[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-794-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":601},{"id":5,"name":6,"category":7,"favorite":8},794,"一建港口与航道工程实务","建筑工程",0,6,50,1132,[13,34,46,55,67,79,91,103,115,127,139,151,163,175,187,199,211,223,235,247,259,271,283,295,307,319,331,343,355,367,379,391,403,413,425,437,449,459,471,479,491,501,513,523,533,545,554,566,578,589],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1129444,1,"单选题","有抗冻性要求的混凝土必须掺入（ ），使其具有要求的含气量。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","抗冻剂",false,{"key":24,"text":25,"correct":26},"B","引气剂",true,{"key":28,"text":29,"correct":22},"C","早强剂",{"key":31,"text":32,"correct":22},"D","减水剂","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1129445,"港航工程混凝土的配制强度公式为：cu，o=cu，k=+1．645，式中cu，o为（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"混凝土的后期强度",{"key":24,"text":41,"correct":26},"混凝土的施工配制强度",{"key":28,"text":43,"correct":22},"混凝土的换算强度",{"key":31,"text":45,"correct":22},"设计要求的混凝土立方体抗压强度标准值",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1129446,"式中cu，k为（ ）。查看材料",[50,51,53,54],{"key":20,"text":39,"correct":22},{"key":24,"text":52,"correct":22},"混凝土的配制强度",{"key":28,"text":43,"correct":22},{"key":31,"text":45,"correct":26},{"id":56,"libraryId":5,"type":15,"typeLabel":16,"stem":57,"options":58,"answer":28,"analysis":33},1129447,"式中σ为混凝土的（ ）。查看材料",[59,61,63,65],{"key":20,"text":60,"correct":22},"立方体抗压强度统计值",{"key":24,"text":62,"correct":22},"立方体抗压强度离差统计值",{"key":28,"text":64,"correct":26},"立方体抗压强度标准差的实际统计值",{"key":31,"text":66,"correct":22},"强度离差系数",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":28,"analysis":33},1129448,"按该公式配制的混凝土，混凝土的施工配制强度不低于设计要求的混凝土立方体抗压强度标准值的保证率为（ ）。查看材料",[71,73,75,77],{"key":20,"text":72,"correct":22},"80％",{"key":24,"text":74,"correct":22},"90％",{"key":28,"text":76,"correct":26},"95％",{"key":31,"text":78,"correct":22},"100％",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":28,"analysis":33},1129449,"混凝土的可操作性，又称为混凝土的和易性，可以用混凝土的（ ）来表征。",[83,85,87,89],{"key":20,"text":84,"correct":22},"初凝时间",{"key":24,"text":86,"correct":22},"终凝时间",{"key":28,"text":88,"correct":26},"坍落度值",{"key":31,"text":90,"correct":22},"振捣时间",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":31,"analysis":33},1129450,"对于设计使用年限50年的工程，处于浪溅区、水位变动区和大气区的高性能预应力混凝土结构，其混凝土抗氯离子渗透性指标（电通量法）最高限值为（ ）。",[95,97,99,101],{"key":20,"text":96,"correct":22},"2000C",{"key":24,"text":98,"correct":22},"1200C",{"key":28,"text":100,"correct":22},"1000C",{"key":31,"text":102,"correct":26},"800C",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":28,"analysis":33},1129451,"混凝土抗氯离子渗透性指标（电通量法）试验用的混凝土试件，对掺入粉煤灰或粒化高炉矿渣粉的混凝土，应按标准养护条件下（ ）龄期的试验结果评定。",[107,109,111,113],{"key":20,"text":108,"correct":22},"14d",{"key":24,"text":110,"correct":22},"28d",{"key":28,"text":112,"correct":26},"56d",{"key":31,"text":114,"correct":22},"90d",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":28,"analysis":33},1129453,"港航工程大体积混凝土的开裂是由于（ ）造成的。",[119,121,123,125],{"key":20,"text":120,"correct":22},"承受的使用荷载过大",{"key":24,"text":122,"correct":22},"混凝土的膨胀",{"key":28,"text":124,"correct":26},"温度应力超过抗裂能力",{"key":31,"text":126,"correct":22},"变形过大",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":28,"analysis":33},1129455,"为防止大体积混凝土发生温度裂缝，要控制混凝土施工期间的内表温差。