[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-794-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":607},{"id":5,"name":6,"category":7,"favorite":8},794,"一建港口与航道工程实务","建筑工程",0,3,50,1132,[13,34,42,54,66,78,90,102,114,126,138,150,162,174,186,198,210,218,230,241,253,265,277,289,301,313,325,337,349,361,373,385,397,407,417,429,441,453,465,477,489,501,513,525,537,547,559,571,583,595],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1129260,1,"单选题","混凝土预制构件叠合板的堆放层数应不超过（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","二层",false,{"key":24,"text":25,"correct":22},"B","三层",{"key":27,"text":28,"correct":22},"C","四层",{"key":30,"text":31,"correct":32},"D","五层",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1129261,"混凝土预制构件桁架的堆放层数应不超过（ ）。",[38,39,40,41],{"key":20,"text":21,"correct":32},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":22},{"key":30,"text":31,"correct":22},{"id":43,"libraryId":5,"type":15,"typeLabel":16,"stem":44,"options":45,"answer":20,"analysis":33},1129262,"港口与航道工程中高桩码头工程预制构件安装时，搁置面要平整，预制构件与搁置面间应（ ）。",[46,48,50,52],{"key":20,"text":47,"correct":32},"接触紧密",{"key":24,"text":49,"correct":22},"留有空隙",{"key":27,"text":51,"correct":22},"有5mm空隙",{"key":30,"text":53,"correct":22},"有10mm空隙",{"id":55,"libraryId":5,"type":15,"typeLabel":16,"stem":56,"options":57,"answer":27,"analysis":33},1129263,"港口与航道工程中高桩码头工程预制构件安装时，当露出的钢筋影响安装时，对此钢筋（ ）。",[58,60,62,64],{"key":20,"text":59,"correct":22},"不影响构件受力的，可随意割除",{"key":24,"text":61,"correct":22},"影响构件受力的，不可随意割除",{"key":27,"text":63,"correct":32},"不得随意割除，并应及时与设计单位研究解决",{"key":30,"text":65,"correct":22},"不得随意割除，可与监理、业主代表研究解决",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":20,"analysis":33},1129264,"港口与航道工程中高桩码头工程预制构件安装时，应（ ）标高。",[70,72,74,76],{"key":20,"text":71,"correct":32},"逐层控制",{"key":24,"text":73,"correct":22},"整体控制",{"key":27,"text":75,"correct":22},"逐件控制",{"key":30,"text":77,"correct":22},"总体控制",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":20,"analysis":33},1129266,"高桩码头构件安装时，主要应控制（ ）。",[82,84,86,88],{"key":20,"text":83,"correct":32},"逐层的标高",{"key":24,"text":85,"correct":22},"桩帽的标高",{"key":27,"text":87,"correct":22},"最终的标高",{"key":30,"text":89,"correct":22},"梁板的标高",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":27,"analysis":33},1129268,"浇筑的混凝土强度达到5MPa前，锤击沉桩处与该部分混凝土之间的距离不得小于（ ）。",[94,96,98,100],{"key":20,"text":95,"correct":22},"20m",{"key":24,"text":97,"correct":22},"25m",{"key":27,"text":99,"correct":32},"30m",{"key":30,"text":101,"correct":22},"50m",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":24,"analysis":33},1129269,"高桩码头沉桩后对岸坡进行回填或抛石施工前，如遇异常情况，如大风暴、特大潮等过后，必须（ ）。",[106,108,110,112],{"key":20,"text":107,"correct":22},"加速抛填施工",{"key":24,"text":109,"correct":32},"及时施测回淤，必要时再次清淤",{"key":27,"text":111,"correct":22},"进行夹桩",{"key":30,"text":113,"correct":22},"作好施工记录",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":20,"analysis":33},1129271,"斜坡堤堤心石爆破排淤填石是在抛石体外缘一定距离和深度的（ ）埋放药包群，起爆瞬间在淤泥中形成空腔，抛石体随即坍塌充填空腔形成“石舌”，达到置换淤泥的目的。",[118,120,122,124],{"key":20,"text":119,"correct":32},"淤泥质软基中",{"key":24,"text":121,"correct":22},"淤泥质软基表面",{"key":27,"text":123,"correct":22},"抛石体底部表面",{"key":30,"text":125,"correct":22},"抛石体底部中",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":27,"analysis":33},1129272,"检查爆破挤淤置换淤泥质软基平面位置及深度的探地雷达法适用于（ ）。",[130,132,134,136],{"key":20,"text":131,"correct":22},"工作量小的工程",{"key":24,"text":133,"correct":22},"流失量小的工程",{"key":27,"text":135,"correct":32},"工作量大的工程",{"key":30,"text":137,"correct":22},"流失量大的工程",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":27,"analysis":33},1129273,"检查斜坡堤置换淤泥质软基的平面位置及深度的体积平衡法适用于具备抛填计量条件的（ ）工程。",[142,144,146,148],{"key":20,"text":143,"correct":22},"一般",{"key":24,"text":145,"correct":22},"工作量大的一般",{"key":27,"text":147,"correct":32},"抛填石料流失量较小的",{"key":30,"text":149,"correct":22},"特殊",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":24,"analysis":33},1129274,"用钻孔探摸法揭示抛填体厚度，钻孔深度应（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":22},"到达抛填层底",{"key":24,"text":157,"correct":32},"深入下卧层不少于2m",{"key":27,"text":159,"correct":22},"深入下卧层不少于1m",{"key":30,"text":161,"correct":22},"深入下卧层不少于3m",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":27,"analysis":33},1129275,"斜坡堤堤心石抛石时，抛填方块前应先安放压边方块。实际边线与设计边线间的偏差不应大于（ ）。",[166,168,170,172],{"key":20,"text":167,"correct":22},"100mm",{"key":24,"text":169,"correct":22},"200mm",{"key":27,"text":171,"correct":32},"300mm",{"key":30,"text":173,"correct":22},"500mm",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":27,"analysis":33},1129276,"斜坡堤预制人工块体重量的允许偏差为（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":22},"±1％",{"key":24,"text":181,"correct":22},"±3％",{"key":27,"text":183,"correct":32},"±5％",{"key":30,"text":185,"correct":22},"±8％",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":30,"analysis":33},1129277,"斜坡堤人工块体应（ ）安放，底部的块体应与水下棱体接触紧密。",[190,192,194,196],{"key":20,"text":191,"correct":22},"自一端向另一端",{"key":24,"text":193,"correct":22},"分段自两端向中间",{"key":27,"text":195,"correct":22},"分段由中间向两端",{"key":30,"text":197,"correct":32},"自下而上",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":27,"analysis":33},1129278,"斜坡堤扭工字块护面块体采用定点随机安放时，可先按设计块数的（ ）计算网点的位置进行安放，完成后应进行检查或补漏。",[202,204,206,208],{"key":20,"text":203,"correct":22},"85％",{"key":24,"text":205,"correct":22},"90％",{"key":27,"text":207,"correct":32},"95％",{"key":30,"text":209,"correct":22},"98％",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":27,"analysis":33},1129280,"斜坡堤扭工字块和四脚锥体，其安放的数量与设计的数量的允许偏差为（ ）。",[214,215,216,217],{"key":20,"text":179,"correct":22},{"key":24,"text":181,"correct":22},{"key":27,"text":183,"correct":32},{"key":30,"text":185,"correct":22},{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":24,"analysis":33},1129281,"堤心石坡面验收后，应按设计要求抛填块石垫层，其作用是（ ）。",[222,224,226,228],{"key":20,"text":223,"correct":22},"倒滤层",{"key":24,"text":225,"correct":32},"找平",{"key":27,"text":227,"correct":22},"增密堤心石",{"key":30,"text":229,"correct":22},"加大堤心断面",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":27,"analysis":33},1129282,"斜坡堤四脚空心方块和栅栏板护面块体的安放，其相邻块体的高差不应大于（ ）。",[234,236,237,239],{"key":20,"text":235,"correct":22},"80mm",{"key":24,"text":167,"correct":22},{"key":27,"text":238,"correct":32},"150mm",{"key":30,"text":240,"correct":22},"180mm",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":30,"analysis":33},1129284,"围堰施工应在（ ）后实施。",[245,247,249,251],{"key":20,"text":246,"correct":22},"陆域地形测量完成",{"key":24,"text":248,"correct":22},"典型施工完成",{"key":27,"text":250,"correct":22},"借土区落实",{"key":30,"text":252,"correct":32},"基坑施工方案批准",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":30,"analysis":33},1129285,"计算基坑无支护径流排水量时，可取当地近的降水强度是（ ）（m／h）。",[257,259,261,263],{"key":20,"text":258,"correct":22},"2年一遇日最大降水量",{"key":24,"text":260,"correct":22},"2年一遇日最大降水量的1／2",{"key":27,"text":262,"correct":22},"5年一遇日最大降水量",{"key":30,"text":264,"correct":32},"5年一遇日最大降水量的1／2",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":27,"analysis":33},1129286,"对于有槽、隙的建基面，应清理槽、隙内填充物，其清理深度宜为沟槽宽度的（ ）倍。",[269,271,273,275],{"key":20,"text":270,"correct":22},"0．