[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-794-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":468},{"id":5,"name":6,"category":7,"favorite":8},794,"一建港口与航道工程实务","建筑工程",0,23,50,1132,[13,38,53,67,82,97,111,126,141,156,167,181,196,211,226,240,250,259,271,286,300,315,329,343,357,371,385,400,415,430,444,458],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1130690,2,"多选题","对施工进度计划的内容检查后，应提出月度施工进度报告，报告应包括下列内容（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","进度执行情况的综合叙述",true,{"key":24,"text":25,"correct":26},"B","向监理工程师提出报告",false,{"key":28,"text":29,"correct":22},"C","进度偏差及原因分析",{"key":31,"text":32,"correct":22},"D","解决问题的措施及计划调整意见",{"key":34,"text":35,"correct":22},"E","实际的施工进度图","ACDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1130691,"施工总进度计划的编制依据包括（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"项目的工程承包合同",{"key":24,"text":45,"correct":22},"项目的施工组织设计",{"key":28,"text":47,"correct":22},"设计的进度计划",{"key":31,"text":49,"correct":26},"企业的效益情况",{"key":34,"text":51,"correct":26},"政府的监督意见","ABC",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":52,"analysis":37},1130692,"检查工程进度计划完成情况常用的统计方法有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"工程形象进度统计法",{"key":24,"text":60,"correct":22},"实物工程量统计法",{"key":28,"text":62,"correct":22},"施工产值统计法",{"key":31,"text":64,"correct":26},"投入产出比统计法",{"key":34,"text":66,"correct":26},"劳动生产率统计法",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1130693,"港航工程中实际进度与计划进度相比较常用的方法有（ ）。",[71,73,75,77,79],{"key":20,"text":72,"correct":22},"横道图比较法",{"key":24,"text":74,"correct":22},"列表比较法",{"key":28,"text":76,"correct":26},"产值效益比较法",{"key":31,"text":78,"correct":26},"资金周转率比较法",{"key":34,"text":80,"correct":22},"前锋线网络计划比较法","ABE",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1130694,"疏浚与吹填工程单位工程质量控制资料核查记录包括（ ）等记录。",[86,88,90,92,94],{"key":20,"text":87,"correct":26},"隐蔽工程验收记录",{"key":24,"text":89,"correct":26},"施工及验收记录",{"key":28,"text":91,"correct":22},"测量控制点验收记录",{"key":31,"text":93,"correct":22},"单位工程质量检验记录",{"key":34,"text":95,"correct":22},"疏浚竣工测量技术报告","CDE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":96,"analysis":37},1130695,"在港口工程质量检验中，把工程划分为（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":26},"单项工程",{"key":24,"text":104,"correct":26},"工程项目",{"key":28,"text":106,"correct":22},"单位工程",{"key":31,"text":108,"correct":22},"分项工程",{"key":34,"text":110,"correct":22},"分部工程",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":125,"analysis":37},1130696,"在港口工程检验批质量检验中，将检验项目划分为（ ）。",[115,117,119,121,123],{"key":20,"text":116,"correct":22},"主要检验项目",{"key":24,"text":118,"correct":26},"指定检验项目",{"key":28,"text":120,"correct":22},"一般项目",{"key":31,"text":122,"correct":26},"允许偏差项目",{"key":34,"text":124,"correct":26},"特殊项目","AC",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},1130697,"在水运工程质量检验标准中主要检验项目是指（ ）的项目。