规范规定混凝土的内表温差不大于（ ）。",[131,133,135,137],{"key":20,"text":132,"correct":22},"30℃",{"key":24,"text":134,"correct":22},"28℃",{"key":28,"text":136,"correct":26},"25℃",{"key":31,"text":138,"correct":22},"20℃",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":20,"analysis":33},1129456,"全球卫星定位系统英文为：Navigation Satellite Time And Ranging／Global Positioning System，简称（ ）。",[143,145,147,149],{"key":20,"text":144,"correct":26},"GPS",{"key":24,"text":146,"correct":22},"DGPS",{"key":28,"text":148,"correct":22},"NST",{"key":31,"text":150,"correct":22},"NSTAR",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":20,"analysis":33},1129457,"GPS全球卫星定位系统是以卫星为基础的无线电导航定位系统，具有全能性、（ ）、全天候、连续性和实时性的导航、定位和定时的功能。",[155,157,159,161],{"key":20,"text":156,"correct":26},"全球性",{"key":24,"text":158,"correct":22},"区域性",{"key":28,"text":160,"correct":22},"地区性",{"key":31,"text":162,"correct":22},"局部地区",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":24,"analysis":33},1129458,"GPS全球卫星定位系统是以卫星为基础的无线电导航定位系统，能为各类用户提供精密的（ ）、速度和时间。",[167,169,171,173],{"key":20,"text":168,"correct":22},"平面坐标",{"key":24,"text":170,"correct":26},"三维坐标",{"key":28,"text":172,"correct":22},"高程",{"key":31,"text":174,"correct":22},"平面尺寸",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":28,"analysis":33},1129460,"我国规定以（ ）作为计算中国陆地海拔高度的起算面。",[179,181,183,185],{"key":20,"text":180,"correct":22},"当地平均海平面",{"key":24,"text":182,"correct":22},"海图深度基准面",{"key":28,"text":184,"correct":26},"黄海（青岛验潮站）平均海平面",{"key":31,"text":186,"correct":22},"东海平均海平面",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":24,"analysis":33},1129461,"工程勘察报告中应有根据岸线方向、主要地貌单元、地层的分布、地质构造线、建筑物轮廓线等确定的剖面位置，绘制（ ）。图上画有该剖面的岩土单元体的分布、地下水位、地质构造、标准贯入试验击数、静力触探曲线等。",[191,193,195,197],{"key":20,"text":192,"correct":22},"纵向工程地质剖面图",{"key":24,"text":194,"correct":26},"纵横工程地质剖面图",{"key":28,"text":196,"correct":22},"横向工程地质剖面图",{"key":31,"text":198,"correct":22},"特定方向上的地质剖面图",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":28,"analysis":33},1129462,"标准贯入试验击数Ⅳ值系指质量为63．5kg的锤，从（ ）的高度自由落下，将标准贯入器击人土中30cm时的锤击数。可根据标准贯入试验击数，结合当地经验确定砂土的密实度、砂土的内摩擦角和一般黏性土的无侧限抗压强度。",[203,205,207,209],{"key":20,"text":204,"correct":22},"36cm",{"key":24,"text":206,"correct":22},"56cm",{"key":28,"text":208,"correct":26},"76cm",{"key":31,"text":210,"correct":22},"96cm",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},1129463,"我国北方港口与航道工程有抗冻性要求的混凝土不宜采用（ ）水泥。",[215,217,219,221],{"key":20,"text":216,"correct":22},"硅酸盐",{"key":24,"text":218,"correct":26},"火山灰质硅酸盐",{"key":28,"text":220,"correct":22},"粉煤灰硅酸盐",{"key":31,"text":222,"correct":22},"普通硅酸盐",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":28,"analysis":33},1129464,"某海港码头泊位码头顶面高程为+3．0m，设计高水位+1．2m，某浪溅区上界为（ ）。",[227,229,231,233],{"key":20,"text":228,"correct":22},"+2．2m",{"key":24,"text":230,"correct":22},"+2．7m",{"key":28,"text":232,"correct":26},"+3．0m",{"key":31,"text":234,"correct":22},"+3．5m",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":28,"analysis":33},1129465,"港航工程海水环境预应力混凝土中氯离子的最高限值（ ）为0．