[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-794-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":610},{"id":5,"name":6,"category":7,"favorite":8},794,"一建港口与航道工程实务","建筑工程",0,7,50,1132,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,477,488,500,508,520,532,544,556,565,577,586,598],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1129652,1,"单选题","内河航运工程船舶机械设备艘（台）班费用包括第一类费用和第二类费用，（ ）属于第二类费用。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","船舶检修费",false,{"key":24,"text":25,"correct":26},"B","人工费",true,{"key":28,"text":29,"correct":22},"C","船舶小修费",{"key":31,"text":32,"correct":22},"D","船舶航修费","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1129653,"水运工程混凝土和砂浆材料用量定额中，计算1m3混凝土及砂浆材料用量时（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"可以直接套用",{"key":24,"text":41,"correct":22},"尚应考虑施工中倒运的损失量",{"key":28,"text":43,"correct":22},"尚应考虑混凝土运输中的损失量",{"key":31,"text":45,"correct":22},"尚应考虑砂、石筛洗中的耗损量",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1129657,"关于板桩码头的说法，错误的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"主要是由连续地打入地基一定深度的板形桩构成的直立墙体，墙体上部一般由锚碇结构加以锚碇",{"key":24,"text":53,"correct":22},"有结构简单、用料省、方便施工等优点",{"key":28,"text":55,"correct":26},"对复杂地质条件适应性差，所以一般应用受限",{"key":31,"text":57,"correct":22},"耐久性较差",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1129658,"对四脚空心方块的安放，其相邻块体的高差不应大于（）mm，砌缝的最大宽度不应大于100mm。",[62,64,66,68],{"key":20,"text":63,"correct":22},"100",{"key":24,"text":65,"correct":26},"150",{"key":28,"text":67,"correct":22},"200",{"key":31,"text":69,"correct":22},"250",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1129659,"当缺乏打桩设备且具有干地施工条件时，板桩码头可采用（）结构。",[74,76,78,80],{"key":20,"text":75,"correct":22},"无锚板桩",{"key":24,"text":77,"correct":22},"斜拉桩式板桩",{"key":28,"text":79,"correct":26},"地下墙式板桩",{"key":31,"text":81,"correct":22},"有锚板桩",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1129660,"关于板桩码头锚碇系统拉杆施工的说法，错误的是（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"当设计对拉杆的安装支垫无具体规定时，将拉杆搁置在间距5m左右垫平的垫块上",{"key":24,"text":89,"correct":22},"钢拉杆及其附件在安装前，应进行除锈并涂上两道防锈漆",{"key":28,"text":91,"correct":22},"在锚碇结构前回填完成和锚锭结构及板桩墙导梁或胸墙的现浇混凝土达到设计强度后，才开始张紧拉杆",{"key":31,"text":93,"correct":26},"拉杆螺母全部旋进，并不得有丝扣外露，才可对拉杆进行回填",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1129661,"高桩码头施工中，沉桩后采用“双控”指标以保证满足设计承载力的要求，即控制（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"桩尖标高及桩尖的设计土层",{"key":24,"text":101,"correct":26},"桩尖标高及最后的沉桩贯入度",{"key":28,"text":103,"correct":22},"贯人度变化及桩的下沉量",{"key":31,"text":105,"correct":22},"桩尖的设计土层及高应变动测值",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},1129662,"斜坡堤护面有多种结构形式，处于波浪较大区域的斜坡堤，应采用（）护面。",[110,112,114,116],{"key":20,"text":111,"correct":22},"砌石",{"key":24,"text":113,"correct":22},"块石",{"key":28,"text":115,"correct":26},"人工块体",{"key":31,"text":117,"correct":22},"模袋混凝土",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1129663,"当挖槽终端水域受限，挖泥船挖到终点后无法调头时，耙吸挖泥船应采用的施工方法是（）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"往返挖泥法",{"key":24,"text":125,"correct":22},"锚缆横挖法",{"key":28,"text":127,"correct":22},"十字形横挖法",{"key":31,"text":129,"correct":26},"进退挖泥法",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