[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-794-20":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":741},{"id":5,"name":6,"category":7,"favorite":8},794,"一建港口与航道工程实务","建筑工程",0,20,50,1132,[13,38,53,68,83,97,111,126,141,155,169,183,198,213,228,242,256,270,285,299,313,326,341,356,368,382,397,411,425,439,453,468,482,497,512,526,540,554,568,582,597,612,626,640,654,669,683,698,712,727],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1130538,2,"多选题","关于地基处理，以下说法正确的是（ ）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","排水固结法分为堆载预压法和真空预压法两类",true,{"key":24,"text":25,"correct":22},"B","竖向排水通道深度至少应超过最危险滑动面2m",{"key":27,"text":28,"correct":29},"C","一般土质条件下，抽真空3个月固结度可达到85% - 90% ，堆载预压法达到同样固结度需3个月以上",false,{"key":31,"text":32,"correct":22},"D","真空预压法，在满足真空度要求的条件下，应连续抽气，当沉降稳定后，方可停泵卸载",{"key":34,"text":35,"correct":22},"E","真空预压沉降稳定的标准是：实测地面沉降速率连续5～10d平均沉降量不大于2mm／d","ABDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1130539,"振冲密实法加填料时，应为质地坚硬的（ ）、角砾、圆砾、砾砂等，粒径宜小于50mm。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"粗砂",{"key":24,"text":45,"correct":29},"细砂",{"key":27,"text":47,"correct":22},"卵石",{"key":31,"text":49,"correct":29},"块石",{"key":34,"text":51,"correct":22},"碎石","ACE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1130540,"对不加填料振冲密实法的砂土地基，宜用标准贯入试验检验处理效果，检验点应位于（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"有代表性的地基上",{"key":24,"text":60,"correct":22},"相邻振冲点围成单元",{"key":27,"text":62,"correct":29},"振冲点的中心处",{"key":31,"text":64,"correct":29},"振冲孔的边缘处",{"key":34,"text":66,"correct":29},"随机选的点位处","AB",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1130541,"水下深层水泥搅拌法（简称CDM工法）加固软土地基具有（ ）、无公害等优点，已在我国数项大型码头工程中得到应用。",[72,74,76,78,80],{"key":20,"text":73,"correct":29},"费用低",{"key":24,"text":75,"correct":29},"不需专用设备",{"key":27,"text":77,"correct":22},"快速",{"key":31,"text":79,"correct":29},"不需专用船舶",{"key":34,"text":81,"correct":22},"高强","CE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":36,"analysis":37},1130542,"爆炸排淤填石法爆炸设计时应考虑当地的（ ）及周围环境条件。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"地形",{"key":24,"text":90,"correct":22},"水文",{"key":27,"text":92,"correct":29},"人文",{"key":31,"text":94,"correct":22},"地质",{"key":34,"text":96,"correct":22},"气象",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":82,"analysis":37},1130543,"采用爆破排淤填石法改良地基时，爆破排淤设计一定要根据堤身设计断面要求确定合适的堤身抛填施工参数，如堤石抛填标高、（ ）、堤头超抛高度等。",[101,103,105,107,109],{"key":20,"text":102,"correct":29},"一次爆破药量",{"key":24,"text":104,"correct":29},"单孔药量",{"key":27,"text":106,"correct":22},"一次推进距离",{"key":31,"text":108,"correct":29},"布药孔数",{"key":34,"text":110,"correct":22},"堤石抛填宽度",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":125,"analysis":37},1130544,"管涌与流沙（土）防治的基本方法中，人工降低地下水位是最常见的临时防渗措施，在施工期处理管涌、流沙（土）时也常采取这一最简单易行的办法。该法可以降低水头，或使地下水位降至渗透变形土层以下。