[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1131344":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1131344,795,1,"单选题","根据《水污染防治法》，与建设项目主体工程同时设计、同时施工、同时投入使用的水污染防治设施，应当经过( )验收，验收不合格的，该建设项目不得投入生产或者使用。（2012）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","建设行政主管部门",false,{"key":16,"text":17,"correct":14},"B","省级人民政府",{"key":19,"text":20,"correct":14},"C","县级以上人民政府",{"key":22,"text":23,"correct":24},"D","环境保护主管部门",true,"",{"id":6,"name":27,"category":28,"favorite":29},"一建工程法规及相关知识","建筑工程",0]