[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-795-29":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":658},{"id":5,"name":6,"category":7,"favorite":8},795,"一建工程法规及相关知识","建筑工程",0,29,50,2683,[13,34,46,64,76,88,100,115,130,145,158,170,182,194,206,218,233,248,260,274,282,294,309,321,333,347,359,371,380,392,407,419,431,443,455,467,479,491,503,517,532,547,559,571,583,598,610,622,634,646],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1132425,1,"单选题","某建筑公司向某钢厂发出一个要约表明了想要购买钢材，钢厂在承诺期限内发出的承诺由于快递公司的失误，该承诺到达建筑公司时已超过了承诺期限，则下列说法正确的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","此种情形属于承诺延误",true,{"key":24,"text":25,"correct":26},"B","此种情形属于承诺超期",false,{"key":28,"text":29,"correct":26},"C","该承诺必然无效",{"key":31,"text":32,"correct":26},"D","该承诺是否有效由双方协商决定","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1132426,"下列关于以招标投标方式订立施工合同的说法中，正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"提交投标文件是承诺",{"key":24,"text":41,"correct":26},"发放招标文件是要约",{"key":28,"text":43,"correct":26},"签订书面合同是承诺",{"key":31,"text":45,"correct":22},"发放中标通知书是承诺",{"id":47,"libraryId":5,"type":48,"typeLabel":49,"stem":50,"options":51,"answer":63,"analysis":33},1132427,2,"多选题","甲建筑公司收到了某水泥厂寄发的价目表但无其他内容。甲按标明价格提出订购1000吨某型号水泥，并附上主要合同条款，却被告知因原材料价格上涨故原来的价格不再适用，要采用提价后的新价格，则下列说法正确的是（ ）。",[52,54,56,58,60],{"key":20,"text":53,"correct":22},"水泥厂的价目表属于要约邀请",{"key":24,"text":55,"correct":22},"甲建筑公司的订购表示属于要约",{"key":28,"text":57,"correct":26},"水泥厂的价目表属于要约",{"key":31,"text":59,"correct":26},"水泥厂新报价属于承诺",{"key":61,"text":62,"correct":22},"E","水泥厂新报价属于要约","ABE",{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":28,"analysis":33},1132428,"要约可以以书面形式、口头对话形式作出，以下关于要约生效的表述中，正确的是（ ）。",[68,70,72,74],{"key":20,"text":69,"correct":26},"口头形式的要约自受要约人了解要约内容时发生效力",{"key":24,"text":71,"correct":26},"书面形式的要约自发出时发生效力",{"key":28,"text":73,"correct":22},"要约到达受要约人时生效",{"key":31,"text":75,"correct":26},"当数据电文进入收件人任何系统的到达时间，该要约发生效力",{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":31,"analysis":33},1132430,"某施工企业向某玻璃厂发出购买玻璃的要约。要求玻璃厂5月20日之前确认，玻璃厂于5月25日答复同意。玻璃厂同意的行为应视为（ ）。",[80,82,84,86],{"key":20,"text":81,"correct":26},"要约邀请",{"key":24,"text":83,"correct":26},"承诺",{"key":28,"text":85,"correct":26},"承诺意向",{"key":31,"text":87,"correct":22},"新要约",{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":31,"analysis":33},1132431,"承诺应当以通知的方式作出，但根据（ ）除外。",[92,94,96,98],{"key":20,"text":93,"correct":26},"要约人拒绝履行的",{"key":24,"text":95,"correct":26},"承诺人撤销承诺的",{"key":28,"text":97,"correct":26},"要约人撤销要约的",{"key":31,"text":99,"correct":22},"交易习惯或者要约表明可以通过行为作出承诺的",{"id":101,"libraryId":5,"type":48,"typeLabel":49,"stem":102,"options":103,"answer":114,"analysis":33},1132432,"根据《合同法》，要约失效的情形有（ ）。",[104,106,108,110,112],{"key":20,"text":105,"correct":22},"受要约人拒绝要约的通知到达要约人",{"key":24,"text":107,"correct":22},"受要约人的承诺对要约内容做了实质性变更",{"key":28,"text":109,"correct":22},"要约中规定的承诺期限届满，要约人未收到承诺通知",{"key":31,"text":111,"correct":22},"发出承诺通知前，撤销要约的通知到达受要约人",{"key":61,"text":113,"correct":26},"受要约人承诺到达要约人后，要约人发出撤销要约的通知","ABCD",{"id":116,"libraryId":5,"type":48,"typeLabel":49,"stem":117,"options":118,"answer":129,"analysis":33},1132433,"《合同法》规定，要约邀请包括（ ）等。",[119,121,123,125,127],{"key":20,"text":120,"correct":22},"拍卖公告",{"key":24,"text":122,"correct":22},"招标公告",{"key":28,"text":124,"correct":26},"递交投标文件",{"key":31,"text":126,"correct":22},"招股说明书",{"key":61,"text":128,"correct":22},"寄送价目表","ABDE",{"id":131,"libraryId":5,"type":48,"typeLabel":49,"stem":132,"options":133,"answer":144,"analysis":33},1132434,"下列说法中对承诺的构成要件理解错误的有（ ）。",[134,136,138,140,142],{"key":20,"text":135,"correct":22},"承诺必须由要约人做出",{"key":24,"text":137,"correct":22},"承诺须向受要约人做出",{"key":28,"text":139,"correct":26},"承诺的内容必须与要约内容一致",{"key":31,"text":141,"correct":26},"承诺应在有效期内做出",{"key":61,"text":143,"correct":26},"承诺具有绝对的特定性","AB",{"id":146,"libraryId":5,"type":48,"typeLabel":49,"stem":147,"options":148,"answer":157,"analysis":33},1132435,"根据《合同法》，下列文件中，不属于要约邀请的有（ ）。",[149,151,153,155,156],{"key":20,"text":150,"correct":22},"投标文件",{"key":24,"text":152,"correct":22},"中标通知书",{"key":28,"text":154,"correct":22},"符合要约规定的售楼广告",{"key":31,"text":120,"correct":26},{"key":61,"text":122,"correct":26},"ABC",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":24,"analysis":33},1132436,"承诺对要约内容的非实质性变更指的是（ ）。",[162,164,166,168],{"key":20,"text":163,"correct":26},"受要约人对合同条款中违约责任和解决争议方法的变更",{"key":24,"text":165,"correct":22},"承诺中增加的建议性条款",{"key":28,"text":167,"correct":26},"承诺中要求增加价款",{"key":31,"text":169,"correct":26},"受要约人对合同履行方式提出独立的主张",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":24,"analysis":33},1132437,"甲施工企业于2013年5月1日向乙企业发出采购80t 钢材的要约，乙于2013年5月5日发出同意出售的承诺信件。2013年5月8日，信件寄至甲企业，时逢其总经理外出，2013年5月9日，总经理知悉了该信内容，于2013年5月10日回电传告知乙收到承诺。