在弱透水层中采用（ ）。",[115,117,119,121,123],{"key":20,"text":116,"correct":29},"深井法",{"key":24,"text":118,"correct":22},"轻型井点",{"key":27,"text":120,"correct":22},"喷射井点",{"key":31,"text":122,"correct":29},"挖排水沟",{"key":34,"text":124,"correct":29},"打塑料排水板","BC",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},1130545,"港航工程钢结构防腐的主要方法中，外壁涂覆涂层法主要适用于结构的（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"大气区",{"key":24,"text":133,"correct":22},"浪溅区",{"key":27,"text":135,"correct":22},"水位变动区",{"key":31,"text":137,"correct":29},"水下区",{"key":34,"text":139,"correct":29},"泥下区","ABC",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":36,"analysis":37},1130546,"港口航道工程测量施工基线的设置规定包括（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"基线应与建筑物主轴线、前沿线平行或垂直",{"key":24,"text":148,"correct":22},"长度不应小于放样视线长度的0．7倍",{"key":27,"text":150,"correct":29},"长度不应小于放样视线长度的1倍",{"key":31,"text":152,"correct":22},"基线应与测区基本控制网进行联测",{"key":34,"text":154,"correct":22},"基线上设置的放样控制点的点位精度不应低于施工基线测设精度",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":140,"analysis":37},1130547,"港口与航道工程水工建筑水平位移可采用交会法进行观测，以下说法正确的是（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"当采用交会法进行水平位移观测时，其交会方向不宜少于3个",{"key":24,"text":162,"correct":22},"当采用测角交会法进行水平位移观测时，交会角应在60°～120°之间",{"key":27,"text":164,"correct":22},"当采用测边交会法进行水平位移观测时，交会角宜在30°～150°之间",{"key":31,"text":166,"correct":29},"当采用交会法进行水平位移观测时，其交会方向不宜大于3个",{"key":34,"text":168,"correct":29},"当采用交会法进行水平位移观测时，其交会角不作规定",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":125,"analysis":37},1130548,"大体积混凝土中所埋放的块石距混凝土结构物表面的距离应符合下列规定：（ ）。",[173,175,177,179,181],{"key":20,"text":174,"correct":29},"有钢筋锈蚀要求的，不得小于300mm",{"key":24,"text":176,"correct":22},"有抗冻性要求的，不得小于300mm",{"key":27,"text":178,"correct":22},"无抗冻性要求的，不得小于100mm或混凝土粗骨料最大粒径的2倍",{"key":31,"text":180,"correct":29},"无抗冻性要求的，不得小于200mm或混凝土粗骨料最大粒径的3倍",{"key":34,"text":182,"correct":29},"无钢筋锈蚀要求的，不得小于200mm",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":197,"analysis":37},1130550,"在淤泥质海岸，波浪作用下产生的浮泥有（ ）特性，会增加随潮进入港区和航道的泥沙数量。",[187,189,191,193,195],{"key":20,"text":188,"correct":22},"自身可能流动",{"key":24,"text":190,"correct":22},"易为潮流掀扬",{"key":27,"text":192,"correct":29},"黏性",{"key":31,"text":194,"correct":29},"重度大",{"key":34,"text":196,"correct":22},"转化为悬移质","ABE",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":212,"analysis":37},1130551,"海岸带泥沙运动的一般规律是（ ）。",[202,204,206,208,210],{"key":20,"text":203,"correct":22},"砂质海岸的泥沙运移形态有推移和悬移两种",{"key":24,"text":205,"correct":22},"淤泥质海岸的泥沙运移形态以悬移为主",{"key":27,"text":207,"correct":22},"淤泥质海岸对较细颗粒的海岸底部可能有浮泥运动，对较粗颗粒的海岸底部有推移质运动",{"key":31,"text":209,"correct":29},"淤泥质海岸对较细颗粒的海岸底部可能有推移质运动，对较粗颗粒海岸底部有浮泥运动",{"key":34,"text":211,"correct":22},"海岸带泥沙运动方式可分为与海岸线垂直的横向运动和与海岸线平行的纵向运动","ABCE",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":227,"analysis":37},1130552,"航道疏浚工程吹填区内的钻孔深度应根据（ ）等因素确定。",[217,219,221,223,225],{"key":20,"text":218,"correct":22},"吹填厚度",{"key":24,"text":220,"correct":22},"现场地质情况",{"key":27,"text":222,"correct":22},"岩土特性",{"key":31,"text":224,"correct":22},"围堰的作用与结构",{"key":34,"text":226,"correct":29},"吹填高程","ABCD",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":227,"analysis":37},1130553,"机织土工布有（ ）。",[232,234,236,238,240],{"key":20,"text":233,"correct":22},"加筋功能",{"key":24,"text":235,"correct":22},"隔离功能",{"key":27,"text":237,"correct":22},"反滤功能",{"key":31,"text":239,"correct":22},"防护功能",{"key":34,"text":241,"correct":29},"防渗功能",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":36,"analysis":37},1130554,"港口与航道工程常用土工织物的主要性能指标有（ ）。",[246,248,250,252,254],{"key":20,"text":247,"correct":22},"产品形态指标",{"key":24,"text":249,"correct":22},"力学性能指标",{"key":27,"text":251,"correct":29},"景观性能指标",{"key":31,"text":253,"correct":22},"水力学性能指标",{"key":34,"text":255,"correct":22},"耐久性指标",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":52,"analysis":37},1130555,"爆破排淤填石法形成抛石堤一般要经过（ ）等过程。",[260,262,264,266,268],{"key":20,"text":261,"correct":22},"爆破形成平台及堤心断面（边坡爆夯）",{"key":24,"text":263,"correct":29},"施工测量",{"key":27,"text":265,"correct":22},"侧坡拓宽排淤落底（边坡爆填）",{"key":31,"text":267,"correct":29},"挖除淤泥",{"key":34,"text":269,"correct":22},"端部推进排淤（端部爆填）",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":284,"analysis":37},1130556,"采用爆破排淤填石法改良地基时，必须进行爆破安全设计，应分别按（ ）等爆破效应核算爆破源与被保护对象的安全距离，并取较大值。",[274,276,278,280,282],{"key":20,"text":275,"correct":29},"炸药用量",{"key":24,"text":277,"correct":22},"飞散物",{"key":27,"text":279,"correct":29},"一次用药量",{"key":31,"text":281,"correct":22},"冲击波",{"key":34,"text":283,"correct":22},"地震波","BDE",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":52,"analysis":37},1130557,"施工平面控制网可采用（ ）等形式进行布设。",[289,291,293,295,297],{"key":20,"text":290,"correct":22},"三角形网",{"key":24,"text":292,"correct":29},"平面网",{"key":27,"text":294,"correct":22},"导线网",{"key":31,"text":296,"correct":29},"蜂窝网",{"key":34,"text":298,"correct":22},"GPS网",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":212,"analysis":37},1130558,"港口航道工程测量建立矩形施工控制网的规定包括（ ）。",[303,305,307,309,311],{"key":20,"text":304,"correct":22},"边长宜为100～200m",{"key":24,"text":306,"correct":22},"轴线方向与施工坐标轴线方向一致",{"key":27,"text":308,"correct":22},"矩形施工控制网的原点及轴线方位应与整个平面坐标系联测",{"key":31,"text":310,"correct":29},"边长宜为300～500m",{"key":34,"text":312,"correct":22},"矩形施工控制网轴线点位中误差不应大于50mm",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":197,"analysis":37},1130559,"港口与航道工程监测网的布设规定中，平面控制网可采用（ ）等形式，受地形条件限制时，可布设成导线网形式。",[317,318,320,322,324],{"key":20,"text":298,"correct":22},{"key":24,"text":319,"correct":22},"边角网",{"key":27,"text":321,"correct":29},"方形网",{"key":31,"text":323,"correct":29},"建筑方格网",{"key":34,"text":325,"correct":22},"三角网",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":340,"analysis":37},1130560,"对于混凝土拌合物运送至浇筑地点时出现离析、分层或稠度不满足要求的处理，正确的方法有（ ）。",[330,332,334,336,338],{"key":20,"text":331,"correct":22},"对混凝土拌合物进行二次搅拌",{"key":24,"text":333,"correct":29},"少量加水二次搅拌",{"key":27,"text":335,"correct":22},"加入水和胶凝材料搅拌",{"key":31,"text":337,"correct":22},"保持水胶比不变",{"key":34,"text":339,"correct":29},"直接废弃","ACD",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":355,"analysis":37},1130561,"风的特征一般用（ ）的量值来表示的。",[345,347,349,351,353],{"key":20,"text":346,"correct":29},"风力",{"key":24,"text":348,"correct":22},"风速",{"key":27,"text":350,"correct":29},"风能",{"key":31,"text":352,"correct":22},"风向",{"key":34,"text":354,"correct":29},"风的加速度","BD",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":367,"analysis":37},1130562,"风玫瑰图是指用来表达风的（ ）等量的变化情况图。",[360,361,362,364,365],{"key":20,"text":346,"correct":29},{"key":24,"text":348,"correct":22},{"key":27,"text":363,"correct":22},"时间段",{"key":31,"text":352,"correct":22},{"key":34,"text":366,"correct":22},"频率","BCDE",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":212,"analysis":37},1130563,"港航工程钢筋混凝土结构用钢筋有（ ）。",[372,374,376,378,380],{"key":20,"text":373,"correct":22},"低碳钢热轧盘条",{"key":24,"text":375,"correct":22},"热轧光圆钢筋",{"key":27,"text":377,"correct":22},"热轧带肋钢筋",{"key":31,"text":379,"correct":29},"冷拉钢丝（级别为Ⅱ级）",{"key":34,"text":381,"correct":22},"冷拉钢筋",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":396,"analysis":37},1130564,"深层搅拌法适用于处理正常固结的淤泥和淤泥质土、饱和黄土、素填土、黏性土以及（ ）等地基，对于泥炭土、有机质土、塑性指数大于25的黏土、地下水有腐蚀性的地区，必须通过现场试验确定其适用性。",[386,388,390,392,394],{"key":20,"text":387,"correct":22},"无流动地下水的饱和松散砂土",{"key":24,"text":389,"correct":29},"有流动地下水的饱和松散砂土",{"key":27,"text":391,"correct":29},"无流动地下水的密实砂土",{"key":31,"text":393,"correct":29},"有流动地下水的密实砂土",{"key":34,"text":395,"correct":22},"粉土","AE",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":227,"analysis":37},1130565,"深层搅拌法大型工程设计前应先进行室内配合比试验，并应选在正式工程附近，地质条件相近的地点进行现场试验工程，检验（ ），以及搅拌设备系统工作的稳定性。",[401,403,405,407,409],{"key":20,"text":402,"correct":22},"搅拌土体的均匀性",{"key":24,"text":404,"correct":22},"搅拌土体的强度",{"key":27,"text":406,"correct":22},"搅拌土体着底标准",{"key":31,"text":408,"correct":22},"搅拌土体的结合性",{"key":34,"text":410,"correct":29},"搅拌土体的和易性",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":212,"analysis":37},1130566,"《航道建设管理规定》第四十二条规定县级以上交通主管部门应当建立工程质量和安全事故举报制度。任何单位和个人发现（ ）等应当向有关主管部门举报。",[415,417,419,421,423],{"key":20,"text":416,"correct":22},"质量事故",{"key":24,"text":418,"correct":22},"质量缺陷",{"key":27,"text":420,"correct":22},"安全事故",{"key":31,"text":422,"correct":29},"质量一般",{"key":34,"text":424,"correct":22},"安全隐患",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":52,"analysis":37},1130567,"《水运建设市场监督管理办法》第十七条规定施工单位经项目单位同意，可以将（ ）分包给具有相应资质条件的单位承担。",[429,431,433,435,437],{"key":20,"text":430,"correct":22},"非主体工程",{"key":24,"text":432,"correct":29},"分部工程",{"key":27,"text":434,"correct":22},"非关键性工程",{"key":31,"text":436,"correct":29},"单项工程",{"key":34,"text":438,"correct":22},"适合专业化施工的工程",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":36,"analysis":37},1130568,"《公路水运工程安全生产监督管理办法》第四十条规定施工单位应当建立健全安全生产技术分级交底制度，明确安全技术分级交底的（ ）。",[443,445,447,449,451],{"key":20,"text":444,"correct":22},"方法",{"key":24,"text":446,"correct":22},"确认手续",{"key":27,"text":448,"correct":29},"人员",{"key":31,"text":450,"correct":22},"内容",{"key":34,"text":452,"correct":22},"原则",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":467,"analysis":37},1130569,"《公路水运工程安全生产监督管理办法》第五十五条规定从业单位及相关责任人违反本办法规定，逾期未改正的，对从业单位处1万元以上3万元以下的罚款，下列适用此条款的行为有（ ）。",[457,459,461,463,465],{"key":20,"text":458,"correct":29},"未按照规定配备安全生产管理人员的",{"key":24,"text":460,"correct":29},"未按照规定设置安全生产管理机构的",{"key":27,"text":462,"correct":29},"主要负责人和安全生产管理人员未按照规定经考核合格的",{"key":31,"text":464,"correct":22},"未按批准的专项施工方案进行施工，导致重大事故隐患的",{"key":34,"text":466,"correct":22},"从业单位未全面履行安全生产责任，导致重大事故隐患的","DE",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":227,"analysis":37},1130570,"《中华人民共和国船舶及其有关作业活动污染海洋环境防治管理规定》第五十三条规定违反本规定，船舶排放或者处置污染物处2万元以上10万元以下的罚款，下列适用此条款的行为有（ ）。",[472,474,476,478,480],{"key":20,"text":473,"correct":22},"超过标准向海域排放污染物的",{"key":24,"text":475,"correct":22},"未按照规定在船上留存船舶污染物排放记录的",{"key":27,"text":477,"correct":22},"未按照规定在船上留存船舶污染物处置记录的",{"key":31,"text":479,"correct":22},"船舶污染物处置记录与船舶运行过程中产生的污染物数量不符合的",{"key":34,"text":481,"correct":29},"未按照规定在船上留存船舶污染物排放样品的",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":496,"analysis":37},1130571,"《中华人民共和国港口法》第四十五条规定（ ）由县级以上地方人民政府或者港口行政管理部门责令限期改正；逾期不改正的，由作出限期改正决定的机关申请人民法院强制拆除违法建设的设施；可以处5万元以下罚款。",[486,488,490,492,494],{"key":20,"text":487,"correct":29},"使用非深水岸线，未经国务院交通主管部门会同国务院经济综合宏观调控部门批准的",{"key":24,"text":489,"correct":22},"未经依法批准，建设港口设施使用港口岸线的",{"key":27,"text":491,"correct":29},"船舶携带危险品进出港未办理申请手续的",{"key":31,"text":493,"correct":29},"商检设施和卫生检疫设施未与主体工程同时设计、同时施工、同时投入使用的",{"key":34,"text":495,"correct":22},"违反港口规划建设港口、码头或者其他港口设施的","BE",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":511,"analysis":37},1130572,"《中华人民共和国航道法》第四十三条规定在河道内未按批准的（ ）采砂等非法采砂的，依照有关法律、行政法规的规定处罚。",[501,503,505,507,509],{"key":20,"text":502,"correct":22},"采砂范围",{"key":24,"text":504,"correct":29},"采砂运距",{"key":27,"text":506,"correct":29},"卸砂位置",{"key":31,"text":508,"correct":22},"采砂作业方式",{"key":34,"text":510,"correct":29},"卸砂作业方式","AD",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":212,"analysis":37},1130573,"《港口建设管理规定》第三十三条规定港口工程实行（ ）的质量保证体系。",[516,518,520,522,524],{"key":20,"text":517,"correct":22},"政府监督",{"key":24,"text":519,"correct":22},"法人负责",{"key":27,"text":521,"correct":22},"社会监理",{"key":31,"text":523,"correct":29},"第三方抽检",{"key":34,"text":525,"correct":22},"企业自检",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":67,"analysis":37},1130574,"《航道建设管理规定》第三十一条规定航道建设项目单位以及其委托的（ ）、主要负责人员，应当具备满足拟建项目管理需要的技术和管理能力。",[530,532,534,536,538],{"key":20,"text":531,"correct":22},"项目建设管理单位",{"key":24,"text":533,"correct":22},"项目建设管理机构",{"key":27,"text":535,"correct":29},"项目建设使用单位",{"key":31,"text":537,"correct":29},"项目建设质检机构",{"key":34,"text":539,"correct":29},"项目建设监理单位",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":355,"analysis":37},1130575,"《水运建设市场监督管理办法》第二十条规定（ ）应当加强工程款管理，专款专用。",[544,546,548,550,552],{"key":20,"text":545,"correct":29},"监理单位",{"key":24,"text":547,"correct":22},"项目单位",{"key":27,"text":549,"correct":29},"主管部门",{"key":31,"text":551,"correct":22},"施工单位",{"key":34,"text":553,"correct":29},"代建单位",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":82,"analysis":37},1130576,"《水运建设市场监督管理办法》第三十八条规定施工单位允许其他单位或者个人以本单位名义承揽工程的，下列罚款标准正确的有（ ）。",[558,560,562,564,566],{"key":20,"text":559,"correct":29},"允许无相应资质的处工程合同价款1％以上2％以下的罚款",{"key":24,"text":561,"correct":29},"允许无相应资质的处工程合同价款2％以上3％以下的罚款",{"key":27,"text":563,"correct":22},"允许无相应资质的处工程合同价款3％以上4％以下的罚款",{"key":31,"text":565,"correct":29},"允许有相应资质并符合本工程建设要求的，处工程合同价款1％以上2％以下的罚款",{"key":34,"text":567,"correct":22},"允许有相应资质并符合本工程建设要求的，处工程合同价款2％以上3％以下的罚款",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":227,"analysis":37},1130577,"《公路水运工程安全生产监督管理办法》第三十五条规定项目负责人对项目安全生产工作负有的职责有（ ）。",[572,574,576,578,580],{"key":20,"text":573,"correct":22},"组织制定项目安全生产规章制度和操作规程",{"key":24,"text":575,"correct":22},"组织制定项目安全生产教育和培训计划",{"key":27,"text":577,"correct":22},"及时、如实报告生产安全事故并组织自救",{"key":31,"text":579,"correct":22},"督促项目安全生产费用的规范使用",{"key":34,"text":581,"correct":29},"督促落实本单位施工安全风险管控措施",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":596,"analysis":37},1130578,"隐蔽工程在隐蔽前应（ ）。",[586,588,590,592,594],{"key":20,"text":587,"correct":22},"自检合格",{"key":24,"text":589,"correct":22},"通知有关单位验收",{"key":27,"text":591,"correct":29},"通知建设单位检验",{"key":31,"text":593,"correct":22},"形成验收文件",{"key":34,"text":595,"correct":29},"通知监理验收","ABD",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":611,"analysis":37},1130579,"工程观感质量应按（ ）进行。",[601,603,605,607,609],{"key":20,"text":602,"correct":22},"验收人员现场检查",{"key":24,"text":604,"correct":29},"必要的测量",{"key":27,"text":606,"correct":22},"验收人员共同确认",{"key":31,"text":608,"correct":29},"评分（10分制）制",{"key":34,"text":610,"correct":29},"典型区域检查法","AC",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":284,"analysis":37},1130580,"单位工程质量合格标准包括（ ）。",[616,618,620,622,624],{"key":20,"text":617,"correct":29},"所含分部工程质量合格率达到90％以上",{"key":24,"text":619,"correct":22},"所含分部工程质量全部合格",{"key":27,"text":621,"correct":29},"所含分部工程质量合格率达到80％以上",{"key":31,"text":623,"correct":22},"主要功能项目抽检结果符合相关规定",{"key":34,"text":625,"correct":22},"观感质量符合规范要求",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":611,"analysis":37},1130581,"工程建设标准强制性条文中《重力式码头设计与施工规范》JTS 167-2-2009第2．3．3条规定，重力式码头抛石基床的厚度应遵守的规定有（ ）。",[630,632,634,636,638],{"key":20,"text":631,"correct":22},"当基床顶面应力大于地基承载力时，由地基承载力计算确定，并不小于1．0m",{"key":24,"text":633,"correct":29},"当基床顶面应力大于地基承载力时，由地基承载力计算确定，并不小于2．0m",{"key":27,"text":635,"correct":22},"当基床顶面应力不大于地基承载力时，不小于0．5m",{"key":31,"text":637,"correct":29},"当基床顶面应力不大于地基承载力时，不小于1．0m",{"key":34,"text":639,"correct":29},"无论基床顶面应力大于地基承载力还是不大于地基承载力，均必须由计算确定，并不小于2．