5～1．0",{"key":24,"text":272,"correct":22},"1．0～1．5",{"key":27,"text":274,"correct":32},"1．5～2．0",{"key":30,"text":276,"correct":22},"2．0～2．5",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":24,"analysis":33},1129287,"对溶隙、溶槽、溶洞、断层等不良地层进行固结灌浆加固与封闭处理时，设计规定压力下灌段吸浆量和持续时间指标是结束灌浆的标准，这一标准是（ ）。",[281,283,285,287],{"key":20,"text":282,"correct":22},"小于0．4L／min持续20min",{"key":24,"text":284,"correct":32},"小于0.4L／min持续30min",{"key":27,"text":286,"correct":22},"大于0.4L／min持续20min",{"key":30,"text":288,"correct":22},"大于0．4L／min持续30min",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":20,"analysis":33},1129289,"耙吸挖泥船开挖硬黏土宜选用的耙头是（ ）。",[293,295,297,299],{"key":20,"text":294,"correct":32},"主动挖掘型耙头",{"key":24,"text":296,"correct":22},"挖掘型耙头",{"key":27,"text":298,"correct":22},"吸人型耙头",{"key":30,"text":300,"correct":22},"冲刷型耙头",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":24,"analysis":33},1129290,"耙吸挖泥船开挖黏性土选用耙头的耙齿是（ ）。",[305,307,309,311],{"key":20,"text":306,"correct":22},"尖齿",{"key":24,"text":308,"correct":32},"扁齿",{"key":27,"text":310,"correct":22},"方齿",{"key":30,"text":312,"correct":22},"凿齿",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":20,"analysis":33},1129291,"耙头是耙吸挖泥船的主要疏浚设备，施工中耙头应根据（ ）选用合适的耙头。",[317,319,321,323],{"key":20,"text":318,"correct":32},"土质",{"key":24,"text":320,"correct":22},"水深",{"key":27,"text":322,"correct":22},"流速",{"key":30,"text":324,"correct":22},"波浪",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":24,"analysis":33},1129292,"重力式码头预制沉箱的接高，采取（ ）接高，所需费用高，一般适用于所需接高沉箱数量多、风浪大、地基条件好和水深适当的情况。",[329,331,333,335],{"key":20,"text":330,"correct":22},"漂浮",{"key":24,"text":332,"correct":32},"座底",{"key":27,"text":334,"correct":22},"半潜",{"key":30,"text":336,"correct":22},"固定",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":24,"analysis":33},1129293,"重力式码头墙后回填时，为防止淤泥对码头的影响，其回填方向应（ ）方向填筑。",[341,343,345,347],{"key":20,"text":342,"correct":22},"由岸往墙后",{"key":24,"text":344,"correct":32},"由墙后往岸",{"key":27,"text":346,"correct":22},"由一端向另一端",{"key":30,"text":348,"correct":22},"由一角向另一角",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":27,"analysis":33},1129294,"采用无纺土工织物作重力式码头后方倒滤层材料时，其抗拉强度不宜低于（ ）kN／m。",[353,355,357,359],{"key":20,"text":354,"correct":22},"3",{"key":24,"text":356,"correct":22},"5",{"key":27,"text":358,"correct":32},"6",{"key":30,"text":360,"correct":22},"8",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":27,"analysis":33},1129295,"抛枕施工时宜采用（ ），均匀抛投、分层实施。",[365,367,369,371],{"key":20,"text":366,"correct":22},"断面法",{"key":24,"text":368,"correct":22},"平均水深法",{"key":27,"text":370,"correct":32},"网格法",{"key":30,"text":372,"correct":22},"三角网法",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":30,"analysis":33},1129297,"采用石灰岩碎石配置C50混凝土时，石灰岩岩石立方体抗压强度需大于等于（ ）MPa。",[377,379,381,383],{"key":20,"text":378,"correct":22},"60",{"key":24,"text":380,"correct":22},"70",{"key":27,"text":382,"correct":22},"75",{"key":30,"text":384,"correct":32},"80",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":20,"analysis":33},1129298,"无论混凝土是否有抗冻要求，对粗骨料所含杂质和缺陷颗粒限值相同的是（ ）。",[389,391,393,395],{"key":20,"text":390,"correct":32},"针片状颗粒含量",{"key":24,"text":392,"correct":22},"含泥量",{"key":27,"text":394,"correct":22},"软弱颗粒含量",{"key":30,"text":396,"correct":22},"水溶性硫酸盐及硫化物",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":27,"analysis":33},1129300,"排水固结法处理地基，当采用φ70mm袋装砂井和塑料排水板作为竖向通道时，其设计间距一般在（ ）m左右。",[401,403,404,406],{"key":20,"text":402,"correct":22},"0．3～0．6",{"key":24,"text":270,"correct":22},{"key":27,"text":405,"correct":32},"0．7～1．3",{"key":30,"text":272,"correct":22},{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":27,"analysis":33},1129301,"排水固结法处理地基，当采用φ7cm袋装砂井和塑料排水板作为竖向通道时，竖向排水通道长度主要取决于工程要求和土层情况，对以地基稳定性控制的工程，竖向排水通道深度至少应超过最危险滑动面（ ）m。",[411,413,414,416],{"key":20,"text":412,"correct":22},"1",{"key":24,"text":356,"correct":22},{"key":27,"text":415,"correct":32},"2",{"key":30,"text":354,"correct":22},{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":27,"analysis":33},1129302,"采用普通硅酸盐水泥拌制大体积混凝土时，宜掺入粉煤灰、粒化高炉矿渣粉等（ ）掺合料。",[421,423,425,427],{"key":20,"text":422,"correct":22},"碱性",{"key":24,"text":424,"correct":22},"酸性",{"key":27,"text":426,"correct":32},"活性",{"key":30,"text":428,"correct":22},"惰性",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":24,"analysis":33},1129304,"堆载预压法是利用软黏土在外荷载作用下排水压密，卸载后土的密度（ ）的特性，对软土地基进行预压加固处理的一种物理加固方法。",[433,435,437,439],{"key":20,"text":434,"correct":22},"变小",{"key":24,"text":436,"correct":32},"基本维持不变",{"key":27,"text":438,"correct":22},"变大",{"key":30,"text":440,"correct":22},"恢复到加固前状态",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":20,"analysis":33},1129305,"堆载预压工程在堆载过程中应每天进行沉降、位移、孔隙水等观测，对设置竖向排水体的地基、基底中心沉降每昼夜应小于（ ）。",[445,447,449,451],{"key":20,"text":446,"correct":32},"10mm",{"key":24,"text":448,"correct":22},"15mm",{"key":27,"text":450,"correct":22},"20mm",{"key":30,"text":452,"correct":22},"30mm",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":24,"analysis":33},1129307,"土工织物的隔离作用是指（ ）。",[457,459,461,463],{"key":20,"text":458,"correct":22},"把土体与水、气隔离开来",{"key":24,"text":460,"correct":32},"把不同粒径的土、砂、石或把土、砂、石与地基（或与建筑物）隔离开来",{"key":27,"text":462,"correct":22},"把水与建筑物隔离开来",{"key":30,"text":464,"correct":22},"把大气与基础隔离开来",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":24,"analysis":33},1129308,"港航工程预应力混凝土结构常用钢丝钢绞线的伸长率范围为（ ）。",[469,471,473,475],{"key":20,"text":470,"correct":22},"10％～20％",{"key":24,"text":472,"correct":32},"3％～5％",{"key":27,"text":474,"correct":22},"8％～10％",{"key":30,"text":476,"correct":22},"25％以上",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":24,"analysis":33},1129310,"排水固结法的实质是在建筑物或构筑物建造前，先在拟建场地上施加或分级施加与其相当的荷载，使土体中孔隙水排出，孔隙体积变小，土体密实，以增长土体的（ ），提高软基的承载力和稳定性，同时可消除沉降量，减小土体的压缩性，以便使工程安全顺利地建造，在使用期不致产生有害的沉降和沉降差。",[481,483,485,487],{"key":20,"text":482,"correct":22},"均匀性",{"key":24,"text":484,"correct":32},"抗剪强度",{"key":27,"text":486,"correct":22},"变形性能",{"key":30,"text":488,"correct":22},"压缩性",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":24,"analysis":33},1129311,"粗直径钢筋机械连接中，可靠性最优的是（ ）。",[493,495,497,499],{"key":20,"text":494,"correct":22},"套筒冷挤压连接",{"key":24,"text":496,"correct":32},"滚压直螺纹连接",{"key":27,"text":498,"correct":22},"锥螺纹连接",{"key":30,"text":500,"correct":22},"镦粗直螺纹连接",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":27,"analysis":33},1129312,"对混凝土的水化热温升有明显影响的外加剂是（ ）。",[505,507,509,511],{"key":20,"text":506,"correct":22},"减水剂",{"key":24,"text":508,"correct":22},"引气剂",{"key":27,"text":510,"correct":32},"缓凝剂",{"key":30,"text":512,"correct":22},"防冻剂",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":30,"analysis":33},1129315,"港口与航道工程地质勘察必须贯彻国家有关技术经济政策，认真调查研究，精心勘察，密切结合工程实际，具体分析和评价场地的工程地质条件，提出反映客观实际、满足（ ）的勘察成果，为港口和航道工程建设的全过程服务。",[517,519,521,523],{"key":20,"text":518,"correct":22},"建设单位要求",{"key":24,"text":520,"correct":22},"设计单位要求",{"key":27,"text":522,"correct":22},"施工单位要求",{"key":30,"text":524,"correct":32},"工程需要",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":30,"analysis":33},1129316,"液限是指由（ ）的界限含水量，用于计算塑性指数和液性指数。",[529,531,533,535],{"key":20,"text":530,"correct":22},"可塑状态转为半固体状态",{"key":24,"text":532,"correct":22},"流动状态变成半固体状态",{"key":27,"text":534,"correct":22},"可塑状态转为固体状态",{"key":30,"text":536,"correct":32},"流动状态变成可塑状态",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":24,"analysis":33},1129317,"保证混凝土的抗冻性，在搅拌混凝土时，必须掺加（ ），以保证混凝土达到要求的含气量。",[541,543,544,546],{"key":20,"text":542,"correct":22},"早强剂",{"key":24,"text":508,"correct":32},{"key":27,"text":545,"correct":22},"微膨胀剂",{"key":30,"text":510,"correct":22},{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":20,"analysis":33},1129318,"我国规定以（ ）为海图深度基准面，亦为潮位基准面。",[551,553,555,557],{"key":20,"text":552,"correct":32},"理论最低潮位",{"key":24,"text":554,"correct":22},"理论最高潮位",{"key":27,"text":556,"correct":22},"大潮平均高潮位",{"key":30,"text":558,"correct":22},"平均高潮位",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":24,"analysis":33},1129319,"施工船舶在未来12h以内，遭遇风力可能达到（ ）以上，则称“在台风严重威胁中”。",[563,565,567,569],{"key":20,"text":564,"correct":22},"5级",{"key":24,"text":566,"correct":32},"6级",{"key":27,"text":568,"correct":22},"7级",{"key":30,"text":570,"correct":22},"8级",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":27,"analysis":33},1129323,"从时间上或空间上来看，在构成波浪的波列中波形不同、波要素呈随机分布，这种波浪通称为（ ）。",[575,577,579,581],{"key":20,"text":576,"correct":22},"随机波",{"key":24,"text":578,"correct":22},"规则波",{"key":27,"text":580,"correct":32},"不规则波",{"key":30,"text":582,"correct":22},"涌浪",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":24,"analysis":33},1129324,"海浪连续记录中，波高总个数的（ ）个大波的波高平均值为有效波高。",[587,589,591,593],{"key":20,"text":588,"correct":22},"1／2",{"key":24,"text":590,"correct":32},"1／3",{"key":27,"text":592,"correct":22},"1／4",{"key":30,"text":594,"correct":22},"1／5",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":30,"analysis":33},1129325,"某规则波，波速为1．0m／s，过上跨零点和相邻下跨零点的经时为2s，该规则波的波长是（ ）。",[599,601,603,605],{"key":20,"text":600,"correct":22},"1m",{"key":24,"text":602,"correct":22},"2m",{"key":27,"text":604,"correct":22},"3m",{"key":30,"text":606,"correct":32},"4m",[608,611,614,617,620,623],{"id":15,"name":609,"category":7,"favorite":610},"领导干部任职前廉政法规知识测试题",92,{"id":612,"name":613,"category":7,"favorite":15},595,"建筑结构与设备",{"id":615,"name":616,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":618,"name":619,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":621,"name":622,"category":7,"favorite":8},534,"BIM工程师",{"id":624,"name":622,"category":7,"favorite":8},535]