[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1132023":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1132023,795,1,"单选题","某建设工程项目的工期为28个月，工程合同价为6000万元。根据《建筑工程施工许管理办法》的规定，建设单位开工前应当到位的资金不少于（ ）万元。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1500",false,{"key":16,"text":17,"correct":18},"B","1800",true,{"key":20,"text":21,"correct":14},"C","2000",{"key":23,"text":24,"correct":14},"D","3000","根据《建筑工程施工许可管理办法》的规定，建设工期不足一年的，到位资金原则上不得少于工程合同价的50%，建设工期超过一年的，到位资金原则上不得少于工程合同价的30%。 在本题中，项目工期为28个月，工程合同价为6000万，到位的资金原则上不得少于工程价的30%，即1800万。 综上所述，本题的正确答案为B。",{"id":6,"name":27,"category":28,"favorite":29},"一建工程法规及相关知识","建筑工程",0]