且该生产公司的卫生洁具质量上乘，价格优惠，遂以公司名义又签订了50套洁具供应合同，则该洁具供应合同属于（ ）。",[582,584,586,588],{"key":20,"text":583,"correct":32},"效力待定合同",{"key":24,"text":585,"correct":22},"无效合同",{"key":27,"text":587,"correct":22},"可变更合同",{"key":30,"text":589,"correct":22},"可撤销合同",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":24,"analysis":33},1132523,"谭某，15岁，为某中学钢琴小明星，欲为某开发商举办一场个人钢琴音乐会，其个人与该企业达成有偿演出协议，该协议（ ）。",[594,595,596,598],{"key":20,"text":538,"correct":22},{"key":24,"text":542,"correct":32},{"key":27,"text":597,"correct":22},"可变更可撤销",{"key":30,"text":540,"correct":22},{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":30,"analysis":33},1132524,"经建设单位的同意，甲建设工程公司与乙建筑施工公司签订了一份劳动分包合同，合同约定：乙公司负责为甲公司承包的某建设项目提供劳务工作，甲公司以每工人每日30元支付乙公司所提供的劳务，因施工事故所造成的人员伤亡的责任一概由乙公司承担等。根据我国《合同法》的规定，此分包合同（ ）。",[603,605,607,609],{"key":20,"text":604,"correct":22},"合法有效",{"key":24,"text":606,"correct":22},"因损害社会公共利益而无效",{"key":27,"text":608,"correct":22},"因显失公平而可撤销",{"key":30,"text":610,"correct":32},"因施工事故所造成的人员伤亡的责任一概由乙公司承担的条款无效",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":24,"analysis":33},1132525,"某市地税局计划在市区某地兴建一座办公大楼。在招标过程中，甲建筑工程公司通过伪造资质证明文件的手段中标，并与该地税局签订工程承包合同。之后不久，此事被当地市政府建设行政主管部门查处并强令停工。对于本案表述不正确的是（ ）。",[615,617,619,621],{"key":20,"text":616,"correct":22},"地税局与甲公司签订的承包合同无效",{"key":24,"text":618,"correct":32},"甲公司应承担违约责任",{"key":27,"text":620,"correct":22},"甲公司应承担缔约过失责任",{"key":30,"text":622,"correct":22},"甲公司的行为违反了我国《招标投标法》的规定",{"id":624,"libraryId":5,"type":15,"typeLabel":16,"stem":625,"options":626,"answer":20,"analysis":33},1132526,"甲水泥厂因无力支付建厂赊购钢材的货款，遂向乙钢材厂提供一批水泥用来抵账。后乙将该批水泥出售给丙施工单位，则关于该水泥买卖合同的效力，下列说法正确的是（ ）。",[627,628,630,632],{"key":20,"text":538,"correct":32},{"key":24,"text":629,"correct":22},"因乙超越经营范围而无效",{"key":27,"text":631,"correct":22},"因乙超越经营范围而效力待定",{"key":30,"text":633,"correct":22},"因乙超越经营范围而可撤销",[635,638,641,644,647,650],{"id":15,"name":636,"category":7,"favorite":637},"领导干部任职前廉政法规知识测试题",92,{"id":639,"name":640,"category":7,"favorite":15},595,"建筑结构与设备",{"id":642,"name":643,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":645,"name":646,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":648,"name":649,"category":7,"favorite":8},534,"BIM工程师",{"id":651,"name":649,"category":7,"favorite":8},535]