该承诺自（ ）起生效。",[174,176,178,180],{"key":20,"text":175,"correct":26},"2013年5月5日",{"key":24,"text":177,"correct":22},"2013年5月8日",{"key":28,"text":179,"correct":26},"2013年5月9日",{"key":31,"text":181,"correct":26},"2013年5月10日",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":28,"analysis":33},1132438,"招标人于2006年4月1日发布招标公告，2006年4月20日发布资格预审公告，2006年5月10日发售招标文件，投标人于投标截止日2006年6月10日及时递交了投标文件，2006年7月20日招标人发出中标通知书，则要约生效的时间是（ ）。",[186,188,190,192],{"key":20,"text":187,"correct":26},"2006年4月1日",{"key":24,"text":189,"correct":26},"2006年5月10日",{"key":28,"text":191,"correct":22},"2006年6月10日",{"key":31,"text":193,"correct":26},"2006年7月20日",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":24,"analysis":33},1132439,"某施工企业向某材料供应商发出了要约，材料供应商在对施工企业的答复中仅仅要求将交货时间推迟一天。根据《合同法》的规定，材料供应商的答复是对施工企业要约的（ ）。",[198,200,202,204],{"key":20,"text":199,"correct":26},"实质性变更，该承诺有效",{"key":24,"text":201,"correct":22},"实质性变更，不构成承诺",{"key":28,"text":203,"correct":26},"非实质性变更，不构成承诺",{"key":31,"text":205,"correct":26},"非实质性变更，视为新要约",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":20,"analysis":33},1132440,"某建设工程采用招标方式选择承包人，则关于该建设工程招标过程中的各行为，下列说法中正确的是（ ）。",[210,212,214,216],{"key":20,"text":211,"correct":22},"虽然投标邀请书的对象是明确的，但仍属要约邀请",{"key":24,"text":213,"correct":26},"投标人购买招标文件，属要约行为",{"key":28,"text":215,"correct":26},"投标人参加现场考察，属要约行为",{"key":31,"text":217,"correct":26},"评标委员会推荐中标候选人，属承诺行为",{"id":219,"libraryId":5,"type":48,"typeLabel":49,"stem":220,"options":221,"answer":232,"analysis":33},1132441,"承诺应当以通知的方式作出，但根据（ ）表明可以通过行为作出承诺的除外。",[222,224,226,228,230],{"key":20,"text":223,"correct":26},"法律规定",{"key":24,"text":225,"correct":22},"交易习惯",{"key":28,"text":227,"correct":26},"承诺内容",{"key":31,"text":229,"correct":26},"交易的性质",{"key":61,"text":231,"correct":22},"要约","BE",{"id":234,"libraryId":5,"type":48,"typeLabel":49,"stem":235,"options":236,"answer":247,"analysis":33},1132443,"为使要约不再生效，要约人可以发出撤销通知，该通知能够生效的条件是（ ）。",[237,239,241,243,245],{"key":20,"text":238,"correct":22},"受要约人发出承诺通知之前收到要约撤销通知",{"key":24,"text":240,"correct":26},"要约人接到承诺通知之前发出要约撤销通知",{"key":28,"text":242,"correct":26},"要约人发出的要约通知中已明确规定了承诺期限",{"key":31,"text":244,"correct":26},"要约人发出的要约通知中未明确规定承诺期限",{"key":61,"text":246,"correct":22},"受要约人发出承诺通知的同时，收到要约撤销通知","AE",{"id":249,"libraryId":5,"type":48,"typeLabel":49,"stem":250,"options":251,"answer":259,"analysis":33},1132444,"所有的合同的订立过程都必须经过（ ）过程。",[252,253,254,255,257],{"key":20,"text":81,"correct":26},{"key":24,"text":231,"correct":22},{"key":28,"text":83,"correct":22},{"key":31,"text":256,"correct":26},"公证",{"key":61,"text":258,"correct":26},"鉴证","BC",{"id":261,"libraryId":5,"type":48,"typeLabel":49,"stem":262,"options":263,"answer":129,"analysis":33},1132445,"下列情形导致要约失效的有（ ）。",[264,266,268,270,272],{"key":20,"text":265,"correct":22},"拒绝要约的通知到达要约人",{"key":24,"text":267,"correct":22},"要约人依法撤销要约",{"key":28,"text":269,"correct":26},"要约人依法撤回要约",{"key":31,"text":271,"correct":22},"承诺期届满，受要约人未作出承诺",{"key":61,"text":273,"correct":22},"受要约人对要约的内容作出实质性变更",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},1132446,"甲公司的总经理张三到乙公司的董事长李四的办公室，看到丙公司向乙公司发出一份要约，很感兴趣，便向李四要了这份要约，并按照要约上的要求回复了丙公司，甲公司发出的文件属于（ ）。",[278,279,280,281],{"key":20,"text":81,"correct":26},{"key":24,"text":87,"correct":22},{"key":28,"text":83,"correct":26},{"key":31,"text":85,"correct":26},{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":20,"analysis":33},1132447,"某施工单位以电子邮件的方式向某设备供应商发出要约，该供应商公布了三个电子邮箱，并且没有特别指定。则此要约的生效时间是（ ）。",[286,288,290,292],{"key":20,"text":287,"correct":22},"该要约进入任一电子邮箱的首次时间",{"key":24,"text":289,"correct":26},"该要约进入三个电子邮箱的最后时间",{"key":28,"text":291,"correct":26},"该供应商获悉该要约收到的时间",{"key":31,"text":293,"correct":26},"该供应商理解该要约内容的时间",{"id":295,"libraryId":5,"type":48,"typeLabel":49,"stem":296,"options":297,"answer":308,"analysis":33},1132448,"要约的构成要件为（ ）。",[298,300,302,304,306],{"key":20,"text":299,"correct":26},"要约必须由特定人作出承诺",{"key":24,"text":301,"correct":22},"要约是由特定人作出的意思表示",{"key":28,"text":303,"correct":22},"要约必须具有订立合同的意思表示",{"key":31,"text":305,"correct":22},"要约的内容必须具体明确",{"key":61,"text":307,"correct":22},"要约必须向要约人希望与之订立合同的受要约人发出","BCDE",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":20,"analysis":33},1132449,"水泥厂在承诺有效期内，对施工单位订购水泥的要约做出了完全同意的答复，则该水泥买卖合同成立的时间为（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":22},"水泥厂的答复文件到达施工单位时",{"key":24,"text":316,"correct":26},"施工单位发出订购水泥的要约时",{"key":28,"text":318,"correct":26},"水泥厂发出答复文件时",{"key":31,"text":320,"correct":26},"施工单位订购水泥的要约到达水泥厂时",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":31,"analysis":33},1132450,"承包商为追赶工期，向水泥厂紧急发函要求按市场价格订购200吨425硅酸盐水泥，并要求三日内运抵施工现场。则承包商的订购行为（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":26},"属于要约邀请，随时可以撤销",{"key":24,"text":328,"correct":26},"属于要约，在水泥运抵施工现场前可以撤回",{"key":28,"text":330,"correct":26},"属于要约，在水泥运抵施工现场前可以撤销",{"key":31,"text":332,"correct":22},"属于要约，而且不可撤销",{"id":334,"libraryId":5,"type":48,"typeLabel":49,"stem":335,"options":336,"answer":346,"analysis":33},1132451,"下列市场行为中，不属于承诺的有（ ）。",[337,339,341,343,345],{"key":20,"text":338,"correct":22},"发布招标公告",{"key":24,"text":340,"correct":22},"发布拍卖公告",{"key":28,"text":342,"correct":22},"发售招标文件",{"key":31,"text":344,"correct":26},"发出中标通知书",{"key":61,"text":124,"correct":22},"ABCE",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":31,"analysis":33},1132452,"根据《合同法》的规定，下列承诺有效的是（ ）。",[351,353,355,357],{"key":20,"text":352,"correct":26},"对要约的内容作了实质性变更",{"key":24,"text":354,"correct":26},"撤回承诺的通知与承诺同时到达要约人",{"key":28,"text":356,"correct":26},"撤回承诺的通知先于承诺到达要约人",{"key":31,"text":358,"correct":22},"承诺通知因为意外事件而迟到，但要约人怠于及时通知承诺人",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":28,"analysis":33},1132453,"某建设工程发包人经过招标确定了中标人，双方依法签订了施工合同，则该施工合同成立的时间为（ ）之日。",[363,365,367,369],{"key":20,"text":364,"correct":26},"合同备案",{"key":24,"text":366,"correct":26},"评标委员会提交评标报告",{"key":28,"text":368,"correct":22},"中标通知发出",{"key":31,"text":370,"correct":26},"发包人确定中标人",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":20,"analysis":33},1132454,"某建筑公司致函钢材经销商甲公司：“我公司欲以3300元\u002Ft 的价格购买你公司Φ25的螺纹钢30t ，有意者请于3日内回复。”乙公司获悉此事，赶在甲公司回复之前致电建筑公司：“同意报价，准备接货事宜。”请问，乙公司发出的这份通知属于（ ）。",[375,376,377,379],{"key":20,"text":231,"correct":22},{"key":24,"text":83,"correct":26},{"key":28,"text":378,"correct":26},"反要约",{"key":31,"text":81,"correct":26},{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":28,"analysis":33},1132455,"根据《合同法》的规定，撤销要约的通知应当在( )到达受要约人。",[384,386,388,390],{"key":20,"text":385,"correct":26},"双方订立正式合同之前",{"key":24,"text":387,"correct":26},"要约人实际履行合同之前",{"key":28,"text":389,"correct":22},"受要约人发出承诺通知之前",{"key":31,"text":391,"correct":26},"受要约人发出的承诺通知到达要约人之前",{"id":393,"libraryId":5,"type":48,"typeLabel":49,"stem":394,"options":395,"answer":406,"analysis":33},1132456,"根据《合同法》，撤回要约的通知应当（ ）。2014",[396,398,400,402,404],{"key":20,"text":397,"correct":26},"在要约到达受要约人之后到达受要约人",{"key":24,"text":399,"correct":26},"在受要约人发出承诺之前到达受要约人",{"key":28,"text":401,"correct":26},"在受要约人发出承诺同时到达受要约人",{"key":31,"text":403,"correct":22},"在要约到达受要约人之前到达受要约人",{"key":61,"text":405,"correct":22},"与要约同时到达受要约人","DE",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":20,"analysis":33},1132457,"（2019年真题）某施工企业向某建筑材料供应商发出购买建筑材料的要约,该建筑材料供应商在承诺有效期内对该要约作出了完全同意的答复,则该卖合同成的时间为()。",[411,413,415,417],{"key":20,"text":412,"correct":22},"建筑材料供应商的答复文件到达施工企业时",{"key":24,"text":414,"correct":26},"施工企业发出订购建筑材料的要约时",{"key":28,"text":416,"correct":26},"建筑材料供应商发出答复文件时",{"key":31,"text":418,"correct":26},"施工企业订购建筑材料的要约到达建筑材料供应商时",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":31,"analysis":33},1132458,"（2019年真题）关于行政机关实施行政强制执行的说法,正确的是（）。",[423,425,427,429],{"key":20,"text":424,"correct":26},"执行标的灭失的,中止执行",{"key":24,"text":426,"correct":26},"执行可能造成难以弥补损失的,终结执行",{"key":28,"text":428,"correct":26},"一律不得在夜间或法定节假日实施行政执行",{"key":31,"text":430,"correct":22},"执行完毕后,据以执行的行政决定被撤销的,应当恢复原状或者退还财物",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":20,"analysis":33},1132459,"以下各项，施工合同质量纠纷成因表述错误的是（ ）。",[435,437,439,441],{"key":20,"text":436,"correct":22},"建筑材料没有注册商标",{"key":24,"text":438,"correct":26},"监理制度不严格",{"key":28,"text":440,"correct":26},"建设单位不顾实际地降低造价，缩短工期",{"key":31,"text":442,"correct":26},"施工单位在施工过程中偷工减料",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":31,"analysis":33},1132460,"《合同法》规定的建设工程承包人优先受偿权的价款范围不包含（ ）。",[447,449,451,453],{"key":20,"text":448,"correct":26},"工程材料款",{"key":24,"text":450,"correct":26},"工程人员的报酬",{"key":28,"text":452,"correct":26},"工程管理费用",{"key":31,"text":454,"correct":22},"工程停工费用",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":31,"analysis":33},1132461,"甲公司把 A、B两栋楼工程发包给乙公司施工，乙公司私下把B楼的施工任务转包给丙公司，丙公司又把B楼的外装修工程分包给丁施工队完成。工程完工后甲公司付清了乙公司工程款，但是丁施工队没有拿到工程款，准备起诉。下面的说法中，不正确的是（ ）。",[459,461,463,465],{"key":20,"text":460,"correct":26},"丁施工队是B楼外装修工程的实际施工人",{"key":24,"text":462,"correct":26},"甲公司没把工程款给实际施工人，应当承担还款责任",{"key":28,"text":464,"correct":26},"丁施工队可以起诉丙公司、乙公司及甲公司",{"key":31,"text":466,"correct":22},"丁施工队只可以起诉丙公司",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":20,"analysis":33},1132462,"某人挂靠某建筑施工企业并以该企业的名义承揽工程，因工程质量不合格给建设单位造成较大损失，关于责任承担的说法，正确的是（ ）。",[471,473,475,477],{"key":20,"text":472,"correct":22},"建筑施工企业与挂靠个人承担连带赔偿责任",{"key":24,"text":474,"correct":26},"挂靠的个人承担全部责任",{"key":28,"text":476,"correct":26},"建筑施工企业承担全部责任",{"key":31,"text":478,"correct":26},"建筑施工企业与挂靠个人按比例承担责任",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":28,"analysis":33},1132463,"某建设工程项目施工过程中发生不可抗力事件，建筑物受损严重，部分施工机具损毁，施工人员受伤，工期拖延一个月，关于损失承担的说法，正确的是（ ）。",[483,485,487,489],{"key":20,"text":484,"correct":26},"工期不予顺延",{"key":24,"text":486,"correct":26},"建筑物受损由施工企业承担",{"key":28,"text":488,"correct":22},"施工机具损毁由施工企业自行承担",{"key":31,"text":490,"correct":26},"施工人员受伤由建设单位承担",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":28,"analysis":33},1132464,"承包商向水泥厂购买袋装水泥并按合同约定支付全部货款。因运输公司原因导致水泥交货延误2天，承包商收货后要求水泥厂支付违约金，水泥厂予以拒绝。承包商认为水泥厂违约，因而未对堆放水泥采取任何保护措施，次日大雨，水泥受潮全部硬化。此损失应由（ ）承担。",[495,497,499,501],{"key":20,"text":496,"correct":26},"三方共同",{"key":24,"text":498,"correct":26},"水泥厂",{"key":28,"text":500,"correct":22},"承包商",{"key":31,"text":502,"correct":26},"运输公司",{"id":504,"libraryId":5,"type":48,"typeLabel":49,"stem":505,"options":506,"answer":114,"analysis":33},1132465,"根据施工企业要求对原工程进行变更的，说法正确的有（ ）。",[507,509,511,513,515],{"key":20,"text":508,"correct":22},"施工企业在施工中不得对原工程设计进行变更",{"key":24,"text":510,"correct":22},"施工企业在施工中提出更改施工组织设计的须经工程师同意，延误的工期不予顺延",{"key":28,"text":512,"correct":22},"工程师采用施工企业合理化建议所获得的收益，建设单位和施工企业另行约定分享",{"key":31,"text":514,"correct":22},"施工企业擅自变更设计发生的费用和由此导致的建设单位的损失由施工企业承担，延误的工期不予顺延",{"key":61,"text":516,"correct":26},"施工企业自行承担差价时，对原材料、设备换用不必经工程师同意",{"id":518,"libraryId":5,"type":48,"typeLabel":49,"stem":519,"options":520,"answer":531,"analysis":33},1132466,"建设工程以赔偿损失方式承担违约责任的构成要件包括（ ）。",[521,523,525,527,529],{"key":20,"text":522,"correct":26},"违反职业道德规范",{"key":24,"text":524,"correct":22},"造成损失后果",{"key":28,"text":526,"correct":22},"具有违约行为",{"key":31,"text":528,"correct":26},"违反建筑企业内部文件",{"key":61,"text":530,"correct":22},"违约行为与财产等损失之间有因果关系","BCE",{"id":533,"libraryId":5,"type":48,"typeLabel":49,"stem":534,"options":535,"answer":546,"analysis":33},1132467,"下列关于建设工程质量不符合约定情况的责任承担，说法错误的是（ ）。",[536,538,540,542,544],{"key":20,"text":537,"correct":26},"因承包人过错造成工程质量不符合约定且又拒绝修理、返工或改建的，发包人可以减少支付工程款",{"key":24,"text":539,"correct":26},"因发包人直接指定购买的建筑材料不符合强制标准应承担过错责任",{"key":28,"text":541,"correct":22},"发包人提供的设计有缺陷，由发包人承担全部质量责任",{"key":31,"text":543,"correct":26},"建设工程施工合同解除后，已经完成的工程经修复后质量仍不合格，发包人不支付相应的工程款",{"key":61,"text":545,"correct":22},"由于发包人要求返工，造成工程逾期交付的，承包人不承担违约责任","CE",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":31,"analysis":33},1132468,"2007年1月1日，某开发商将自己名下唯一的财产一处不动产以赠予的形式让给自己的关联公司，2010年1月1日，开发商的债权人建筑公司（开发商长期拖欠建筑公司工程款项）知道了该转让行为，则建筑公司的撤销权截止于（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":26},"2009年1月1日",{"key":24,"text":554,"correct":26},"2008年1月1日",{"key":28,"text":556,"correct":26},"2012年1月1日",{"key":31,"text":558,"correct":22},"2011年1月1日",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":28,"analysis":33},1132469,"某工程施工中某水泥厂为施工企业供应水泥，延迟交货一周，延迟交货导致施工企业每天损失0.4万元，第一天晚上施工企业为减少损失，采取紧急措施共花费1万元，使剩余6天共损失0.7万元。2018真题则水泥厂因违约应向施工企业赔偿的损失为（）。2018真题",[563,565,567,569],{"key":20,"text":564,"correct":26},"1.1万元",{"key":24,"text":566,"correct":26},"1.7万元",{"key":28,"text":568,"correct":22},"2.1万元",{"key":31,"text":570,"correct":26},"2.8万元",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":31,"analysis":33},1132470,"甲施工企业与乙水泥厂签订水泥供应合同，在约定的履行日期届满时，水泥厂未能按时供应水泥。由于甲施工企业没有采取适当措施寻找货源，致使损失扩大。对于扩大的损失应 该由（ ）。( 2015真题 )",[575,577,579,581],{"key":20,"text":576,"correct":26},"乙水泥厂承担",{"key":24,"text":578,"correct":26},"双方连带责任",{"key":28,"text":580,"correct":26},"双方按比例承担",{"key":31,"text":582,"correct":22},"甲施工企业承担",{"id":584,"libraryId":5,"type":48,"typeLabel":49,"stem":585,"options":586,"answer":597,"analysis":33},1132471,"根据《合同法》，发包人应当承担赔偿损失责任的情形有（ ）。