[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1134331":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1134331,795,1,"单选题","根据施工合同，甲建设单位应于2009年9月30日支付乙建筑公司工程款，2010年6月1日，乙单位向甲单位提出支付请求，则该项款的诉讼时效（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","中止",false,{"key":16,"text":17,"correct":18},"B","中断",true,{"key":20,"text":21,"correct":14},"C","终止",{"key":23,"text":24,"correct":14},"D","届满","《民法通则》规定，诉讼时效因提起诉讼、当事人一方提出要求或者同意履行义务而中断。从中断时起，诉讼时效期间重新计算。 本题中，乙向甲提出支付请求，属于当事人一方提出要求的情形，导致诉讼时效中断。 综上所述，本题正确答案为B。",{"id":6,"name":27,"category":28,"favorite":29},"一建工程法规及相关知识","建筑工程",0]