},1129664,"自航耙吸挖泥船以（）来衡量其大小。",[134,136,138,140],{"key":20,"text":135,"correct":22},"生产率",{"key":24,"text":137,"correct":22},"装机功率",{"key":28,"text":139,"correct":26},"舱容",{"key":31,"text":141,"correct":22},"艏吹管路流量",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1129665,"基床夯实时，为避免发生“倒锤”或偏夯而影响夯实效果，每层夯实前应对抛石面层作适当整平，其局部高差不宜大于（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"100mm",{"key":24,"text":149,"correct":22},"200mm",{"key":28,"text":151,"correct":26},"300mm",{"key":31,"text":153,"correct":22},"500mm",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1129666,"重力式码头胸墙混凝土直接在填料上浇筑时，应在（ ）浇筑。",[158,160,162,164],{"key":20,"text":159,"correct":22},"填筑后",{"key":24,"text":161,"correct":26},"填筑密实后",{"key":28,"text":163,"correct":22},"填筑密实三个月以后",{"key":31,"text":165,"correct":22},"填筑密实六个月以后",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1129667,"高桩码头在斜坡上打桩和打斜桩时，拟定合理的打桩顺序，采取恰当的（ ），以保证沉桩完毕后的最终位置符合设计规定。",[170,172,174,176],{"key":20,"text":171,"correct":22},"在原桩位下沉",{"key":24,"text":173,"correct":26},"偏离桩位下沉",{"key":28,"text":175,"correct":22},"按设计桩位下沉",{"key":31,"text":177,"correct":22},"打桩施工顺序",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},1129668,"港口与航道工程中高桩码头的预制构件采用绳扣吊运时，其吊点位置偏差不应超过设计规定位置（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"±100mm",{"key":24,"text":185,"correct":22},"±150mm",{"key":28,"text":187,"correct":26},"±200mm",{"key":31,"text":189,"correct":22},"±300mm",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1129669,"高桩码头构件存放场多层堆放预制构件时，各层垫木应位于（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"同一垂直面上，其位置偏差不应超过±100mm",{"key":24,"text":197,"correct":26},"同一垂直面上，其位置偏差不应超过±200mm",{"key":28,"text":199,"correct":22},"同一水平面上，其位置偏差不应超过±100mm",{"key":31,"text":201,"correct":22},"同一水平面上，其位置偏差不应超过±200mm",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},1129670,"高桩码头叠合板预制件在安装就位以后，要（ ），以使构件稳固。",[206,208,210,212],{"key":20,"text":207,"correct":22},"用张紧器临时拉条稳住",{"key":24,"text":209,"correct":22},"将两根相接的底部伸出的钢筋焊接起来",{"key":28,"text":211,"correct":22},"立即浇筑混凝土",{"key":31,"text":213,"correct":26},"将接缝处伸出的钢筋焊接起来",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},1129671,"对高桩码头上部装配式整体结构的混凝土施工，正确的做法是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"应将纵横梁节点、预制板缝及码头面层的混凝土一次浇筑",{"key":24,"text":221,"correct":22},"应先浇筑横梁节点的混凝土，然后将纵梁、预制板缝及码头面层一次浇筑",{"key":28,"text":223,"correct":22},"应先浇筑纵横梁节点的混凝土，然后将预制板缝及码头面层一次浇筑",{"key":31,"text":225,"correct":26},"应先浇筑纵横梁节点及预制板缝中的混凝土，再浇筑码头面层",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},1129672,"高桩码头在接岸结构岸坡回填土和抛石时，不宜（ ）推进的施工方法。",[230,232,234,236],{"key":20,"text":231,"correct":26},"由岸向水域方向",{"key":24,"text":233,"correct":22},"由水域向岸方向",{"key":28,"text":235,"correct":22},"顺水流方向",{"key":31,"text":237,"correct":22},"逆水流方向",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},1129673,"板桩建筑物中锚碇板一般是预制的钢筋混凝土板块，当板块为连续设置时，称为（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"锚碇梁",{"key":24,"text":245,"correct":22},"锚碇板桩",{"key":28,"text":247,"correct":22},"锚碇墙板",{"key":31,"text":249,"correct":26},"锚碇墙",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},1129674,"锚碇叉桩是由一对叉桩和其上端现浇桩帽组成。叉桩中前面一根是压桩，后面一根为拉桩。