( 2015真题 )",[587,589,591,593,595],{"key":20,"text":588,"correct":22},"未及时检查隐蔽工程造成的损失",{"key":24,"text":590,"correct":26},"偷工减料造成的损失",{"key":28,"text":592,"correct":22},"验收违法行为造成的损失",{"key":31,"text":594,"correct":22},"中途变更承包工作要求造成的损失",{"key":61,"text":596,"correct":22},"提供图纸或者技术要求不合理且怠于答复造成的损失","ACDE",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":31,"analysis":33},1132472,"一方当事人的违约行为导致工程受到5万元的损失时，对方及时地采取了减损措施，支出的费用为1万元，但仍未能终止损害，工程实际损害费用为7万元。依据《合同法》的违约责任规定，违约方应承担的赔偿额为（ ）万元。",[602,604,606,608],{"key":20,"text":603,"correct":26},"5",{"key":24,"text":605,"correct":26},"6",{"key":28,"text":607,"correct":26},"7",{"key":31,"text":609,"correct":22},"8",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":31,"analysis":33},1132473,"乙方的违约行为导致工程受到损失，甲方采取措施减损，导致损失减少到3万元，但甲方支出相应的措施费用是0.5万元，乙方应该支付甲方（ ）万元费用。",[614,616,618,620],{"key":20,"text":615,"correct":26},"0.5",{"key":24,"text":617,"correct":26},"2.5",{"key":28,"text":619,"correct":26},"3",{"key":31,"text":621,"correct":22},"3.5",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":28,"analysis":33},1132474,"某贸易公司与某建材供应商签订合同，约定供应商应于合同签订后7日内将3000吨钢筋运至某工地，向施工单位履行交货义务。合同签署后，供应商未按合同约定交货，则（ ）。",[626,628,630,632],{"key":20,"text":627,"correct":26},"施工单位与贸易公司应共同向供应商追究违约责任",{"key":24,"text":629,"correct":26},"供应商应向施工单位承担违约责任",{"key":28,"text":631,"correct":22},"供应商应向贸易公司承担违约责任",{"key":31,"text":633,"correct":26},"施工单位与贸易公司均可向供应商追究违约责任",{"id":635,"libraryId":5,"type":15,"typeLabel":16,"stem":636,"options":637,"answer":20,"analysis":33},1132475,"施工企业与材料供应商订立的合同中约定“任何一方不能履行合同须承担违约金3万元，发生争端由某仲裁机构解决”。现供应商延期交货给施工企业造成的损失4.5万元，则施工企业为最大限度维护自身利益，应（ ）。",[638,640,642,644],{"key":20,"text":639,"correct":22},"向某仲裁机构请求供应商支付4.5万元",{"key":24,"text":641,"correct":26},"向某仲裁机构请求供应商支付3万元",{"key":28,"text":643,"correct":26},"直接要求供应商支付7.5万元",{"key":31,"text":645,"correct":26},"直接要求供应商支付3万元",{"id":647,"libraryId":5,"type":15,"typeLabel":16,"stem":648,"options":649,"answer":24,"analysis":33},1132476,"甲与乙订立了一份水泥购销合同，约定甲向乙交付200吨水泥，货款6万元，乙向甲支付定金1万元；如任何一方不履行合同应支付违约金1.5万元。甲因将水泥卖给丙而无法向乙交付，给乙造成损失2万元。乙提出的如下诉讼请求中，不能获得法院支持的是（ ）。",[650,652,654,656],{"key":20,"text":651,"correct":26},"要求甲双倍返还定金2万元",{"key":24,"text":653,"correct":22},"要求甲双倍返还定金2万元，同时支付违约金1.5万元",{"key":28,"text":655,"correct":26},"要求甲支付违约金2万元",{"key":31,"text":657,"correct":26},"要求甲支付违约金1.5万元",[659,662,665,668,671,674],{"id":15,"name":660,"category":7,"favorite":661},"领导干部任职前廉政法规知识测试题",92,{"id":663,"name":664,"category":7,"favorite":15},595,"建筑结构与设备",{"id":666,"name":667,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":669,"name":670,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":672,"name":673,"category":7,"favorite":8},534,"BIM工程师",{"id":675,"name":673,"category":7,"favorite":8},535]