[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-794-18":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":728},{"id":5,"name":6,"category":7,"favorite":8},794,"一建港口与航道工程实务","建筑工程",0,18,50,1132,[13,38,53,68,83,98,113,128,142,157,171,186,199,213,227,239,252,266,281,296,310,325,340,355,369,383,397,411,425,439,453,467,481,495,510,525,539,553,567,581,595,609,622,636,647,661,675,689,703,714],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1130437,2,"多选题","排水盲沟开挖应（ ），其断面尺寸应满足设计要求。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","分片分段",true,{"key":24,"text":25,"correct":26},"B","自上而下",false,{"key":28,"text":29,"correct":26},"C","分条分段",{"key":31,"text":32,"correct":22},"D","自下而上",{"key":34,"text":35,"correct":26},"E","分层分段","AD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1130438,"下列关于陆上开挖、弃渣的施工说法，正确的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"开挖施工由高到低开挖至设计底高",{"key":24,"text":45,"correct":26},"开挖施工从里向外开挖至设计底高",{"key":28,"text":47,"correct":22},"清渣施工应先挖运水面以上石渣",{"key":31,"text":49,"correct":22},"陆上弃渣高程应满足设计要求",{"key":34,"text":51,"correct":22},"陆上弃渣边坡应满足设计要求","ACDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1130439,"水下钻孔爆破施工船舶定位宜采用卫星定位系统，施工钻孔位置的偏差（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"内河不大于200mm",{"key":24,"text":60,"correct":26},"内河不大于300mm",{"key":28,"text":62,"correct":26},"沿海不大于200mm",{"key":31,"text":64,"correct":26},"沿海不大于300mm",{"key":34,"text":66,"correct":22},"沿海不大于400mm","AE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1130440,"耙吸挖泥船施工应根据开挖的土质选择合理的挖泥对地航速，对于2．0～2．5kn的挖泥对地航速适应的土质有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"黏性土",{"key":24,"text":75,"correct":22},"淤泥",{"key":28,"text":77,"correct":22},"淤泥类土",{"key":31,"text":79,"correct":22},"松散砂",{"key":34,"text":81,"correct":26},"中密砂","BCD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1130441,"耙吸船装舱施工的施工运转小时生产率与（ ）有关。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"空载航行段长度",{"key":24,"text":90,"correct":26},"避让",{"key":28,"text":92,"correct":22},"重载航行段长度",{"key":31,"text":94,"correct":26},"检修",{"key":34,"text":96,"correct":22},"抛泥及抛泥时的转头时间","ACE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},1130442,"影响绞吸式挖泥船吸输生产率的主要设备因素包括（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"泥泵特性",{"key":24,"text":105,"correct":22},"管路特性",{"key":28,"text":107,"correct":26},"横移绞车功率",{"key":31,"text":109,"correct":26},"起桥绞车功率",{"key":34,"text":111,"correct":26},"土质","AB",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},1130443,"绞吸式挖泥船分层施工时上层挖泥宜较厚、最后一层应较薄，其目的是（ ）。",[117,119,121,123,125],{"key":20,"text":118,"correct":26},"保证挖宽",{"key":24,"text":120,"correct":26},"提高时间利用率",{"key":28,"text":122,"correct":22},"保证质量",{"key":31,"text":124,"correct":26},"保证安全",{"key":34,"text":126,"correct":22},"保证挖泥船的效能","CE",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":141,"analysis":37},1130444,"绞吸式挖泥船的绞刀应根据疏浚土类及其密实度选择，冠形固定方齿绞刀适用于开挖（ ）等土质。",[132,134,135,137,139],{"key":20,"text":133,"correct":26},"淤泥土类",{"key":24,"text":79,"correct":26},{"key":28,"text":136,"correct":22},"软塑黏土",{"key":31,"text":138,"correct":22},"可塑黏土",{"key":34,"text":140,"correct":22},"泥炭","CDE",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},1130445,"绞吸式挖泥船在（ ）情况下分层施工。",[146,148,150,152,154],{"key":20,"text":147,"correct":26},"施工干扰",{"key":24,"text":149,"correct":22},"挖泥船最大挖深在高潮挖不到设计深度时",{"key":28,"text":151,"correct":22},"当地水深在低潮不足挖泥船装载吃水时",{"key":31,"text":153,"correct":22},"当工程需要分期达到设计深度时",{"key":34,"text":155,"correct":22},"泥层厚度较厚时","BCDE",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":97,"analysis":37},1130446,"链斗挖泥船应在（ ）分段施工。",[161,163,165,167,169],{"key":20,"text":162,"correct":22},"挖槽边线为折线时",{"key":24,"text":164,"correct":26},"挖槽内泥层厚度相差较大时",{"key":28,"text":166,"correct":22},"挖槽规格不一时",{"key":31,"text":168,"correct":26},"挖槽内流速较大时",{"key":34,"text":170,"correct":22},"能避免或降低航行施工干扰时",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":185,"analysis":37},1130447,"链斗挖泥船艏锚布设应符合的规定有（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":26},"施工流速较大且稳定时可不设",{"key":24,"text":178,"correct":22},"宜下在挖泥中心线上",{"key":28,"text":180,"correct":26},"锚缆长度不宜低于400m",{"key":31,"text":182,"correct":22},"锚缆长度不宜低于500m",{"key":34,"text":184,"correct":22},"通过区为滩地时应设托缆滚筒","BDE",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":36,"analysis":37},1130448,"抓斗式挖泥船作业时应根据（ ）确定下斗间距和前移量。",[190,191,193,195,197],{"key":20,"text":111,"correct":22},{"key":24,"text":192,"correct":26},"挖宽",{"key":28,"text":194,"correct":26},"挖深",{"key":31,"text":196,"correct":22},"泥层厚度",{"key":34,"text":198,"correct":26},"斗容",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":212,"analysis":37},1130449,"抓斗式挖泥船生产率计算公式中的主要参数有（ ）。",[203,205,207,209,210],{"key":20,"text":204,"correct":22},"每小时抓取斗数",{"key":24,"text":206,"correct":22},"抓斗充泥系数",{"key":28,"text":208,"correct":22},"土的搅松系数",{"key":31,"text":194,"correct":26},{"key":34,"text":211,"correct":22},"抓斗容积","ABCE",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":52,"analysis":37},1130450,"抓斗挖泥船应根据不同土质选用不同类型的抓斗，抓斗类型分为（ ）。",[217,219,221,223,225],{"key":20,"text":218,"correct":22},"轻型平口抓斗",{"key":24,"text":220,"correct":26},"小型抓斗",{"key":28,"text":222,"correct":22},"中型抓斗",{"key":31,"text":224,"correct":22},"重型全齿抓斗",{"key":34,"text":226,"correct":22},"超重型抓斗",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":238,"analysis":37},1130451,"泥层厚度过大时应分层开挖，铲斗挖泥船分层厚度应根据（ ）确定。",[231,233,234,235,236],{"key":20,"text":232,"correct":22},"斗高",{"key":24,"text":198,"correct":26},{"key":28,"text":111,"correct":22},{"key":31,"text":194,"correct":26},{"key":34,"text":237,"correct":26},"前移距","AC",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":97,"analysis":37},1130452,"铲斗挖泥船的小容量带齿铲斗适用于（ ）。",[243,245,246,248,250],{"key":20,"text":244,"correct":22},"密实砂",{"key":24,"text":138,"correct":26},{"key":28,"text":247,"correct":22},"硬塑黏土",{"key":31,"text":249,"correct":26},"中等密实沙",{"key":34,"text":251,"correct":22},"中等密实碎石",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":265,"analysis":37},1130453,"设置于水上的接力泵船，应选择在（ ）等条件满足接力泵船安全要求，且对航行和施工干扰较小的区域。",[256,258,260,261,263],{"key":20,"text":257,"correct":22},"水深",{"key":24,"text":259,"correct":22},"风",{"key":28,"text":111,"correct":26},{"key":31,"text":262,"correct":22},"浪",{"key":34,"text":264,"correct":22},"流","ABDE",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":280,"analysis":37},1130454,"在环保疏浚工程中，绞吸挖泥船能够将（ ）等施工工序一次完成。",[270,272,274,276,278],{"key":20,"text":271,"correct":22},"挖掘",{"key":24,"text":273,"correct":22},"输送",{"key":28,"text":275,"correct":26},"脱水",{"key":31,"text":277,"correct":26},"固化",{"key":34,"text":279,"correct":22},"排出","ABE",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":295,"analysis":37},1130455,"在疏浚与吹填工程施工中，可采取的环保措施有（）。",[285,287,289,291,293],{"key":20,"text":286,"correct":26},"耙吸挖泥船耙头加高压冲水",{"key":24,"text":288,"correct":22},"泄水口设置防污帘",{"key":28,"text":290,"correct":26},"耙吸挖泥船延长溢流时间",{"key":31,"text":292,"correct":26},"绞吸挖泥船在泥泵吸口加格栅",{"key":34,"text":294,"correct":22},"耙吸挖泥船水下溢流","BE",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":36,"analysis":37},1130456,"吹填工程中，排水口的位置应根据（ ）、排泥管的布置、容泥量等因素确定。",[300,302,304,306,308],{"key":20,"text":301,"correct":22},"吹填区地形",{"key":24,"text":303,"correct":26},"吹填土的特性",{"key":28,"text":305,"correct":26},"吹填土的坡度",{"key":31,"text":307,"correct":22},"几何形状",{"key":34,"text":309,"correct":26},"吹填区范围",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":324,"analysis":37},1130457,"基坑排水方案应按（ ）等确定。",[314,316,318,320,322],{"key":20,"text":315,"correct":22},"基坑条件",{"key":24,"text":317,"correct":22},"基坑出水量",{"key":28,"text":319,"correct":22},"水文气象条件",{"key":31,"text":321,"correct":22},"闸室施工要求",{"key":34,"text":323,"correct":26},"降水深度","ABCD",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":339,"analysis":37},1130458,"爆炸夯实施工时，夯实率检查可分别选用（ ）等方法。",[329,331,333,335,337],{"key":20,"text":330,"correct":22},"水砣",{"key":24,"text":332,"correct":22},"测杆",{"key":28,"text":334,"correct":22},"测深仪",{"key":31,"text":336,"correct":26},"测绳",{"key":34,"text":338,"correct":26},"估算","ABC",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":354,"analysis":37},1130459,"基床整平按精度要求可分为（ ）。",[344,346,348,350,352],{"key":20,"text":345,"correct":22},"粗平",{"key":24,"text":347,"correct":22},"细平",{"key":28,"text":349,"correct":26},"微平",{"key":31,"text":351,"correct":22},"极细平",{"key":34,"text":353,"correct":26},"精细平","ABD",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":238,"analysis":37},1130460,"设计方块模板与支撑系统的荷载组合中，计算强度采用（ ）。",[359,361,363,365,367],{"key":20,"text":360,"correct":22},"倾倒混凝土时产生的荷载",{"key":24,"text":362,"correct":26},"插入式振捣器产生的荷载",{"key":28,"text":364,"correct":22},"新浇混凝土对模板侧面的压力",{"key":31,"text":366,"correct":26},"模板上人员设备荷载",{"key":34,"text":368,"correct":26},"超速浇筑荷载",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":82,"analysis":37},1130461,"重力式码头沉箱采用半潜驳干运法，当无资料和类似条件下运输的实例时，对半潜驳以下各个作业段应进行验算：（ ）。",[373,375,377,379,381],{"key":20,"text":374,"correct":26},"沉箱自身强度",{"key":24,"text":376,"correct":22},"下潜装载",{"key":28,"text":378,"correct":22},"航运",{"key":31,"text":380,"correct":22},"下潜卸载",{"key":34,"text":382,"correct":26},"局部承载力",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":265,"analysis":37},1130462,"（ ）安装缝宽度大于倒滤层材料粒径时，接缝或倒滤井应采取防漏措施，宜在临水面采用加大倒滤材料粒径或加混凝土插板，在临砂面采用透水材料临时间隔。",[387,389,391,393,395],{"key":20,"text":388,"correct":22},"空心块体",{"key":24,"text":390,"correct":22},"沉箱",{"key":28,"text":392,"correct":26},"板桩",{"key":31,"text":394,"correct":22},"圆筒",{"key":34,"text":396,"correct":22},"扶壁",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":112,"analysis":37},1130463,"土工织物倒滤层，应选择（ ）。",[401,403,405,407,409],{"key":20,"text":402,"correct":22},"无纺土工布",{"key":24,"text":404,"correct":22},"机织土工布",{"key":28,"text":406,"correct":26},"编织土工布",{"key":31,"text":408,"correct":26},"土工网",{"key":34,"text":410,"correct":26},"复合土工布",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":295,"analysis":37},1130464,"重力式码头胸墙模板应经设计。设计时除计算一般荷载外，尚应考虑（ ）。",[415,417,419,421,423],{"key":20,"text":416,"correct":26},"温度应力",{"key":24,"text":418,"correct":22},"波浪力",{"key":28,"text":420,"correct":26},"水压力",{"key":31,"text":422,"correct":26},"混凝土干缩应力",{"key":34,"text":424,"correct":22},"浮托力",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":112,"analysis":37},1130465,"沉桩时要保证桩偏位不超过规定，偏位过大，会带来以下问题：（ ）。",[429,431,433,435,437],{"key":20,"text":430,"correct":22},"给上部结构预制件的安装带来困难．",{"key":24,"text":432,"correct":22},"使结构受到有害的偏心力",{"key":28,"text":434,"correct":26},"增加工作量",{"key":31,"text":436,"correct":26},"使工期滞后",{"key":34,"text":438,"correct":26},"增加施工成本",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":97,"analysis":37},1130466,"沉桩控制应包括（ ）控制。",[443,445,447,449,451],{"key":20,"text":444,"correct":22},"偏位",{"key":24,"text":446,"correct":26},"强度",{"key":28,"text":448,"correct":22},"承载力",{"key":31,"text":450,"correct":26},"锤击次数",{"key":34,"text":452,"correct":22},"裂损",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":354,"analysis":37},1130467,"港口与航道工程中，高桩码头混凝土预制构件在预制场存放时应符合下列规定：（ ）。",[457,459,461,463,465],{"key":20,"text":458,"correct":22},"存放场地宜平整",{"key":24,"text":460,"correct":22},"按两点或多点支垫",{"key":28,"text":462,"correct":26},"场地需浇筑混凝土地坪",{"key":31,"text":464,"correct":22},"不同规格的预制构件，宜分别存放",{"key":34,"text":466,"correct":26},"按出运次序存放",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":97,"analysis":37},1130468,"预制构件装驳后应采取（ ）等措施，防止因风浪影响，造成构件倾倒或坠落。",[471,473,475,477,479],{"key":20,"text":472,"correct":22},"加撑",{"key":24,"text":474,"correct":26},"加蓬盖",{"key":28,"text":476,"correct":22},"加焊",{"key":31,"text":478,"correct":26},"防海水侵蚀",{"key":34,"text":480,"correct":22},"系绑",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":324,"analysis":37},1130469,"用水泥砂浆找平预制构件搁置面时，应符合下列规定：（ ）。",[485,487,489,491,493],{"key":20,"text":486,"correct":22},"不得在砂浆硬化后安装构件",{"key":24,"text":488,"correct":22},"水泥砂浆找平厚度宜取10～20mm",{"key":28,"text":490,"correct":22},"坐浆饱满，安装后略有余浆挤出缝口",{"key":31,"text":492,"correct":22},"接缝处应用砂浆嵌塞密实及勾缝",{"key":34,"text":494,"correct":26},"水泥砂浆强度应提高一个等级",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":509,"analysis":37},1130470,"高桩码头岸坡施工在沉桩后进行回填或抛石前，应先（ ）。抛填过程中，宜定时施测回淤量。