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"对安全起决定性作用",{"key":24,"text":133,"correct":22},"对环境起决定性作用的项目",{"key":28,"text":135,"correct":26},"对工程造价起决定性作用的项目",{"key":31,"text":137,"correct":26},"对工程观瞻起决定性作用的项目",{"key":34,"text":139,"correct":26},"对工期影响起决定性作用的项目","AB",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},1130698,"分部工程质量由施工单位组织自检合格后，由总监理工程师组织对地基基础质量检验确认时（ ）应参与检验。",[145,147,149,151,153],{"key":20,"text":146,"correct":26},"质检单位",{"key":24,"text":148,"correct":22},"勘察单位",{"key":28,"text":150,"correct":22},"施工单位",{"key":31,"text":152,"correct":22},"设计单位",{"key":34,"text":154,"correct":26},"质量监督部门","BCD",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":155,"analysis":37},1130699,"单位工程观感质量评价应由质量监督机构组织（ ）参加进行。",[160,161,163,164,166],{"key":20,"text":146,"correct":26},{"key":24,"text":162,"correct":22},"建设单位",{"key":28,"text":150,"correct":22},{"key":31,"text":165,"correct":22},"监理单位",{"key":34,"text":152,"correct":26},{"id":168,"libraryId":5,"type":15,"typeLabel":16,"stem":169,"options":170,"answer":155,"analysis":37},1130700,"观感质量检查项目评价采取（ ）方法进行。",[171,173,175,177,179],{"key":20,"text":172,"correct":26},"以10分制评分法",{"key":24,"text":174,"correct":22},"观察检查",{"key":28,"text":176,"correct":22},"必要的测量",{"key":31,"text":178,"correct":22},"共同讨论",{"key":34,"text":180,"correct":26},"平均分数",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":195,"analysis":37},1130701,"对涉及结构安全和使用功能的有关产品，监理单位应进行（ ）。",[185,187,189,191,193],{"key":20,"text":186,"correct":22},"见证抽检",{"key":24,"text":188,"correct":26},"委托第三方检验",{"key":28,"text":190,"correct":26},"查看检验记录",{"key":31,"text":192,"correct":22},"平行检验",{"key":34,"text":194,"correct":26},"补充检验","AD",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":210,"analysis":37},1130702,"检验批质量检验的合格标准包括（ ）。",[200,202,204,206,208],{"key":20,"text":201,"correct":26},"主要检验项目合格率在80％以上",{"key":24,"text":203,"correct":22},"主要检验项目全部合格",{"key":28,"text":205,"correct":26},"一般检验项目合格率在80％以上",{"key":31,"text":207,"correct":22},"一般检验项目全部合格",{"key":34,"text":209,"correct":26},"允许偏差项目的抽检合格率在90％以上","BD",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":225,"analysis":37},1130703,"分部工程质量合格标准包括（ ）。",[215,217,219,221,223],{"key":20,"text":216,"correct":22},"所含分项工程质量全部合格",{"key":24,"text":218,"correct":26},"所含分项工程质量合格率达到90％以上",{"key":28,"text":220,"correct":22},"工程质量控制资料完整",{"key":31,"text":222,"correct":26},"所含分项工程质量合格率达到80％以上",{"key":34,"text":224,"correct":22},"地基基础的安全功能检验结果符合有关规定","ACE",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":36,"analysis":37},1130704,"当分项工程质量检验不合格时，对其处理包括（ ）。",[230,232,234,236,238],{"key":20,"text":231,"correct":22},"返工重做并重新进行检验",{"key":24,"text":233,"correct":26},"返工重做达到要求的也认定为不合格",{"key":28,"text":235,"correct":22},"返工重做能满足安全要求的可予验收",{"key":31,"text":237,"correct":22},"经检测能达到设计要求的可认定为合格",{"key":34,"text":239,"correct":22},"经检测能满足结构安全和使用要求的可认定合格",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":210,"analysis":37},1130705,"水运工程开工前，建设单位应组织（ ）对单位工程、分部、分项工程进行划分。",[244,245,246,247,248],{"key":20,"text":152,"correct":26},{"key":24,"text":150,"correct":22},{"key":28,"text":146,"correct":26},{"key":31,"text":165,"correct":22},{"key":34,"text":249,"correct":26},"质量监督单位",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":155,"analysis":37},1130706,"建设单位收到单位工程竣工报告后应及时组织（ ）对单位工程进行预验收。",[254,255,256,257,258],{"key":20,"text":146,"correct":26},{"key":24,"text":150,"correct":22},{"key":28,"text":165,"correct":22},{"key":31,"text":152,"correct":22},{"key":34,"text":249,"correct":26},{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":155,"analysis":37},1130707,"分部工程的质量由施工单位组织自检合格后，报监理单位，由总监理工程师组织（ ）进行检验与确认。",[263,264,266,268,270],{"key":20,"text":154,"correct":26},{"key":24,"text":265,"correct":22},"施工单位项目负责人",{"key":28,"text":267,"correct":22},"施工单位质量负责人",{"key":31,"text":269,"correct":22},"施工单位技术负责人",{"key":34,"text":162,"correct":26},{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":285,"analysis":37},1130708,"观感质量评价分为（ ）项目。",[275,277,279,281,283],{"key":20,"text":276,"correct":22},"一级",{"key":24,"text":278,"correct":22},"二级",{"key":28,"text":280,"correct":22},"三级",{"key":31,"text":282,"correct":26},"特级",{"key":34,"text":284,"correct":22},"不通过","ABCE",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":36,"analysis":37},1130709,"潜水作业前，应充分了解作业现场的（ ），严格按照潜水作业安全技术操作规程作业。",[290,292,294,296,298],{"key":20,"text":291,"correct":22},"水文",{"key":24,"text":293,"correct":26},"水流",{"key":28,"text":295,"correct":22},"气象",{"key":31,"text":297,"correct":22},"地质",{"key":34,"text":299,"correct":22},"水质",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":314,"analysis":37},1130710,"进入施工船舶的封闭处所作业的安全规定有（ ）。",[304,306,308,310,312],{"key":20,"text":305,"correct":22},"施工船舶应配备必要的通风器材、防毒面具、急救医疗器材、氧气呼吸装置等应急防护设备或设施",{"key":24,"text":307,"correct":22},"作业人员进入封闭处所前，封闭处所应进行通风，并测定空气质量",{"key":28,"text":309,"correct":26},"在封闭处所内动火作业时，动火受到影响的舱室必须进行测氧、清舱、测爆。通风时，要输氧换气",{"key":31,"text":311,"correct":22},"封闭处所内存在接触性有毒物质时，作业人员应穿戴相应的防护用品",{"key":34,"text":313,"correct":22},"作业人员进入封闭处所进行作业时，封闭处所外应有监护人员，并确保联系畅通","ABDE",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":285,"analysis":37},1130711,"建筑物拆除正确的拆除方法有（ ）。",[319,321,323,325,327],{"key":20,"text":320,"correct":22},"自上而下",{"key":24,"text":322,"correct":22},"逐层分段",{"key":28,"text":324,"correct":22},"将保留部分进行加固",{"key":31,"text":326,"correct":26},"上下立体交叉作业",{"key":34,"text":328,"correct":22},"先水上后水下",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":285,"analysis":37},1130712,"水上沉桩作业的安全要求包括（ ）。",[333,335,337,339,341],{"key":20,"text":334,"correct":22},"打桩架上的作业人员应在电梯笼内或作业平台上操作",{"key":24,"text":336,"correct":22},"移船时锚缆不得绊桩",{"key":28,"text":338,"correct":22},"水上悬吊桩锤沉桩应设置固定桩位的导桩架和工作平台",{"key":31,"text":340,"correct":26},"在沙性土中施打开口或半封闭桩尖的钢管桩应采取防止上浮措施",{"key":34,"text":342,"correct":22},"沉桩后应及时进行夹桩",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":36,"analysis":37},1130713,"吊装护面块体正确的作业安全要求有（ ）。",[347,349,351,353,355],{"key":20,"text":348,"correct":22},"自动脱钩应安全、可靠",{"key":24,"text":350,"correct":26},"起吊时应待钩绳受力、块体离地，挂钩人员方可离开",{"key":28,"text":352,"correct":22},"用自动脱钩起吊的块体在吊安过程中严禁碰撞任何物体",{"key":31,"text":354,"correct":22},"刚安的扭王字块、扭工字块、四角锥等异型块体上不得站人",{"key":34,"text":356,"correct":22},"调整块体位置应采用可靠的安全防护措施",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":225,"analysis":37},1130714,"港口与航道工程安全生产要求中，施工用电应严格执行国家、地方、企业的有关标准和规定，确保施工现场用电的安全、可靠、有效的运行，（ ），明确各级用电安全负责人和管理人员。",[361,363,365,367,369],{"key":20,"text":362,"correct":22},"必须建立用电安全岗位责任制",{"key":24,"text":364,"correct":26},"必须建立用电奖罚制度",{"key":28,"text":366,"correct":22},"必须建立安全用电制度",{"key":31,"text":368,"correct":26},"明确各级用电负责人和管理人员",{"key":34,"text":370,"correct":22},"必须健全用电安全岗位责任制",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":36,"analysis":37},1130715,"沿海港口水工建筑及装卸机械设备安装工程船舶机械艘（台）班费用定额组成中的第一类费用，包括（ ）。",[375,377,379,381,383],{"key":20,"text":376,"correct":22},"机械大修费",{"key":24,"text":378,"correct":26},"动力费",{"key":28,"text":380,"correct":22},"船舶航修费",{"key":31,"text":382,"correct":22},"船舶小修费",{"key":34,"text":384,"correct":22},"辅助设施费",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":399,"analysis":37},1130716,"疏浚工程预算定额工程量中，对疏浚工程应包括（ ）。",[389,391,393,395,397],{"key":20,"text":390,"correct":22},"设计断面工程量",{"key":24,"text":392,"correct":22},"计算超宽工程量",{"key":28,"text":394,"correct":26},"换算成吹填土方",{"key":31,"text":396,"correct":22},"计算超深工程量",{"key":34,"text":398,"correct":26},"流失量","ABD",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":414,"analysis":37},1130717,"计算疏浚工程船舶停置费用时，应包括（ ）等费用。",[404,406,408,410,412],{"key":20,"text":405,"correct":26},"船舶检修费",{"key":24,"text":407,"correct":22},"船舶折旧费",{"key":28,"text":409,"correct":22},"船舶保修费",{"key":31,"text":411,"correct":22},"艘班人工费",{"key":34,"text":413,"correct":22},"材料费与部分燃料费","BCDE",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":429,"analysis":37},1130718,"疏浚工程定额中，自然影响包括（ ）。",[419,421,423,425,427],{"key":20,"text":420,"correct":22},"风",{"key":24,"text":422,"correct":26},"船舶避让",{"key":28,"text":424,"correct":22},"雾",{"key":31,"text":426,"correct":22},"浪",{"key":34,"text":428,"correct":26},"停电","ACD",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":225,"analysis":37},1130719,"沿海港口水工建筑工程定额包括（ ）。",[434,436,438,440,442],{"key":20,"text":435,"correct":22},"土石方工程",{"key":24,"text":437,"correct":26},"港池、航道挖泥工程",{"key":28,"text":439,"correct":22},"基础工程",{"key":31,"text":441,"correct":26},"港池炸礁工程",{"key":34,"text":443,"correct":22},"混凝土工程",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":429,"analysis":37},1130720,"施工现场应设置各类必要的职工生活设施，并符合（ ），职工的膳食、饮水供应等应符合卫生要求。",[448,450,452,454,456],{"key":20,"text":449,"correct":22},"照明要求",{"key":24,"text":451,"correct":26},"业务要求",{"key":28,"text":453,"correct":22},"卫生要求",{"key":31,"text":455,"correct":22},"通风要求",{"key":34,"text":457,"correct":26},"现代要求",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":52,"analysis":37},1130721,"港口与航道工程现场文明施工的基本要求中，施工现场必须设置明显的标牌，标明工程项目名称、（ ）、项目经理和施工现场总代表人的姓名，开、竣工日期，施工许可证批准文号等。",[462,463,464,465,466],{"key":20,"text":162,"correct":22},{"key":24,"text":152,"correct":22},{"key":28,"text":150,"correct":22},{"key":31,"text":148,"correct":26},{"key":34,"text":467,"correct":26},"分包单位",[469,473,476,479,482,485],{"id":470,"name":471,"category":7,"favorite":472},1,"领导干部任职前廉政法规知识测试题",92,{"id":474,"name":475,"category":7,"favorite":470},595,"建筑结构与设备",{"id":477,"name":478,"category":7,"favorite":470},715,"招标采购专业知识与法律法规",{"id":480,"name":481,"category":7,"favorite":470},848,"市政方向-通用基础",{"id":483,"name":484,"category":7,"favorite":8},534,"BIM工程师",{"id":486,"name":484,"category":7,"favorite":8},535]