0m",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":212,"analysis":37},1130582,"船闸工程施工期间应进行观测和监测的项目有（ ）。",[644,646,648,650,652],{"key":20,"text":645,"correct":22},"地下水位观测",{"key":24,"text":647,"correct":22},"施工围堰位移观测",{"key":27,"text":649,"correct":22},"施工基坑位移观测",{"key":31,"text":651,"correct":29},"施工基坑裂缝观测",{"key":34,"text":653,"correct":22},"船闸水工结构的沉降观测",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":668,"analysis":37},1130583,"下列关于碳素结构钢和低合金结构钢冷矫正、加热矫正和冷弯曲的说法正确的有（ ）。",[658,660,662,664,666],{"key":20,"text":659,"correct":29},"碳素结构钢在环境温度低于-12℃时，不应进行冷矫正",{"key":24,"text":661,"correct":29},"低合金结构钢在环境温度低于-16℃时，不应进行冷弯曲",{"key":27,"text":663,"correct":22},"碳素结构钢在加热矫正时，加热温度不应超过900℃",{"key":31,"text":665,"correct":22},"低合金结构钢在加热矫正后应自然冷却",{"key":34,"text":667,"correct":22},"低合金结构钢在加热矫正时，加热温度不应超过900℃","CDE",{"id":670,"libraryId":5,"type":15,"typeLabel":16,"stem":671,"options":672,"answer":140,"analysis":37},1130584,"疏浚工程设计时计算的工程量，包括（ ）。",[673,675,677,679,681],{"key":20,"text":674,"correct":22},"设计断面工程量",{"key":24,"text":676,"correct":22},"计算超宽量",{"key":27,"text":678,"correct":22},"计算超深量",{"key":31,"text":680,"correct":29},"施工期回淤量",{"key":34,"text":682,"correct":29},"骤淤量",{"id":684,"libraryId":5,"type":15,"typeLabel":16,"stem":685,"options":686,"answer":697,"analysis":37},1130585,"工程量清单的组成包括（ ）。",[687,689,691,693,695],{"key":20,"text":688,"correct":29},"招标人指定项目清单",{"key":24,"text":690,"correct":22},"分项工程项目清单",{"key":27,"text":692,"correct":22},"一般项目清单",{"key":31,"text":694,"correct":29},"特种项目清单",{"key":34,"text":696,"correct":22},"计日工项目清单","BCE",{"id":699,"libraryId":5,"type":15,"typeLabel":16,"stem":700,"options":701,"answer":67,"analysis":37},1130586,"疏浚工程量计算时应考虑（ ）。",[702,704,706,708,710],{"key":20,"text":703,"correct":22},"超深",{"key":24,"text":705,"correct":22},"超宽",{"key":27,"text":707,"correct":29},"流失",{"key":31,"text":709,"correct":29},"沉降",{"key":34,"text":711,"correct":29},"回淤",{"id":713,"libraryId":5,"type":15,"typeLabel":16,"stem":714,"options":715,"answer":726,"analysis":37},1130587,"符合工程计量程序的工作是（ ）。",[716,718,720,722,724],{"key":20,"text":717,"correct":29},"承包人依据工程量清单要求监理签认",{"key":24,"text":719,"correct":29},"承包人负责的任何工作",{"key":27,"text":721,"correct":22},"施工单位按规定向监理工程师提交完成的工作量报表",{"key":31,"text":723,"correct":22},"监理工程师在规定时间内对收到的报表审核签认",{"key":34,"text":725,"correct":29},"监理工程师未向承包商通知而自行测量的工作量","CD",{"id":728,"libraryId":5,"type":15,"typeLabel":16,"stem":729,"options":730,"answer":36,"analysis":37},1130588,"综合单价是完成工程量清单中一个质量合格的规定计量单位项目所需的（ ）的价格。",[731,733,735,737,739],{"key":20,"text":732,"correct":22},"直接费",{"key":24,"text":734,"correct":22},"间接费",{"key":27,"text":736,"correct":29},"专项费用",{"key":31,"text":738,"correct":22},"利润和税金",{"key":34,"text":740,"correct":22},"风险因素费用",[742,746,749,752,755,758],{"id":743,"name":744,"category":7,"favorite":745},1,"领导干部任职前廉政法规知识测试题",92,{"id":747,"name":748,"category":7,"favorite":743},595,"建筑结构与设备",{"id":750,"name":751,"category":7,"favorite":743},715,"招标采购专业知识与法律法规",{"id":753,"name":754,"category":7,"favorite":743},848,"市政方向-通用基础",{"id":756,"name":757,"category":7,"favorite":8},534,"BIM工程师",{"id":759,"name":757,"category":7,"favorite":8},535]