清淤后应及时进行抛填，应做到随清随抛。",[499,501,503,505,507],{"key":20,"text":500,"correct":26},"测量施工区域断面",{"key":24,"text":502,"correct":22},"清除回淤浮泥",{"key":28,"text":504,"correct":22},"清除塌坡泥土",{"key":31,"text":506,"correct":26},"选择施工船舶",{"key":34,"text":508,"correct":26},"备好抛填用料","BC",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":524,"analysis":37},1130471,"斜坡堤土工织物施工时，相邻两块土工织物应搭接吻合，搭接长度（ ）。",[514,516,518,520,522],{"key":20,"text":515,"correct":26},"水下不小于500mm",{"key":24,"text":517,"correct":22},"水下不小于1000mm",{"key":28,"text":519,"correct":26},"水下不小于1500mm",{"key":31,"text":521,"correct":22},"陆上不小于500mm",{"key":34,"text":523,"correct":26},"陆上不小于1000mm","BD",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":339,"analysis":37},1130472,"探地雷达法适用于一般工程，按纵横断面布置测线，纵断面应分别布置在（ ）的适当位置上。",[529,531,533,535,537],{"key":20,"text":530,"correct":22},"堤内坡",{"key":24,"text":532,"correct":22},"堤外坡",{"key":28,"text":534,"correct":22},"堤顶",{"key":31,"text":536,"correct":26},"堤头",{"key":34,"text":538,"correct":26},"堤根",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":97,"analysis":37},1130473,"停止基坑降水至少应具备的条件有（ ）。",[543,545,547,549,551],{"key":20,"text":544,"correct":22},"闸室结构物沉降、位移满足要求",{"key":24,"text":546,"correct":26},"闸室主体施工完成",{"key":28,"text":548,"correct":22},"闸室放水前应保持干地施工及监测条件",{"key":31,"text":550,"correct":26},"上下游闸门已安装完毕",{"key":34,"text":552,"correct":22},"结构物施工至地下水位浸润线以上",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":354,"analysis":37},1130474,"黏土防渗体施工的规定有（ ）。",[557,559,561,563,565],{"key":20,"text":558,"correct":22},"土的原材料应进行粉碎加工",{"key":24,"text":560,"correct":22},"防渗体基底应清理杂物并排干积水",{"key":28,"text":562,"correct":26},"防渗体与集水槽不宜同步施工",{"key":31,"text":564,"correct":22},"分层铺筑时，上下层接缝应错开",{"key":34,"text":566,"correct":26},"分段、分片施工时，相邻工作面搭接碾压宽度：平行轴线方向不应小于300mm，垂直轴线方向不应小于2m",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":82,"analysis":37},1130475,"整治两岸石梁均有滑梁水的险滩可采取（ ）等方法。",[571,573,575,577,579],{"key":20,"text":572,"correct":26},"石梁上建丁坝",{"key":24,"text":574,"correct":22},"消除一岸滑梁水",{"key":28,"text":576,"correct":22},"炸低石梁",{"key":31,"text":578,"correct":22},"石梁上建顺坝",{"key":34,"text":580,"correct":26},"消除两岸滑梁水",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":112,"analysis":37},1130476,"土工织物软体排护底排头的固定方式应根据排头所在位置的（ ）条件确定，且应满足排体铺设过程的受力要求。",[585,587,589,591,593],{"key":20,"text":586,"correct":22},"地形",{"key":24,"text":588,"correct":22},"水文条件",{"key":28,"text":590,"correct":26},"波浪",{"key":31,"text":592,"correct":26},"冰况情况",{"key":34,"text":594,"correct":26},"风力",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":52,"analysis":37},1130477,"砂枕缝制前应进行检测，其材料的（ ）等指标应满足设计要求。",[599,601,603,605,607],{"key":20,"text":600,"correct":22},"质量",{"key":24,"text":602,"correct":26},"顶破强度",{"key":28,"text":604,"correct":22},"透水性",{"key":31,"text":606,"correct":22},"抗拉强度",{"key":34,"text":608,"correct":22},"保土性能",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":621,"analysis":37},1130478,"砂枕坝体水上抛投施工过程中，应根据（ ）等的不同及时调整定位船位置。",[613,614,615,617,619],{"key":20,"text":594,"correct":26},{"key":24,"text":590,"correct":26},{"key":28,"text":616,"correct":22},"流速",{"key":31,"text":618,"correct":22},"流向",{"key":34,"text":620,"correct":26},"潮差","CD",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":621,"analysis":37},1130479,"关于栅栏板护面块体安装施工的说法，错误的是（ ）。",[626,628,630,632,634],{"key":20,"text":627,"correct":26},"应自下而上规则摆放",{"key":24,"text":629,"correct":26},"应检查垫层石理坡质量",{"key":28,"text":631,"correct":22},"应自上而下规则摆放",{"key":31,"text":633,"correct":22},"不应使用二片石支垫",{"key":34,"text":635,"correct":26},"可使用二片石支垫",{"id":637,"libraryId":5,"type":15,"typeLabel":16,"stem":638,"options":639,"answer":354,"analysis":37},1130480,"抛枕护脚施工应根据（ ）选用匹配的定位船与抛枕船配合进行。",[640,641,642,643,645],{"key":20,"text":257,"correct":22},{"key":24,"text":616,"correct":22},{"key":28,"text":618,"correct":26},{"key":31,"text":644,"correct":22},"砂枕的规格",{"key":34,"text":646,"correct":26},"地质",{"id":648,"libraryId":5,"type":15,"typeLabel":16,"stem":649,"options":650,"answer":127,"analysis":37},1130481,"加筋体回填的填料粒径应满足设计要求，填料最大粒径应不大于（ ）。",[651,653,655,657,659],{"key":20,"text":652,"correct":26},"压实分层厚度的1／3",{"key":24,"text":654,"correct":26},"100mm",{"key":28,"text":656,"correct":22},"压实分层厚度的2／3",{"key":31,"text":658,"correct":26},"200mm",{"key":34,"text":660,"correct":22},"150mm",{"id":662,"libraryId":5,"type":15,"typeLabel":16,"stem":663,"options":664,"answer":36,"analysis":37},1130482,"陆上爆破宜采用毫秒延时爆破，开槽爆破宜按（ ）进行。",[665,667,669,671,673],{"key":20,"text":666,"correct":22},"由中心向两边",{"key":24,"text":668,"correct":26},"从下向上",{"key":28,"text":670,"correct":26},"由外向内",{"key":31,"text":672,"correct":22},"从中段向上下两端",{"key":34,"text":674,"correct":26},"从上向下",{"id":676,"libraryId":5,"type":15,"typeLabel":16,"stem":677,"options":678,"answer":524,"analysis":37},1130483,"疏浚工程按其性质和任务不同分为（ ）。",[679,681,683,685,687],{"key":20,"text":680,"correct":26},"表层疏浚",{"key":24,"text":682,"correct":22},"基建性疏浚",{"key":28,"text":684,"correct":26},"深层疏浚",{"key":31,"text":686,"correct":22},"维护性疏浚",{"key":34,"text":688,"correct":26},"综合疏浚",{"id":690,"libraryId":5,"type":15,"typeLabel":16,"stem":691,"options":692,"answer":324,"analysis":37},1130484,"耙吸挖泥船的主要施工方法有（ ）。",[693,695,697,699,701],{"key":20,"text":694,"correct":22},"装舱施工法",{"key":24,"text":696,"correct":22},"旁通施工法",{"key":28,"text":698,"correct":22},"吹填施工法",{"key":31,"text":700,"correct":22},"边抛施工法",{"key":34,"text":702,"correct":26},"横挖施工法",{"id":704,"libraryId":5,"type":15,"typeLabel":16,"stem":705,"options":706,"answer":339,"analysis":37},1130485,"影响链斗挖泥船运转小时生产率的主要参数有（ ）。",[707,709,710,711,713],{"key":20,"text":708,"correct":22},"斗速",{"key":24,"text":198,"correct":22},{"key":28,"text":194,"correct":22},{"key":31,"text":712,"correct":26},"航速",{"key":34,"text":192,"correct":26},{"id":715,"libraryId":5,"type":15,"typeLabel":16,"stem":716,"options":717,"answer":280,"analysis":37},1130486,"吹填区排泥管线的布置应满足（ ）的要求，并应考虑吹填区的地形、地貌，几何形状对管线布置的影响。",[718,720,722,724,726],{"key":20,"text":719,"correct":22},"设计标高",{"key":24,"text":721,"correct":22},"吹填范围",{"key":28,"text":723,"correct":26},"挖泥标高",{"key":31,"text":725,"correct":26},"挖泥范围",{"key":34,"text":727,"correct":22},"吹填厚度",[729,733,736,739,742,745],{"id":730,"name":731,"category":7,"favorite":732},1,"领导干部任职前廉政法规知识测试题",92,{"id":734,"name":735,"category":7,"favorite":730},595,"建筑结构与设备",{"id":737,"name":738,"category":7,"favorite":730},715,"招标采购专业知识与法律法规",{"id":740,"name":741,"category":7,"favorite":730},848,"市政方向-通用基础",{"id":743,"name":744,"category":7,"favorite":8},534,"BIM工程师",{"id":746,"name":744,"category":7,"favorite":8},535]