[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-794-21":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":741},{"id":5,"name":6,"category":7,"favorite":8},794,"一建港口与航道工程实务","建筑工程",0,21,50,1132,[13,38,53,68,83,98,112,127,142,156,170,185,199,214,229,243,257,271,285,299,314,327,341,355,369,384,399,413,427,441,455,469,483,498,513,528,543,557,571,585,599,613,627,641,655,669,684,698,712,726],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1130590,2,"多选题","下列质量安全督查时抽查的内容中，属于实体质量督查内容的有（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","检查构件成品保护情况",true,{"key":24,"text":25,"correct":26},"B","检查监测点布设是否符合要求",false,{"key":28,"text":29,"correct":26},"C","检查坝体抛填是否均匀",{"key":31,"text":32,"correct":22},"D","检查预埋件与混凝土面高差",{"key":34,"text":35,"correct":26},"E","检查钢结构油漆涂刷遍数是否符合要求","AD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1130591,"交通运输主管部门制定的年度工程质量监督检查计划内容主要包括（ ）以及有关要求等。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"检查内容",{"key":24,"text":45,"correct":26},"检查项目",{"key":28,"text":47,"correct":22},"检查方式",{"key":31,"text":49,"correct":26},"检查单位",{"key":34,"text":51,"correct":22},"检查频次","ACE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1130592,"质量安全督查分为专项督查和综合督查两类，综合督查抽查的内容包括（ ）等。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"质量管理行为",{"key":24,"text":60,"correct":22},"工程实体质量情况",{"key":28,"text":62,"correct":26},"突出质量问题",{"key":31,"text":64,"correct":22},"现场安全生产状况",{"key":34,"text":66,"correct":22},"施工工艺","ABDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1130593,"统计水上交通事故的基本计算方法包含（ ）等。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"死亡（含失踪）人数按事故发生后7日内的死亡（含失踪）人数进行统计",{"key":24,"text":75,"correct":22},"重伤人数参照国家有关人体伤害鉴定标准确定",{"key":28,"text":77,"correct":22},"船舶溢油数量按实际流入水体的数量进行统计",{"key":31,"text":79,"correct":22},"直接经济损失按水上交通事故对船舶和其他财产造成的直接损失进行统计",{"key":34,"text":81,"correct":26},"船舶沉没或者全损按发生沉没或者全损的船舶原值进行统计","ABCD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1130594,"企业发生重大事故及人身伤亡事故，必须立即将事故概况，用快速方法分别报告（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"上级主管部门",{"key":24,"text":90,"correct":22},"行业安全管理部门",{"key":28,"text":92,"correct":22},"当地劳动部门",{"key":31,"text":94,"correct":26},"当地卫生部门",{"key":34,"text":96,"correct":22},"公安部门","ABCE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":52,"analysis":37},1130595,"对海上交通事故的发生，拒不加强管理或在限期内达不到安全要求的，海事局有权责令其（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"停航",{"key":24,"text":105,"correct":26},"警告通报",{"key":28,"text":107,"correct":22},"改航",{"key":31,"text":109,"correct":26},"经济处罚",{"key":34,"text":111,"correct":22},"停止作业",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1130596,"港口与航道工程水上交通事故分级标准分为（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":26},"特大事故",{"key":24,"text":119,"correct":22},"一般事故",{"key":28,"text":121,"correct":22},"较大事故",{"key":31,"text":123,"correct":22},"重大事故",{"key":34,"text":125,"correct":22},"小事故","BCDE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1130597,"交通部水上交通事故分级标准与（ ）有关。",[131,133,135,137,139],{"key":20,"text":132,"correct":26},"船舶吨位有关",{"key":24,"text":134,"correct":26},"船舶主机功率有关",{"key":28,"text":136,"correct":22},"伤亡人数有关",{"key":31,"text":138,"correct":22},"直接经济损失额有关",{"key":34,"text":140,"correct":26},"海域有关","CD",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":52,"analysis":37},1130598,"水运工程安全生产工作的机制包括（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"从业单位负责",{"key":24,"text":149,"correct":26},"职工自律",{"key":28,"text":151,"correct":22},"政府监管",{"key":31,"text":153,"correct":26},"行业参与",{"key":34,"text":155,"correct":22},"社会监督",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":82,"analysis":37},1130599,"消除人的不安全行为，实现作业行为安全化的主要措施有（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"开展安全思想教育和安全规章制度教育，提高职工安全认识",{"key":24,"text":163,"correct":22},"进行安全知识岗位培训和安全技术交底，提高职工的安全技术素质，落实岗位安全责任制，安全生产三类人员和特种作业人员必须持证上岗",{"key":28,"text":165,"correct":22},"推行安全标准化操作和作业许可审批，严格按照安全操作规程和程序进行作业",{"key":31,"text":167,"correct":22},"搞好均衡生产，注意劳逸结合，使职工保持充沛的精力和良好的状态",{"key":34,"text":169,"correct":26},"签订安全合同，落实企业主责",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":184,"analysis":37},1130600,"（ ）应对施工单位的工程项目清单管理工作进行检查，督促施工单位及时排查治理重大事故隐患。",[174,176,178,180,182],{"key":20,"text":175,"correct":26},"政府安全监督部门",{"key":24,"text":177,"correct":22},"施工企业法人单位",{"key":28,"text":179,"correct":22},"工程项目监理",{"key":31,"text":181,"correct":22},"建设单位",{"key":34,"text":183,"correct":26},"总承包方项目经理部","BCD",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":52,"analysis":37},1130601,"施工现场带班生产制度中所称的公路水运工程施工企业项目负责人，是指公路水运工程施工合同段的（ ）。",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"项目经理",{"key":24,"text":192,"correct":26},"项目书记",{"key":28,"text":194,"correct":22},"项目副经理",{"key":31,"text":196,"correct":26},"项目工会主席",{"key":34,"text":198,"correct":22},"项目总工",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":213,"analysis":37},1130602,"大型施工船舶拖航和调遣前，封舱加固的主要项目包括（）。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"甲板上所有排水孔应保持畅通",{"key":24,"text":206,"correct":22},"主甲板上的舱口、人孔、门、窗、通风筒、空气管必须全部水密封闭或准备能随时水密封闭",{"key":28,"text":208,"correct":26},"起重船、打桩船、挖泥船的吊杆铁架等必须放落或拆下，系牢或焊固",{"key":31,"text":210,"correct":22},"锚具在驶离港区后应收妥固定",{"key":34,"text":212,"correct":26},"被拖船如有推进器，应保证尾轴与主轴连接，随时可以启动","ABD",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":228,"analysis":37},1130603,"水上作业船舶如遇（ ）应停止作业。",[218,220,222,224,226],{"key":20,"text":219,"correct":26},"高温",{"key":24,"text":221,"correct":26},"雨天",{"key":28,"text":223,"correct":22},"浓雾",{"key":31,"text":225,"correct":26},"大浪",{"key":34,"text":227,"correct":22},"超过船舶抗风等级","CE",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":52,"analysis":37},1130604,"船舶防台锚地的选择应考虑（ ）因素。",[233,235,237,239,241],{"key":20,"text":234,"correct":22},"有足够回旋距离的水域",{"key":24,"text":236,"correct":26},"船员是否容易上岸",{"key":28,"text":238,"correct":22},"满足施工现场船舶、设施的水深要求",{"key":31,"text":240,"correct":26},"水上服务设施",{"key":34,"text":242,"correct":22},"便于通信联系和应急抢险救助",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":184,"analysis":37},1130605,"在台风威胁中，以下做法正确的为（ ）。",[247,249,251,253,255],{"key":20,"text":248,"correct":26},"自航施工船舶拆卸主机进行修理",{"key":24,"text":250,"correct":22},"跟踪记录、标绘、分析台风动向",{"key":28,"text":252,"correct":22},"召开防台会议，部署防台工作",{"key":31,"text":254,"correct":22},"备足防台期间的粮食、肉菜以及足够的淡水、燃油",{"key":34,"text":256,"correct":26},"施工船舶立即拆卸锚机进行紧急修理",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":67,"analysis":37},1130606,"大型施工船舶或船队调遣起航后每天（ ）时应向主管单位调度部门报告航行情况。",[261,263,265,267,269],{"key":20,"text":262,"correct":22},"08：00",{"key":24,"text":264,"correct":22},"12：00",{"key":28,"text":266,"correct":26},"18：00",{"key":31,"text":268,"correct":22},"20：00",{"key":34,"text":270,"correct":22},"24：00",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":97,"analysis":37},1130607,"大型施工船舶出海调遣航区划分为（ ）。",[275,277,279,281,283],{"key":20,"text":276,"correct":22},"无限航区",{"key":24,"text":278,"correct":22},"近海航区",{"key":28,"text":280,"correct":22},"沿海航区",{"key":31,"text":282,"correct":26},"内海航区",{"key":34,"text":284,"correct":22},"遮蔽航区",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":67,"analysis":37},1130608,"在北半球，热带气旋按其风力大小可分为（ ）。",[289,291,293,295,297],{"key":20,"text":290,"correct":22},"台风",{"key":24,"text":292,"correct":22},"强热带风暴",{"key":28,"text":294,"correct":26},"龙卷风",{"key":31,"text":296,"correct":22},"热带风暴",{"key":34,"text":298,"correct":22},"热带低压",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":313,"analysis":37},1130609,"沿海水域划定禁航区和安全作业区审批需提交材料目录有七项，其中包含（ ）。",[303,305,307,309,311],{"key":20,"text":304,"correct":22},"禁航理由、时间、水域、活动内容",{"key":24,"text":306,"correct":26},"施工方案（必要时须经过专家评审）",{"key":28,"text":308,"correct":22},"已制定安全及防污染措施的证明材料",{"key":31,"text":310,"correct":22},"已通过评审的通航安全评估报告（必要时）",{"key":34,"text":312,"correct":22},"委托证明及委托人和被委托人身份证明及其复印件（委托时）","ACDE",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":126,"analysis":37},1130610,"大型设施、移动式平台、超限物体水上拖带审批提交材料目录有九项，其中包含（ ）。",[318,320,322,324,325],{"key":20,"text":319,"correct":26},"有关主管部门关于作业或活动的批准文件及其复印件（必要时）",{"key":24,"text":321,"correct":22},"大型设施和移动式平台的技术资料",{"key":28,"text":323,"correct":22},"船检部门为大型设施和移动式平台拖带航行出具的拖航检验证明及其复印件",{"key":31,"text":310,"correct":22},{"key":34,"text":326,"correct":22},"拖带计划、拖带方案",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":97,"analysis":37},1130611,"通航安全水上水下施工作业涉及的范围包括（ ）。",[331,333,335,337,339],{"key":20,"text":332,"correct":22},"设置、拆除水上水下设施",{"key":24,"text":334,"correct":22},"架设桥梁、索道，构筑水下管道",{"key":28,"text":336,"correct":22},"救助遇难船舶，或紧急清除水面污染物、水下污染源",{"key":31,"text":338,"correct":26},"渔船捕捞作业",{"key":34,"text":340,"correct":22},"大面积清除水面垃圾",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":213,"analysis":37},1130612,"施工单位取得《许可证》后，当（ ）发生变化时，须重新申请、办理新的《许可证》。",[345,347,349,351,353],{"key":20,"text":346,"correct":22},"作业的活动内容",{"key":24,"text":348,"correct":22},"作业的水域发生变更",{"key":28,"text":350,"correct":26},"作业方案",{"key":31,"text":352,"correct":22},"作业单位",{"key":34,"text":354,"correct":26},"施工作业人员",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":97,"analysis":37},1130613,"申请水上水下施工作业时应提供的资料包括（ ）。",[359,361,363,365,367],{"key":20,"text":360,"correct":22},"与通航安全有关的技术资料及施工作业图纸",{"key":24,"text":362,"correct":22},"安全及防污染计划书",{"key":28,"text":364,"correct":22},"施工作业者的资质认证文书",{"key":31,"text":366,"correct":26},"航海日志",{"key":34,"text":368,"correct":22},"施工作业船舶的船舶证书和船员适任证书",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":383,"analysis":37},1130614,"水运工程评标委员会成员组成的原则包括（）。",[373,375,377,379,381],{"key":20,"text":374,"correct":22},"必须有招标人的代表",{"key":24,"text":376,"correct":22},"总人数为5人以上的单数",{"key":28,"text":378,"correct":22},"有关的技术、经济专家人数不得少于成员总数的2／3",{"key":31,"text":380,"correct":26},"必须有交通行政主管部门的人员",{"key":34,"text":382,"correct":26},"招标人的代表人数不得少于2人","ABC",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":398,"analysis":37},1130615,"水运工程建设项目招标投标活动，应遵循（ ）的原则。",[388,390,392,394,396],{"key":20,"text":389,"correct":22},"公开",{"key":24,"text":391,"correct":22},"诚信",{"key":28,"text":393,"correct":26},"平等",{"key":31,"text":395,"correct":26},"透明",{"key":34,"text":397,"correct":26},"竞争","AB",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":398,"analysis":37},1130616,"水运工程施工招标方式有（ ）。",[403,405,407,409,411],{"key":20,"text":404,"correct":22},"公开招标",{"key":24,"text":406,"correct":22},"邀请招标",{"key":28,"text":408,"correct":26},"公开议标",{"key":31,"text":410,"correct":26},"有限竞争招标",{"key":34,"text":412,"correct":26},"邀请议标",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":398,"analysis":37},1130617,"水运工程招投标，资格预审审查方法包括（ ）。",[417,419,421,423,425],{"key":20,"text":418,"correct":22},"合格制",{"key":24,"text":420,"correct":22},"有限数量制",{"key":28,"text":422,"correct":26},"推荐制",{"key":31,"text":424,"correct":26},"淘汰制",{"key":34,"text":426,"correct":26},"邀请制",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":97,"analysis":37},1130618,"水运工程施工招标对潜在投标人资格审查属于下列情况之一者，资格审查申请文件视为无效（ ）。",[431,433,435,437,439],{"key":20,"text":432,"correct":22},"资格审查申请文件未盖公章",{"key":24,"text":434,"correct":22},"填报的内容失实",{"key":28,"text":436,"correct":22},"未按期送达资格审查申请文件",{"key":31,"text":438,"correct":26},"文件内容有漏项",{"key":34,"text":440,"correct":22},"法定代表人（或其授权的代理人）无签字（或印鉴）",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":82,"analysis":37},1130619,"水运工程建设项目通过初步设计审批后，方可开展（ ）招标工作。",[445,447,449,451,453],{"key":20,"text":446,"correct":22},"监理",{"key":24,"text":448,"correct":22},"施工",{"key":28,"text":450,"correct":22},"设备",{"key":31,"text":452,"correct":22},"材料",{"key":34,"text":454,"correct":26},"检测",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":36,"analysis":37},1130620,"水运工程投标人可以（ ）投标。",[459,461,463,465,467],{"key":20,"text":460,"correct":22},"单独",{"key":24,"text":462,"correct":26},"联合体中资格等级最高的单位的身份",{"key":28,"text":464,"correct":26},"两个以上法人以一个投标人的身份共同",{"key":31,"text":466,"correct":22},"组成一个联合体以一个投标人的身份共同",{"key":34,"text":468,"correct":26},"联合体的两个法人并列",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":52,"analysis":37},1130621,"施工投标人与本标段的（ ）或招标代理机构不得为同一个法定代表人、存在相互控股或参股或法定代表人相互任职、工作。",[473,475,477,479,481],{"key":20,"text":474,"correct":22},"设计人",{"key":24,"text":476,"correct":26},"第三人",{"key":28,"text":478,"correct":22},"代建人",{"key":31,"text":480,"correct":26},"法律人",{"key":34,"text":482,"correct":22},"监理人",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":497,"analysis":37},1130622,"水运工程开标后，在确定中标人之前，招标人不得与投标人就（ ）等实质性内容进行谈判。",[487,489,491,493,495],{"key":20,"text":488,"correct":26},"工程施工期限",{"key":24,"text":490,"correct":22},"投标方案",{"key":28,"text":492,"correct":26},"工程地点",{"key":31,"text":494,"correct":26},"项目人员",{"key":34,"text":496,"correct":22},"投标价格","BE",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":512,"analysis":37},1130623,"评标工作的内容包括（ ）。",[502,504,506,508,510],{"key":20,"text":503,"correct":22},"评标委员会由5人以上的单数组成",{"key":24,"text":505,"correct":22},"投标人应评标委员会要求就不清楚的问题加以说明",{"key":28,"text":507,"correct":26},"评标委员会可就造价问题与投标人商议",{"key":31,"text":509,"correct":26},"评标委员会可就施工方案与投标人商讨",{"key":34,"text":511,"correct":22},"在中标结果确定前评标委员会组成保密","ABE",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":527,"analysis":37},1130624,"工程施工期间承包商需向业主提供的担保有（ ）。",[517,519,521,523,525],{"key":20,"text":518,"correct":26},"投标担保",{"key":24,"text":520,"correct":22},"履约担保",{"key":28,"text":522,"correct":22},"预付款担保",{"key":31,"text":524,"correct":26},"质量担保",{"key":34,"text":526,"correct":26},"付款担保","BC",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":542,"analysis":37},1130625,"施工合同中，（ ）应由承包人完成。",[532,534,536,538,540],{"key":20,"text":533,"correct":26},"土地征用和拆迁",{"key":24,"text":535,"correct":22},"提供施工船舶的临时停泊设施",{"key":28,"text":537,"correct":26},"提供工程地质报告",{"key":31,"text":539,"correct":22},"保护施工现场地下管道和邻近建筑物及构筑物",{"key":34,"text":541,"correct":22},"提供相应的工程进度计划及统计报表","BDE",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":398,"analysis":37},1130626,"在中华人民共和国沿海水域从事扫海、疏浚、爆破、打桩、拔桩、起重、钻探等作业，必须事先向所涉及的海区的区域主管机关申请办理和发布（ ）。",[547,549,551,553,555],{"key":20,"text":548,"correct":22},"海上航行警告",{"key":24,"text":550,"correct":22},"航行通告",{"key":28,"text":552,"correct":26},"打桩令",{"key":31,"text":554,"correct":26},"施工许可证",{"key":34,"text":556,"correct":26},"疏浚令",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":542,"analysis":37},1130627,"进行使船舶航行能力受到限制的（ ）物品拖带作业，必须事先向所涉及的海区区域主管机关申请发布海上航行警告、航行通告。",[561,563,565,567,569],{"key":20,"text":562,"correct":26},"易燃",{"key":24,"text":564,"correct":22},"超长",{"key":28,"text":566,"correct":26},"易爆",{"key":31,"text":568,"correct":22},"笨重",{"key":34,"text":570,"correct":22},"超高",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":82,"analysis":37},1130628,"海上航行警告和航行通告书面申请应当包括（ ）等内容。",[575,577,579,581,583],{"key":20,"text":576,"correct":22},"活动起止日期和每日活动时间",{"key":24,"text":578,"correct":22},"活动内容和活动方式",{"key":28,"text":580,"correct":22},"参加活动的船舶、设施和单位的名称",{"key":31,"text":582,"correct":22},"活动区域、安全措施",{"key":34,"text":584,"correct":26},"人员基本情况、技术质量保证措施",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":97,"analysis":37},1130629,"各级海事管理机构在以文件发布沿航行通告的同时，需将航行通告通过中国海事局网站向社会公布。还可以（ ）发布本区域航行通告。",[589,591,593,595,597],{"key":20,"text":590,"correct":22},"在本单位网站发布",{"key":24,"text":592,"correct":22},"发送传真或邮寄",{"key":28,"text":594,"correct":22},"微信发布或宣传栏张贴",{"key":31,"text":596,"correct":26},"无线电话发布",{"key":34,"text":598,"correct":22},"电子邮件",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":82,"analysis":37},1130630,"港口与航道工程项目技术管理的主要内容包括（ ）。",[603,605,607,609,611],{"key":20,"text":604,"correct":22},"技术策划",{"key":24,"text":606,"correct":22},"典型施工",{"key":28,"text":608,"correct":22},"技术交流",{"key":31,"text":610,"correct":22},"内业技术资料",{"key":34,"text":612,"correct":26},"产值统计",{"id":614,"libraryId":5,"type":15,"typeLabel":16,"stem":615,"options":616,"answer":313,"analysis":37},1130631,"港口与航道工程项目技术管理的作用有（ ）。",[617,619,621,623,625],{"key":20,"text":618,"correct":22},"保证施工全过程符合规范要求",{"key":24,"text":620,"correct":26},"保证施工组织设计及时直接报送监理",{"key":28,"text":622,"correct":22},"不断提高项目施工和管理的技术水平",{"key":31,"text":624,"correct":22},"开展项目的技术攻关",{"key":34,"text":626,"correct":22},"积极推广新技术",{"id":628,"libraryId":5,"type":15,"typeLabel":16,"stem":629,"options":630,"answer":97,"analysis":37},1130632,"港口与航道工程的图纸会审，参加单位应包括（ ）。",[631,633,635,637,639],{"key":20,"text":632,"correct":22},"总包施工单位",{"key":24,"text":634,"correct":22},"分包施工单位",{"key":28,"text":636,"correct":22},"设计单位",{"key":31,"text":638,"correct":26},"质检单位",{"key":34,"text":640,"correct":22},"监理单位",{"id":642,"libraryId":5,"type":15,"typeLabel":16,"stem":643,"options":644,"answer":383,"analysis":37},1130633,"技术策划应在下列（ ）的基础上进行。",[645,647,649,651,653],{"key":20,"text":646,"correct":22},"充分理解合同文件与设计文件",{"key":24,"text":648,"correct":22},"施工调查完成",{"key":28,"text":650,"correct":22},"项目部自身资源及技术条件具备",{"key":31,"text":652,"correct":26},"开工报告已批准",{"key":34,"text":654,"correct":26},"项目已经正式开工",{"id":656,"libraryId":5,"type":15,"typeLabel":16,"stem":657,"options":658,"answer":52,"analysis":37},1130634,"技术交底的主要内容有（ ）。",[659,661,663,665,667],{"key":20,"text":660,"correct":22},"图纸内容和设计要求",{"key":24,"text":662,"correct":26},"施工总包与分包、与业主的协调工作内容",{"key":28,"text":664,"correct":22},"分项工程交底",{"key":31,"text":666,"correct":26},"与地方和质检部门的公关关系",{"key":34,"text":668,"correct":22},"设计变更",{"id":670,"libraryId":5,"type":15,"typeLabel":16,"stem":671,"options":672,"answer":683,"analysis":37},1130635,"工程竣工后，要搞好工程的技术总结，主要要抓好（ ）。",[673,675,677,679,681],{"key":20,"text":674,"correct":22},"技术总结的主要内容",{"key":24,"text":676,"correct":26},"确定项目经济效益后进行技术总结",{"key":28,"text":678,"correct":22},"确定技术总结题材",{"key":31,"text":680,"correct":22},"积累、收集好素材和资料",{"key":34,"text":682,"correct":26},"施工体会、经验及值得改进处和改进措施的总结","ACD",{"id":685,"libraryId":5,"type":15,"typeLabel":16,"stem":686,"options":687,"answer":97,"analysis":37},1130636,"危险性较大的分部分项工程施工前应编制安全专项施工方案，下列选项中属于方案编制内容的有（ ）。",[688,690,692,694,696],{"key":20,"text":689,"correct":22},"施工计划",{"key":24,"text":691,"correct":22},"计算书",{"key":28,"text":693,"correct":22},"编制依据",{"key":31,"text":695,"correct":26},"临时工程",{"key":34,"text":697,"correct":22},"劳动力计划",{"id":699,"libraryId":5,"type":15,"typeLabel":16,"stem":700,"options":701,"answer":398,"analysis":37},1130637,"水运建设工程质量事故根据（ ）分为四级。",[702,704,706,708,710],{"key":20,"text":703,"correct":22},"直接经济损失",{"key":24,"text":705,"correct":22},"工程结构损毁情况",{"key":28,"text":707,"correct":26},"间接经济损失",{"key":31,"text":709,"correct":26},"工程损毁情况",{"key":34,"text":711,"correct":26},"经济损失",{"id":713,"libraryId":5,"type":15,"typeLabel":16,"stem":714,"options":715,"answer":527,"analysis":37},1130638,"重大质量事故是指（ ）的事故。",[716,718,720,722,724],{"key":20,"text":717,"correct":26},"造成直接经济损失1亿元以上的",{"key":24,"text":719,"correct":22},"造成直接经济损失5000万元以上1亿元以下",{"key":28,"text":721,"correct":22},"大型水运工程主体结构垮塌、报废",{"key":31,"text":723,"correct":26},"造成直接经济损失1000万元以上5000万元以下",{"key":34,"text":725,"correct":26},"中型水运工程主体结构垮塌、报废",{"id":727,"libraryId":5,"type":15,"typeLabel":16,"stem":728,"options":729,"answer":740,"analysis":37},1130639,"在下列质量事故中，发生（ ）时，省级交通运输主管部门应在接报2小时内进一步核实，并按规定上报。",[730,732,734,736,738],{"key":20,"text":731,"correct":26},"一般质量事故",{"key":24,"text":733,"correct":22},"特别重大质量事故",{"key":28,"text":735,"correct":26},"较大质量事故",{"key":31,"text":737,"correct":22},"重大质量事故",{"key":34,"text":739,"correct":26},"超大质量事故","BD",[742,746,749,752,755,758],{"id":743,"name":744,"category":7,"favorite":745},1,"领导干部任职前廉政法规知识测试题",92,{"id":747,"name":748,"category":7,"favorite":743},595,"建筑结构与设备",{"id":750,"name":751,"category":7,"favorite":743},715,"招标采购专业知识与法律法规",{"id":753,"name":754,"category":7,"favorite":743},848,"市政方向-通用基础",{"id":756,"name":757,"category":7,"favorite":8},534,"BIM工程师",{"id":759,"name":757,"category":7,"favorite":8},535]