[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1133868":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1133868,795,1,"单选题","（2020年真题）关于建设工程合理使用年限的说法，正确的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","建设工程合理使用年限由建设单位决定",false,{"key":16,"text":17,"correct":14},"B","超过合理使用年限的建设工程必须报废、拆除",{"key":19,"text":20,"correct":14},"C","建设工程合理使用年限从工程实际转移占有之日起算",{"key":22,"text":23,"correct":24},"D","设计文件应当符合国家规定的设计深度要求，并注明工程合理使用年限",true,"P309-313 《建设工程质量管理条例》规定,设计单位应当根据勘察成果文件进行建设工程设计。设计文件应当符合国家规定的设计深度要求,注明工程合理使用年限。",{"id":6,"name":27,"category":28,"favorite":29},"一建工程法规及相关知识","建筑工程",0]