它是靠两根斜桩轴向力的（ ）之和来承受拉杆的拉力。",[254,256,258,260],{"key":20,"text":255,"correct":22},"垂直分力",{"key":24,"text":257,"correct":26},"水平分力",{"key":28,"text":259,"correct":22},"垂直和水平分力",{"key":31,"text":261,"correct":22},"合力",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},1129675,"斜坡堤土工织物铺设块的拼缝宜采用“丁缝”或“包缝”连接，但在长度方向（主要受力方向）（ ）接头缝。",[266,268,270,272],{"key":20,"text":267,"correct":26},"不得有",{"key":24,"text":269,"correct":22},"可以有",{"key":28,"text":271,"correct":22},"可有少量",{"key":31,"text":273,"correct":22},"根据需要可有",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},1129676,"斜坡堤水下土工织物铺设后应（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"及时抛（回）填，以便下道工序施工",{"key":24,"text":281,"correct":26},"及时抛（回）填，防止风浪损坏",{"key":28,"text":283,"correct":22},"裸露一段时间，以便施工检查",{"key":31,"text":285,"correct":22},"裸露一段时间，以便下道工序施工",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":28,"analysis":33},1129677,"用于斜坡堤堤心石抛填的开底驳和自动翻石船，适用于（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"补抛",{"key":24,"text":293,"correct":22},"细抛",{"key":28,"text":295,"correct":26},"粗抛",{"key":31,"text":297,"correct":22},"散抛",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},1129678,"斜坡堤堤心石水上抛填块石，应根据水深、水流和波浪等自然条件对块石产生的（ ）的影响，确定抛石船的驻位。",[302,304,306,308],{"key":20,"text":303,"correct":26},"漂流",{"key":24,"text":305,"correct":22},"位移",{"key":28,"text":307,"correct":22},"变位",{"key":31,"text":309,"correct":22},"移位",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":28,"analysis":33},1129679,"预制人工块体重量的允许偏差为（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"±1％",{"key":24,"text":317,"correct":22},"±3％",{"key":28,"text":319,"correct":26},"±5％",{"key":31,"text":321,"correct":22},"±8％",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},1129680,"预制混凝土护面块体的底模可根据（ ）分别采用混凝土地坪和混凝土胎膜或钢模。",[326,328,330,332],{"key":20,"text":327,"correct":26},"制作方式",{"key":24,"text":329,"correct":22},"块体尺度",{"key":28,"text":331,"correct":22},"成型方式",{"key":31,"text":333,"correct":22},"块体重量",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":28,"analysis":33},1129681,"对于卵石浅滩，采取适当的措施减小汇流角，改善汇流条件，增大浅区冲刷能力的整治方法适用于（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"弯道浅滩",{"key":24,"text":341,"correct":22},"过渡段浅滩",{"key":28,"text":343,"correct":26},"支流河口浅滩",{"key":31,"text":345,"correct":22},"汊道浅滩",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},1129682,"采取疏浚开挖与筑坝壅水相结合的工程措施，分散水面的集中落差，减缓流速比降的整治方法适用于（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"卵石急滩",{"key":24,"text":353,"correct":26},"连续急滩",{"key":28,"text":355,"correct":22},"崩岩急滩",{"key":31,"text":357,"correct":22},"滑坡急滩",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":28,"analysis":33},1129683,"根据突嘴的分布位置和形态，切除部分突嘴，延长错口长度，利于船舶交替利用两岸缓流上滩的整治方法适用于（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"对口型突嘴急滩",{"key":24,"text":365,"correct":22},"窄槽型急滩",{"key":28,"text":367,"correct":26},"错口型突嘴急滩",{"key":31,"text":369,"correct":22},"潜埂型急滩",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},1129684,"土工织物软体排护滩铺设方向宜（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":22},"平行护滩带轴线，自下游向上游",{"key":24,"text":377,"correct":26},"垂直护滩带轴线，自下游向上游",{"key":28,"text":379,"correct":22},"平行护滩带轴线，自