06。",[239,241,243,245],{"key":20,"text":240,"correct":22},"按混凝土重量的％计",{"key":24,"text":242,"correct":22},"按骨料重量的％计",{"key":28,"text":244,"correct":26},"按水泥重量的％计",{"key":31,"text":246,"correct":22},"按拌合水重量的％计",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":20,"analysis":33},1129470,"航道整治工程应根据国家相关规定，针对（ ）制定生产安全事故和突发事件应急预案。",[251,253,255,257],{"key":20,"text":252,"correct":26},"工程特点",{"key":24,"text":254,"correct":22},"工程类别",{"key":28,"text":256,"correct":22},"工程规模",{"key":31,"text":258,"correct":22},"工程阶段",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":20,"analysis":33},1129473,"《港口建设管理规定》第二十九条规定拆迁工作（ ）时，港口建设项目可以开工。",[263,265,267,269],{"key":20,"text":264,"correct":26},"基本完成",{"key":24,"text":266,"correct":22},"全部完成",{"key":28,"text":268,"correct":22},"开始实施",{"key":31,"text":270,"correct":22},"实施中",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":28,"analysis":33},1129488,"码头接岸结构及岸坡在施工期和使用期整体稳定性验算应符合下列规定：可冲刷河段或海岸建造高桩码头尚应考虑（ ）对岸坡稳定的影响。",[275,277,279,281],{"key":20,"text":276,"correct":22},"水位上升",{"key":24,"text":278,"correct":22},"水位骤降",{"key":28,"text":280,"correct":26},"冲刷",{"key":31,"text":282,"correct":22},"雨期",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":20,"analysis":33},1129496,"码头前沿安全地带以外的泊位水域（ ）。",[287,289,291,293],{"key":20,"text":288,"correct":26},"严禁存在浅点",{"key":24,"text":290,"correct":22},"允许有不超过检查点总数5％的浅点",{"key":28,"text":292,"correct":22},"允许有不超过10cm的浅点",{"key":31,"text":294,"correct":22},"允许有不超过检查点总数10％的浅点",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":24,"analysis":33},1129498,"工程量清单计价由（ ）编制。",[299,301,303,305],{"key":20,"text":300,"correct":22},"投标人",{"key":24,"text":302,"correct":26},"招标人",{"key":28,"text":304,"correct":22},"水运工程定额站",{"key":31,"text":306,"correct":22},"质量监督部门",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":31,"analysis":33},1129500,"（ ）为工程师不予计量的项目。",[311,313,315,317],{"key":20,"text":312,"correct":22},"工程量清单中的全部项目",{"key":24,"text":314,"correct":22},"合同文件中规定的项目",{"key":28,"text":316,"correct":22},"工程变更项目",{"key":31,"text":318,"correct":26},"施工单位超出设计图纸范围和因施工单位原因造成返工的工程量",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":24,"analysis":33},1129512,"水上交通较大事故，指造成3人以上10人以下死亡（含失踪）的，或者10人以上50人以下重伤的，或者船舶溢油（ ）致水域污染的，或者1000万以上5000万元以下直接经济损失的事故。",[323,325,327,329],{"key":20,"text":324,"correct":22},"50t以上100t以下",{"key":24,"text":326,"correct":26},"100t以上500t以下",{"key":28,"text":328,"correct":22},"500t以上800t以下",{"key":31,"text":330,"correct":22},"500t以上1000t以下",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":31,"analysis":33},1129513,"伤亡事故处理工作应当在90天内结案，特殊情况不得超过（ ）天。",[335,337,339,341],{"key":20,"text":336,"correct":22},"90",{"key":24,"text":338,"correct":22},"100",{"key":28,"text":340,"correct":22},"120",{"key":31,"text":342,"correct":26},"180",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":28,"analysis":33},1129517,"水上水下工程施工作业前，必须按规定申报办理有关许可证书，并办理（ ）等有关手续。",[347,349,351,353],{"key":20,"text":348,"correct":22},"水上水下施工通告",{"key":24,"text":350,"correct":22},"沉桩水上作业通告",{"key":28,"text":352,"correct":26},"航行通告",{"key":31,"text":354,"correct":22},"挖泥水下作业通告",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":28,"analysis":33},1129518,"严禁租用（ ）参与水上水下施工作业。",[359,361,363,365],{"key":20,"text":360,"correct":22},"驳船",{"key":24,"text":362,"correct":22},"渔船",{"key":28,"text":364,"correct":26},"三无船舶",{"key":31,"text":366,"correct":22},"运输船舶",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":24,"analysis":33},1129521,"编制水上工程施工组织设计的同时，必须制定工程船舶施工（ ），并报上级主管部门审核批准。",[371,373,375,377],{"key":20,"text":372,"correct":22},"防风防台方案",{"key":24,"text":374,"correct":26},"安全技术措施",{"key":28,"text":376,"correct":22},"防护性措施",{"key":31,"text":378,"correct":22},"防风抗浪方案",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":31,"analysis":33},1129539,"通航安全水上水下施工作业管理的主管机关是（ ）。",[383,385,387,389],{"key":20,"text":384,"correct":22},"中华人民共和国建设部",{"key":24,"text":386,"correct":22},"中华人民共和国渔业部",{"key":28,"text":388,"correct":22},"中华人民共和国海洋局",{"key":31,"text":390,"correct":26},"中华人民共和国海事局",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":20,"analysis":33},1129547,"投标人在投标截止时间之前撤回已提交投标文件的，招标人应当自收到投标人书面撤回通知之日起（ ）日内退还已收取的投标保证金。",[395,397,399,401],{"key":20,"text":396,"correct":26},"5",{"key":24,"text":398,"correct":22},"7",{"key":28,"text":400,"correct":22},"10",{"key":31,"text":402,"correct":22},"15",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":20,"analysis":33},1129554,"担保有效期内，担保方在收到发包方以书面形式提出的在担保金额内的赔偿要求后，在（ ）内无条件支付。",[407,409,410,411],{"key":20,"text":408,"correct":26},"7d",{"key":24,"text":108,"correct":22},{"key":28,"text":110,"correct":22},{"key":31,"text":412,"correct":22},"30d",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":24,"analysis":33},1129558,"水运工程建设用地、水域的征用应由（ ）负责办理。",[417,419,421,423],{"key":20,"text":418,"correct":22},"施工单位",{"key":24,"text":420,"correct":26},"建设单位",{"key":28,"text":422,"correct":22},"施工单位与建设单位共同",{"key":31,"text":424,"correct":22},"施工单位与政府有关部门",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":28,"analysis":33},1129572,"港口与航道工程项目技术管理的任务中，不包括（ ）。",[429,431,433,435],{"key":20,"text":430,"correct":22},"促进项目技术发展",{"key":24,"text":432,"correct":22},"建立良好的技术秩序",{"key":28,"text":434,"correct":26},"直接、及时向业主报送施工组织设计",{"key":31,"text":436,"correct":22},"保证生产过程符合规范要求",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":20,"analysis":33},1129598,"概算经批准后，是建设项目投资的（ ）。",[441,443,445,447],{"key":20,"text":442,"correct":26},"最高限额",{"key":24,"text":444,"correct":22},"最低限额",{"key":28,"text":446,"correct":22},"全部费用",{"key":31,"text":448,"correct":22},"部分费用",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":28,"analysis":33},1129599,"施工图预算（以下简称预算）由（ ）负责编制或委托有资格的造价咨询公司编制。",[453,454,455,457],{"key":20,"text":420,"correct":22},{"key":24,"text":418,"correct":22},{"key":28,"text":456,"correct":26},"设计单位",{"key":31,"text":458,"correct":22},"监理单位",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":20,"analysis":33},1129600,"编制疏浚工程概算、预算工程费时，其企业管理费的计费基数是（ ）。",[463,465,467,469],{"key":20,"text":464,"correct":26},"直接工程费",{"key":24,"text":466,"correct":22},"现场管理费",{"key":28,"text":468,"correct":22},"定额直接费",{"key":31,"text":470,"correct":22},"其他直接费",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":24,"analysis":33},1129601,"概算由（ ）负责编制。",[475,476,477,478],{"key":20,"text":420,"correct":22},{"key":24,"text":456,"correct":26},{"key":28,"text":418,"correct":22},{"key":31,"text":458,"correct":22},{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":24,"analysis":33},1129602,"如概算超过投资估算，则必须分析原因或修改设计，经修改后仍超过投资估算（ ）以上时，应重新上报可行性研究报告。",[483,485,487,489],{"key":20,"text":484,"correct":22},"8％",{"key":24,"text":486,"correct":26},"10％",{"key":28,"text":488,"correct":22},"12％",{"key":31,"text":490,"correct":22},"15％",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":31,"analysis":33},1129603,"使用国外贷款的建设项目，应依据规定分别编制人民币和外币概算。