[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-794-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":721},{"id":5,"name":6,"category":7,"favorite":8},794,"一建港口与航道工程实务","建筑工程",0,22,50,1132,[13,38,48,58,67,82,96,111,126,140,155,170,184,199,214,228,242,257,272,287,301,315,329,343,357,370,384,398,412,426,441,455,469,482,497,511,525,540,554,568,580,594,608,622,636,651,665,679,693,707],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1130640,2,"多选题","通航建筑物工程专业承包资质分为（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","特级",false,{"key":24,"text":25,"correct":26},"B","一级",true,{"key":28,"text":29,"correct":26},"C","二级",{"key":31,"text":32,"correct":26},"D","三级",{"key":34,"text":35,"correct":22},"E","四级","BCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":47,"analysis":37},1130641,"港航设备安装及水上交管工程专业承包资质分为（ ）。",[42,43,44,45,46],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":22},{"key":34,"text":35,"correct":22},"BC",{"id":49,"libraryId":5,"type":15,"typeLabel":16,"stem":50,"options":51,"answer":57,"analysis":37},1130642,"港口与航道工程总承包企业资质分为（ ）。",[52,53,54,55,56],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":26},{"key":34,"text":35,"correct":22},"ABCD",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":36,"analysis":37},1130643,"港口与海岸工程专业承包资质分为（ ）。",[62,63,64,65,66],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":26},{"key":34,"text":35,"correct":22},{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1130644,"港口与航道工程总承包二级资质企业可承担以下（ ）工程项目的施工。",[71,73,75,77,79],{"key":20,"text":72,"correct":26},"水深小于7m的防波堤",{"key":24,"text":74,"correct":26},"5万t级以下船坞船台及滑道工程",{"key":28,"text":76,"correct":26},"1200m以下围堤护岸工程",{"key":31,"text":78,"correct":22},"海上灯塔",{"key":34,"text":80,"correct":22},"海上风电","ABC",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":57,"analysis":37},1130645,"港口与航道工程总承包一级资质企业可承担以下（ ）工程项目的施工。",[86,88,90,92,94],{"key":20,"text":87,"correct":26},"护岸",{"key":24,"text":89,"correct":26},"堆场道路及陆域构筑物",{"key":28,"text":91,"correct":26},"船台",{"key":31,"text":93,"correct":26},"水下地基及基础",{"key":34,"text":95,"correct":22},"各类港口航道工程",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":110,"analysis":37},1130646,"高桩码头工程施工组织设计编制中，高桩码头施工工序主要有（ ）、现浇混凝土和岸坡施工等。",[100,102,104,106,108],{"key":20,"text":101,"correct":26},"沉桩",{"key":24,"text":103,"correct":22},"测量",{"key":28,"text":105,"correct":26},"施工挖泥",{"key":31,"text":107,"correct":26},"构件安装",{"key":34,"text":109,"correct":22},"系船柱安装","ACD",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":125,"analysis":37},1130647,"高桩码头工程施工组织设计编制中，应按工程地质报告所提供的资料，将与施工有关的资料列入，包括土层厚度，层顶标高，重力密度，天然含水量，内摩擦角，黏聚力，压缩系数，（ ）等。分析施工中应注意的事项。",[115,117,119,121,123],{"key":20,"text":116,"correct":26},"标准贯入击数",{"key":24,"text":118,"correct":26},"静力触探值",{"key":28,"text":120,"correct":26},"土的层底标高",{"key":31,"text":122,"correct":22},"土的平均厚度",{"key":34,"text":124,"correct":26},"土层名称","ABCE",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":139,"analysis":37},1130648,"高桩码头工程施工组织设计编制中，主要施工方案的内容有：挖泥、测量、构件预制及安装、模板工程、钢筋工程、（ ）、土石方工程、设备安装工程、附属设施安装工程等。",[130,132,133,135,137],{"key":20,"text":131,"correct":26},"混凝土工程",{"key":24,"text":101,"correct":26},{"key":28,"text":134,"correct":22},"粉刷工程",{"key":31,"text":136,"correct":22},"照明工程",{"key":34,"text":138,"correct":22},"砌筑工程","AB",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":154,"analysis":37},1130649,"高桩码头工程施工组织设计编制中，“沉桩施工方案”包括障碍物的探摸清除，（ ），锤、桩船（桩架）、桩垫木和替打的选用，锚缆和地笼的布设，桩的运输和堆放，斜坡上沉桩技术措施及岸坡稳定，桩的高应变和低应变动测。",[144,146,148,150,152],{"key":20,"text":145,"correct":22},"确定梁板安装顺序",{"key":24,"text":147,"correct":26},"编制运桩图和落驳图",{"key":28,"text":149,"correct":22},"确定制桩顺序",{"key":31,"text":151,"correct":26},"确定沉桩顺序",{"key":34,"text":153,"correct":22},"确定测量顺序","BD",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":169,"analysis":37},1130650,"施工组织设计的主要内容包括（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":26},"施工的组织管理机构",{"key":24,"text":162,"correct":26},"施工的总体部署和主要施工方案",{"key":28,"text":164,"correct":22},"业主、监理、质量监督应承担的责任",{"key":31,"text":166,"correct":26},"施工进度计划",{"key":34,"text":168,"correct":22},"施工索赔计划","ABD",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":57,"analysis":37},1130651,"施工组织设计的主要技术经济指标包括（ ）。",[174,176,178,180,182],{"key":20,"text":175,"correct":26},"工期指标",{"key":24,"text":177,"correct":26},"质量指标",{"key":28,"text":179,"correct":26},"安全指标",{"key":31,"text":181,"correct":26},"成本指标",{"key":34,"text":183,"correct":22},"业绩（形象）工程指标",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":198,"analysis":37},1130652,"编制疏浚工程施工组织设计的依据应包括（ ）。",[188,190,192,194,196],{"key":20,"text":189,"correct":26},"施工合同",{"key":24,"text":191,"correct":22},"投标文件",{"key":28,"text":193,"correct":26},"设计文件",{"key":31,"text":195,"correct":26},"采用的规范与标准",{"key":34,"text":197,"correct":26},"会议纪要","ACDE",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":213,"analysis":37},1130653,"航道整治工程施工组织设计中工程概况的编制主要包括（ ）。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"项目部人员组成概况",{"key":24,"text":206,"correct":26},"建设、监理、设计、质监等相关单位",{"key":28,"text":208,"correct":26},"结构形式及主要工程量",{"key":31,"text":210,"correct":26},"整治河段的自然条件",{"key":34,"text":212,"correct":26},"施工目的","BCDE",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":125,"analysis":37},1130654,"航道整治工程施工组织设计中的施工总平面布置图一般应包括（ ）。",[218,220,222,224,226],{"key":20,"text":219,"correct":26},"水上水下地形等高（或等深）线",{"key":24,"text":221,"correct":26},"生产生活临时设施",{"key":28,"text":223,"correct":26},"项目范围内已有相关建筑物的位置和尺寸",{"key":31,"text":225,"correct":22},"周边环境标识",{"key":34,"text":227,"correct":26},"控制坐标网",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":125,"analysis":37},1130655,"航道整治工程施工组织设计中的主要技术经济指标一般应包括（ ）。",[232,234,236,238,240],{"key":20,"text":233,"correct":26},"施工工期",{"key":24,"text":235,"correct":26},"施工成本",{"key":28,"text":237,"correct":26},"施工质量",{"key":31,"text":239,"correct":22},"施工条件",{"key":34,"text":241,"correct":26},"施工效率",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":256,"analysis":37},1130656,"航道整治工程施工组织设计的编制依据包括（ ）。",[246,248,250,252,254],{"key":20,"text":247,"correct":26},"招标文件",{"key":24,"text":249,"correct":26},"合同文件",{"key":28,"text":251,"correct":22},"项目经理责任目标",{"key":31,"text":253,"correct":26},"国家有关工程建设政策",{"key":34,"text":255,"correct":26},"现场施工条件","ABDE",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":271,"analysis":37},1130657,"筑坝工程的主要施工工序包括（ ）。",[261,263,265,267,269],{"key":20,"text":262,"correct":22},"滩面处理",{"key":24,"text":264,"correct":26},"坝体表面整理",{"key":28,"text":266,"correct":22},"根部护岸",{"key":31,"text":268,"correct":22},"护坡",{"key":34,"text":270,"correct":26},"坝根接岸处理","BE",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":286,"analysis":37},1130658,"高桩码头工程施工组织设计编制依据有：（ ）、设计文件、施工规范和验收标准及有关文件、会议纪要等。",[276,278,280,282,284],{"key":20,"text":277,"correct":22},"监理合同",{"key":24,"text":279,"correct":22},"勘察合同",{"key":28,"text":281,"correct":26},"工程承包合同",{"key":31,"text":283,"correct":22},"设计合同",{"key":34,"text":285,"correct":26},"招投标文件","CE",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":81,"analysis":37},1130659,"高桩码头工程施工组织设计编制中，“工程规模”主要阐述表示工程特征的代表值、（ ）、停靠船型和等级、码头及引桥的数量、标高、后方道路堆场的数量和面积、主要装卸设备的规格和数量等。",[291,293,295,297,299],{"key":20,"text":292,"correct":26},"码头及引桥标高",{"key":24,"text":294,"correct":26},"码头及引桥主要结构形式",{"key":28,"text":296,"correct":26},"码头前沿水深",{"key":31,"text":298,"correct":22},"表示工程特征的统计值",{"key":34,"text":300,"correct":22},"船舶尺寸",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":139,"analysis":37},1130660,"高桩码头工程施工组织设计编制中，“技术经济条件”包括：预制构件加工、劳动力市场情况等建设项目地区的施工能力；钢材、木材、水泥、黄沙和石子等大宗建筑材料供应情况；交通条件和（ ）。",[305,307,309,311,313],{"key":20,"text":306,"correct":26},"机械设备租赁条件",{"key":24,"text":308,"correct":26},"水电供应条件",{"key":28,"text":310,"correct":22},"工程地质条件",{"key":31,"text":312,"correct":22},"水位资料",{"key":34,"text":314,"correct":22},"潮流资料",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":256,"analysis":37},1130661,"下列施工工序中，属于斜坡堤施工的工序有（ ）。",[319,321,323,325,327],{"key":20,"text":320,"correct":26},"护底施工",{"key":24,"text":322,"correct":26},"垫层块石施工",{"key":28,"text":324,"correct":22},"护滩施工",{"key":31,"text":326,"correct":26},"护面块体安装",{"key":34,"text":328,"correct":26},"块石棱体施工",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":81,"analysis":37},1130662,"编制施工计划时，疏浚工程施工进度应包括（ ）三个阶段。",[333,335,337,339,341],{"key":20,"text":334,"correct":26},"现场准备",{"key":24,"text":336,"correct":26},"施工",{"key":28,"text":338,"correct":26},"竣工验收",{"key":31,"text":340,"correct":22},"浚前测量",{"key":34,"text":342,"correct":22},"浚后测量",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":81,"analysis":37},1130663,"航道整治工程中属于施工自然条件的是（ ）。",[347,349,351,353,355],{"key":20,"text":348,"correct":26},"水位",{"key":24,"text":350,"correct":26},"气象",{"key":28,"text":352,"correct":26},"工程地质",{"key":31,"text":354,"correct":22},"交通",{"key":34,"text":356,"correct":22},"补给",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":369,"analysis":37},1130664,"疏浚工程中属于施工组织条件的是（ ）。",[361,363,364,365,367],{"key":20,"text":362,"correct":22},"水文",{"key":24,"text":350,"correct":22},{"key":28,"text":352,"correct":22},{"key":31,"text":366,"correct":26},"水陆交通",{"key":34,"text":368,"correct":26},"水、电、气","DE",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":154,"analysis":37},1130665,"疏浚工程施工组织设计中施工的总体部署和主要施工方案应包括（ ）。",[374,376,378,380,382],{"key":20,"text":375,"correct":22},"施工自然条件",{"key":24,"text":377,"correct":26},"施工船舶选择",{"key":28,"text":379,"correct":22},"施工组织条件",{"key":31,"text":381,"correct":26},"施工方法",{"key":34,"text":383,"correct":22},"施工计划",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":198,"analysis":37},1130666,"疏浚工程施工组织设计中的工程概况应包括（ ）。",[388,390,392,394,396],{"key":20,"text":389,"correct":26},"工程名称",{"key":24,"text":391,"correct":22},"码头结构形式",{"key":28,"text":393,"correct":26},"工程规模",{"key":31,"text":395,"correct":26},"工程位置",{"key":34,"text":397,"correct":26},"工程范围",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":256,"analysis":37},1130667,"航道整治工程施工部署的内容和侧重点在航道整治工程施工中一般应包括（ ）。",[402,404,406,408,410],{"key":20,"text":403,"correct":26},"确定总体施工程序",{"key":24,"text":405,"correct":26},"划分项目施工阶段界线",{"key":28,"text":407,"correct":22},"企业生产经营能力",{"key":31,"text":409,"correct":26},"确定工程施工总进度安排及主要项目程序",{"key":34,"text":411,"correct":26},"根据交工期限要求确定各单项工程竣工时间",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":256,"analysis":37},1130668,"航道整治工程施工组织设计中应拟定项目组织机构的内部质量管理、安全保证体系及主要质量、安全措施，各项措施中应有（ ）。",[416,418,420,422,424],{"key":20,"text":417,"correct":26},"经济保证措施",{"key":24,"text":419,"correct":26},"技术保证措施",{"key":28,"text":421,"correct":22},"项目文化活动措施",{"key":31,"text":423,"correct":26},"组织保证措施",{"key":34,"text":425,"correct":26},"合同保证措施",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":440,"analysis":37},1130669,"航道整治工程施工组织设计中应编制施工进度计划，其内容应包括（ ）。",[430,432,434,436,438],{"key":20,"text":431,"correct":26},"施工总进度计划和施工总进度保证措施",{"key":24,"text":433,"correct":26},"主要分部（项）工程施工网络计划及说明",{"key":28,"text":435,"correct":22},"施工劳动力需求量计划及说明",{"key":31,"text":437,"correct":22},"施工准备工作计划及说明",{"key":34,"text":439,"correct":26},"单位工程施工进度计划图及说明","ABE",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":454,"analysis":37},1130670,"航道整治工程常用护滩带工程稳固河滩，护滩带工程的主要施工工序包括（ ）。",[445,447,449,451,452],{"key":20,"text":446,"correct":26},"抛石面层",{"key":24,"text":448,"correct":22},"水上沉排",{"key":28,"text":450,"correct":22},"水上抛枕",{"key":31,"text":270,"correct":22},{"key":34,"text":453,"correct":26},"干滩铺软体排护滩","AE",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":57,"analysis":37},1130671,"疏浚与吹填单位工程费用的定额直接费包括",[459,461,463,465,467],{"key":20,"text":460,"correct":26},"挖泥、运泥、吹泥费",{"key":24,"text":462,"correct":26},"开工展布、收工集合费",{"key":28,"text":464,"correct":26},"施工队伍调遣费",{"key":31,"text":466,"correct":26},"管架安拆费",{"key":34,"text":468,"correct":22},"疏浚测量费",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":256,"analysis":37},1130672,"下列属于疏浚与吹填单位工程费用中的其他费用的组成的是（ ）。",[473,475,477,479,480],{"key":20,"text":474,"correct":26},"安全文明施工费",{"key":24,"text":476,"correct":26},"卧冬费",{"key":28,"text":478,"correct":22},"扫海费",{"key":31,"text":468,"correct":26},{"key":34,"text":481,"correct":26},"施工浮标抛撤及使用费",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":496,"analysis":37},1130673,"工程费用应由（ ）等组成。",[486,488,490,492,494],{"key":20,"text":487,"correct":22},"直接费",{"key":24,"text":489,"correct":22},"间接费",{"key":28,"text":491,"correct":26},"建筑工程费",{"key":31,"text":493,"correct":26},"设备购置费",{"key":34,"text":495,"correct":26},"安装工程费","CDE",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":440,"analysis":37},1130674,"对于一般水工工程，下列沿海港口工程为一类的是（ ）。",[501,503,505,507,509],{"key":20,"text":502,"correct":26},"码头吨级大于等于10000",{"key":24,"text":504,"correct":26},"直立式防波堤",{"key":28,"text":506,"correct":22},"斜坡式防波堤",{"key":31,"text":508,"correct":22},"引堤",{"key":34,"text":510,"correct":26},"取水构筑物",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":125,"analysis":37},1130675,"沿海港口建设工程项目总概算应由（ ）组成。",[515,517,519,521,523],{"key":20,"text":516,"correct":26},"工程费用",{"key":24,"text":518,"correct":26},"工程建设其他费用",{"key":28,"text":520,"correct":26},"预留费用",{"key":31,"text":522,"correct":22},"利息",{"key":34,"text":524,"correct":26},"专项概算",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":539,"analysis":37},1130676,"港口工程施工合同规定，属于（ ）的情况，承包商可以获得工程延期。",[529,531,533,535,537],{"key":20,"text":530,"correct":26},"建设单位延误施工现场移交",{"key":24,"text":532,"correct":22},"施工单位施工设备出现故障",{"key":28,"text":534,"correct":26},"工程师延误图纸移交",{"key":31,"text":536,"correct":22},"不利于施工的自然条件和障碍影响",{"key":34,"text":538,"correct":22},"暂时停工","AC",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":286,"analysis":37},1130677,"索赔按目的划分包括（ ）。",[544,546,548,550,552],{"key":20,"text":545,"correct":22},"综合索赔",{"key":24,"text":547,"correct":22},"单项索赔",{"key":28,"text":549,"correct":26},"工期索赔",{"key":31,"text":551,"correct":22},"合同内索赔",{"key":34,"text":553,"correct":26},"费用索赔",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":169,"analysis":37},1130678,"港口与航道工程的索赔程序中，（ ）是承包商应完成的工作。",[558,560,562,564,566],{"key":20,"text":559,"correct":26},"发出索赔意向通知书",{"key":24,"text":561,"correct":26},"提出索赔报告",{"key":28,"text":563,"correct":22},"审查索赔报告",{"key":31,"text":565,"correct":26},"做好现场同期记录",{"key":34,"text":567,"correct":22},"审查索赔处理",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":256,"analysis":37},1130679,"施工中因不可抗力事件的影响而使承包商受到损失时，可以进行索赔的款项可能包括（ ）。",[572,573,574,576,578],{"key":20,"text":487,"correct":26},{"key":24,"text":489,"correct":26},{"key":28,"text":575,"correct":22},"利润损失",{"key":31,"text":577,"correct":26},"施工现场管理费",{"key":34,"text":579,"correct":26},"公司总部管理费",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":125,"analysis":37},1130680,"不可抗力导致的人员伤亡、财产损失、费用增加和（或）工期延误等后果的承担原则是（ ）。",[584,586,588,590,592],{"key":20,"text":585,"correct":26},"永久工程以及因工程损害造成的第三方人员伤亡和财产损失由发包人承担",{"key":24,"text":587,"correct":26},"承包人设备的损坏由承包人承担",{"key":28,"text":589,"correct":26},"发包人和承包人各自承担其人员伤亡和其他财产损失及其相关费用",{"key":31,"text":591,"correct":22},"承包人的停工损失由发包人承担",{"key":34,"text":593,"correct":26},"不能按期竣工的，应合理延长工期",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":539,"analysis":37},1130681,"在施工过程中，导致暂停施工可以进行工期索赔的情况有（ ）。",[598,600,602,604,606],{"key":20,"text":599,"correct":26},"非施工单位原因，建设单位代表要求暂停施工",{"key":24,"text":601,"correct":22},"非建设单位原因，施工单位要求暂停施工",{"key":28,"text":603,"correct":26},"由于建设单位违约，承包方主动暂停施工",{"key":31,"text":605,"correct":22},"由于施工单位违约，发包方要求暂停施工",{"key":34,"text":607,"correct":22},"施工单位新技术应用",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":57,"analysis":37},1130682,"水运工程施工中，由于（）造成工程延误，经监理工程师确认并报建设单位批准，施工期可以延长。",[612,614,616,618,620],{"key":20,"text":613,"correct":26},"没有发布航行通告",{"key":24,"text":615,"correct":26},"没有办理抛泥区许可证",{"key":28,"text":617,"correct":26},"地震",{"key":31,"text":619,"correct":26},"地质条件与设计出入较大",{"key":34,"text":621,"correct":22},"施工船机备件延误",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":213,"analysis":37},1130683,"出现（ ）的情况时，施工单位延期申请能够成立并获得监理工程师批准。",[626,628,630,632,634],{"key":20,"text":627,"correct":22},"延期是由施工单位自身原因引起",{"key":24,"text":629,"correct":26},"建设单位原因造成工程延误",{"key":28,"text":631,"correct":26},"设计变更或工程量增加造成工程延误",{"key":31,"text":633,"correct":26},"不可抗力或地质条件变化造成工程延误",{"key":34,"text":635,"correct":26},"合同专用条款中约定的其他",{"id":637,"libraryId":5,"type":15,"typeLabel":16,"stem":638,"options":639,"answer":650,"analysis":37},1130684,"索赔事件主要包括（ ）。",[640,642,644,646,648],{"key":20,"text":641,"correct":26},"发包人违约",{"key":24,"text":643,"correct":22},"工程量增加",{"key":28,"text":645,"correct":22},"设计方案改变",{"key":31,"text":647,"correct":26},"不可抗力因素",{"key":34,"text":649,"correct":26},"第三人造成的违约","ADE",{"id":652,"libraryId":5,"type":15,"typeLabel":16,"stem":653,"options":654,"answer":57,"analysis":37},1130685,"项目进度目标可以按（ ）进行分解。",[655,657,659,661,663],{"key":20,"text":656,"correct":26},"单位工程",{"key":24,"text":658,"correct":26},"施工阶段",{"key":28,"text":660,"correct":26},"承包专业",{"key":31,"text":662,"correct":26},"年、季、月进度计划",{"key":34,"text":664,"correct":22},"经济效益高低",{"id":666,"libraryId":5,"type":15,"typeLabel":16,"stem":667,"options":668,"answer":125,"analysis":37},1130686,"施工总进度计划的内容应包括（ ）。",[669,671,673,675,677],{"key":20,"text":670,"correct":26},"编制说明",{"key":24,"text":672,"correct":26},"施工总进度计划表",{"key":28,"text":674,"correct":26},"分批施工工程的开工日期一览表",{"key":31,"text":676,"correct":22},"效益量化指标",{"key":34,"text":678,"correct":26},"资源需求量及供应平衡表",{"id":680,"libraryId":5,"type":15,"typeLabel":16,"stem":681,"options":682,"answer":125,"analysis":37},1130687,"单位工程施工进度计划的编制依据包括（ ）。",[683,685,687,689,691],{"key":20,"text":684,"correct":26},"项目管理目标责任书",{"key":24,"text":686,"correct":26},"施工总进度计划",{"key":28,"text":688,"correct":26},"施工方案",{"key":31,"text":690,"correct":22},"总监理工程师随时提出的意见",{"key":34,"text":692,"correct":26},"施工现场的平均可工作天数",{"id":694,"libraryId":5,"type":15,"typeLabel":16,"stem":695,"options":696,"answer":271,"analysis":37},1130688,"目前，常用的施工进度计划图的表达方法有（ ）。",[697,699,701,703,705],{"key":20,"text":698,"correct":22},"直方图法",{"key":24,"text":700,"correct":26},"横道图",{"key":28,"text":702,"correct":22},"进度曲线图",{"key":31,"text":704,"correct":22},"鱼刺图",{"key":34,"text":706,"correct":26},"网络图",{"id":708,"libraryId":5,"type":15,"typeLabel":16,"stem":709,"options":710,"answer":198,"analysis":37},1130689,"工程施工进度计划的实施重点包括（ ）。",[711,713,715,717,719],{"key":20,"text":712,"correct":26},"总进度计划目标的分解",{"key":24,"text":714,"correct":22},"绘制施工进度计划图",{"key":28,"text":716,"correct":26},"组织资源供应",{"key":31,"text":718,"correct":26},"落实承包责任制",{"key":34,"text":720,"correct":26},"落实施工条件",[722,726,729,732,735,738],{"id":723,"name":724,"category":7,"favorite":725},1,"领导干部任职前廉政法规知识测试题",92,{"id":727,"name":728,"category":7,"favorite":723},595,"建筑结构与设备",{"id":730,"name":731,"category":7,"favorite":723},715,"招标采购专业知识与法律法规",{"id":733,"name":734,"category":7,"favorite":723},848,"市政方向-通用基础",{"id":736,"name":737,"category":7,"favorite":8},534,"BIM工程师",{"id":739,"name":737,"category":7,"favorite":8},535]