上游向下游",{"key":31,"text":381,"correct":22},"垂直护滩带轴线，自上游向下游",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},1129685,"砂枕充填宜采用泥浆泵充填，砂枕充填饱满度不应大于（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":22},"70％",{"key":24,"text":389,"correct":26},"80％",{"key":28,"text":391,"correct":22},"85％",{"key":31,"text":393,"correct":22},"90％",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":33},1129686,"透水框架可叠加摆放，叠加层级不宜超过（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"2层",{"key":24,"text":401,"correct":26},"3层",{"key":28,"text":403,"correct":22},"4层",{"key":31,"text":405,"correct":22},"5层",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},1129687,"石笼护脚施工时，石笼抛投应根据（ ）合理划分施工区段，采用网格法施工。",[410,412,414,416],{"key":20,"text":411,"correct":26},"工程规模",{"key":24,"text":413,"correct":22},"节点工期",{"key":28,"text":415,"correct":22},"水下地形",{"key":31,"text":417,"correct":22},"护脚高程",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":28,"analysis":33},1129688,"浆砌块石挡墙宜为平缝，勾缝砂浆的强度应比砌体砂浆强度高一级，勾缝深度宜为（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"10～20mm",{"key":24,"text":425,"correct":22},"10～30mm",{"key":28,"text":427,"correct":26},"20～30mm",{"key":31,"text":429,"correct":22},"20～40mm",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":31,"analysis":33},1129689,"下列关于水下裸露爆破施工的说法，错误的是（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":22},"宜采用船投法",{"key":24,"text":437,"correct":22},"从深水到浅水",{"key":28,"text":439,"correct":22},"由下游向上游",{"key":31,"text":441,"correct":26},"宜采用单串药包",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},1129690,"耙吸挖泥船是一种自航、自载式挖泥船，按其类型属（ ）挖泥船。",[446,448,450,452],{"key":20,"text":447,"correct":22},"机械式",{"key":24,"text":449,"correct":26},"水力式",{"key":28,"text":451,"correct":22},"气动式",{"key":31,"text":453,"correct":22},"电动式",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":31,"analysis":33},1129691,"影响挖泥船时间利用率的因素有（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"土质",{"key":24,"text":461,"correct":22},"挖宽",{"key":28,"text":463,"correct":22},"挖深",{"key":31,"text":465,"correct":26},"水流",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":28,"analysis":33},1129692,"下列施工方法中，属于耙吸挖泥船施工方法的是（ ）。",[470,471,473,475],{"key":20,"text":125,"correct":22},{"key":24,"text":472,"correct":22},"扇形横挖法",{"key":28,"text":474,"correct":26},"吹填施工法",{"key":31,"text":476,"correct":22},"斜向横挖法",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":24,"analysis":33},1129693,"当耙吸挖泥船的舱容设有几档舱容或舱容可连续调节时应根据（ ）选择合理的舱容。",[481,483,485,486],{"key":20,"text":482,"correct":22},"水深",{"key":24,"text":484,"correct":26},"疏浚土质",{"key":28,"text":465,"correct":22},{"key":31,"text":487,"correct":22},"风浪",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":20,"analysis":33},1129694,"耙吸挖泥船开挖流动性淤泥宜选用的耙头是（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":26},"冲刷型耙头",{"key":24,"text":495,"correct":22},"挖掘型耙头",{"key":28,"text":497,"correct":22},"吸入型耙头",{"key":31,"text":499,"correct":22},"主动挖掘型耙头",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":24,"analysis":33},1129695,"耙吸挖泥船开挖软黏土宜选用的耙头是（ ）。",[504,505,506,507],{"key":20,"text":493,"correct":22},{"key":24,"text":495,"correct":26},{"key":28,"text":497,"correct":22},{"key":31,"text":499,"correct":22},{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":20,"analysis":33},1129696,"在内河施工采用钢桩定位时，宜采用（ ）。",[512,514,516,518],{"key":20,"text":513,"correct":26},"顺流施工",{"key":24,"text":515,"correct":22},"逆流施工",{"key":28,"text":517,"correct":22},"顺流施工并下尾锚以策安全",{"key":31,"text":519,"correct":22},"分条施工",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":31,"analysis":33},1129697,"绞吸式挖泥船挖掘生产率与下列因素中有关的是（ ）。",[524,526,528,530],{"key":20,"text":525,"correct":22},"泥浆浓度",{"key":24,"text":527,"correct":22},"流量",{"key":28,"text":529,"correct":22},"排距",{"key":31,"text":531,"correct":26},"绞刀前移距",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":28,"analysis":33},1129698,"绞吸挖泥船开挖淤泥类土的分层挖泥厚度宜为绞刀直径的（ ）。",[536,538,540,542],{"key":20,"text":537,"correct":22},"1．0～1．5倍",{"key":24,"text":539,"correct":22},"1．5～2．0倍",{"key":28,"text":541,"correct":26},"1．5～2．5倍",{"key":31,"text":543,"correct":22},"2．0～2．5倍",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":20,"analysis":33},1129699,"链斗式挖泥船的泥斗充泥系数与所挖土质有关，硬黏土的泥斗充泥系数为（ ）。",[548,550,552,554],{"key":20,"text":549,"correct":26},"0．90",{"key":24,"text":551,"correct":22},"0．95",{"key":28,"text":553,"correct":22},"1．00",{"key":31,"text":555,"correct":22},"1．05",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":31,"analysis":33},1129700,"施工区水流流速较大时链斗船宜采用（ ）。",[560,561,562,563],{"key":20,"text":476,"correct":22},{"key":24,"text":472,"correct":22},{"key":28,"text":127,"correct":22},{"key":31,"text":564,"correct":26},"平行横挖法",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":24,"analysis":33},1129701,"链斗挖泥船的斗链运转速度与所挖土质有关，极软土的斗链运转速度为（ ）斗／min。",[569,571,573,575],{"key":20,"text":570,"correct":22},"21～24",{"key":24,"text":572,"correct":26},"25～28",{"key":28,"text":574,"correct":22},"29～32",{"key":31,"text":576,"correct":22},"33～36",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":20,"analysis":33},1129702,"当链斗式挖泥船不受挖槽宽度、挖槽边缘水深限制时链斗船宜采用（ ）施工。",[581,582,583,585],{"key":20,"text":476,"correct":26},{"key":24,"text":472,"correct":22},{"key":28,"text":584,"correct":22},"十字横挖法",{"key":31,"text":564,"correct":22},{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":28,"analysis":33},1129703,"抓斗式挖泥船施工作业时，当泥层厚度较薄，土质松软时可采用（ ）施工。",[590,592,594,596],{"key":20,"text":591,"correct":22},"横挖法",{"key":24,"text":593,"correct":22},"纵挖法",{"key":28,"text":595,"correct":26},"梅花法",{"key":31,"text":597,"correct":22},"十字法",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":28,"analysis":33},1129704,"抓斗式挖泥船开挖硬塑黏土时宜选用（ ）。",[602,604,606,608],{"key":20,"text":603,"correct":22},"带齿抓斗",{"key":24,"text":605,"correct":22},"轻型平口抓斗",{"key":28,"text":607,"correct":26},"重型全齿抓斗",{"key":31,"text":609,"correct":22},"中型抓斗",[611,614,617,620,623,626],{"id":15,"name":612,"category":7,"favorite":613},"领导干部任职前廉政法规知识测试题",92,{"id":615,"name":616,"category":7,"favorite":15},595,"建筑结构与设备",{"id":618,"name":619,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":621,"name":622,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":624,"name":625,"category":7,"favorite":8},534,"BIM工程师",{"id":627,"name":625,"category":7,"favorite":8},535]