其中：施工取费的计算，以（ ）为取费基础。",[495,496,497,499],{"key":20,"text":464,"correct":22},{"key":24,"text":468,"correct":22},{"key":28,"text":498,"correct":22},"直接费",{"key":31,"text":500,"correct":26},"基价定额直接费",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":28,"analysis":33},1129607,"项目进度控制机构应以（ ）为责任主体。",[505,507,509,511],{"key":20,"text":506,"correct":22},"项目总工程师",{"key":24,"text":508,"correct":22},"分管进度计划的项目副经理",{"key":28,"text":510,"correct":26},"项目经理",{"key":31,"text":512,"correct":22},"子项目负责人",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":28,"analysis":33},1129621,"观感质量检查，评为二级的项目，允许少量测点的偏差超过允许的偏差值，但超过允许值的测点数不超过总测点数的（ ）。",[517,518,519,521],{"key":20,"text":486,"correct":22},{"key":24,"text":490,"correct":22},{"key":28,"text":520,"correct":26},"20％",{"key":31,"text":522,"correct":22},"5％",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":28,"analysis":33},1129624,"检验批的质量由施工单位组织自检合格后应报（ ）。",[527,528,530,531],{"key":20,"text":420,"correct":22},{"key":24,"text":529,"correct":22},"质量监督单位",{"key":28,"text":458,"correct":26},{"key":31,"text":532,"correct":22},"企业质量部门",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":20,"analysis":33},1129646,"应用内河航运水工建筑工程定额时，编制施工图预算可（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":26},"直接使用",{"key":24,"text":540,"correct":22},"各项加扩大系数后使用",{"key":28,"text":542,"correct":22},"算出定额直接费后加扩大系数",{"key":31,"text":544,"correct":22},"各项加大3％后使用",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":28,"analysis":33},1129647,"应用内河航运水工建筑工程定额时，编制概算时可（ ）。",[549,550,551,553],{"key":20,"text":538,"correct":22},{"key":24,"text":540,"correct":22},{"key":28,"text":552,"correct":26},"套用定额算出定额直接费后加扩大系数",{"key":31,"text":544,"correct":22},{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":24,"analysis":33},1129648,"编制概算时，应用本定额算出定额直接费和基价定额直接费后（ ）。",[558,560,562,564],{"key":20,"text":559,"correct":22},"即可应用",{"key":24,"text":561,"correct":26},"乘以扩大系数",{"key":28,"text":563,"correct":22},"乘以折减系数",{"key":31,"text":565,"correct":22},"分不同情况分别乘以系数",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":28,"analysis":33},1129649,"沿海水工工程在编制概算时需在套用《沿海港口水工建筑工程定额》计算出定额直接费、基价定额直接费后加乘扩大系数，直立式防波堤取（ ）。",[570,572,574,576],{"key":20,"text":571,"correct":22},"1．01～1．03",{"key":24,"text":573,"correct":22},"1．02～1．04",{"key":28,"text":575,"correct":26},"1．02～1．05",{"key":31,"text":577,"correct":22},"1．03～1．05",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":31,"analysis":33},1129650,"定额直接费低于300万元的一般水工建筑项目，应计列小型工程增加费，按定额直接费和施工取费之和的（ ）计算。",[582,584,586,588],{"key":20,"text":583,"correct":22},"2％",{"key":24,"text":585,"correct":22},"3％",{"key":28,"text":587,"correct":22},"4％",{"key":31,"text":522,"correct":26},{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":24,"analysis":33},1129651,"应用港口与航道工程定额时，工程量的计算根据（ ）进行。",[593,595,597,599],{"key":20,"text":594,"correct":22},"实测值",{"key":24,"text":596,"correct":26},"施工图",{"key":28,"text":598,"correct":22},"初步设计",{"key":31,"text":600,"correct":22},"初步设计调整值",[602,605,608,611,614,617],{"id":15,"name":603,"category":7,"favorite":604},"领导干部任职前廉政法规知识测试题",92,{"id":606,"name":607,"category":7,"favorite":15},595,"建筑结构与设备",{"id":609,"name":610,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":612,"name":613,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":615,"name":616,"category":7,"favorite":8},534,"BIM工程师",{"id":618,"name":616,"category":7,"favorite":8},535]