[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-794-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":726},{"id":5,"name":6,"category":7,"favorite":8},794,"一建港口与航道工程实务","建筑工程",0,16,50,1132,[13,38,53,68,83,98,112,127,141,156,171,185,199,210,225,239,254,268,283,297,311,326,340,355,364,375,390,404,416,430,444,456,470,485,499,513,527,541,556,570,584,598,612,626,640,654,669,683,697,712],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1130176,2,"多选题","提高混凝土耐久性的措施有（ ）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","选用优质原材料",true,{"key":24,"text":25,"correct":22},"B","优化配合比设计",{"key":27,"text":28,"correct":29},"C","延长混凝土振捣时间",false,{"key":31,"text":32,"correct":22},"D","精心施工",{"key":34,"text":35,"correct":22},"E","保证足够的钢筋保护层厚度","ABDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1130177,"为保证混凝土的耐久性，用于混凝土的砂、石骨料（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":29},"应该粒径均匀，尽量一致",{"key":24,"text":45,"correct":22},"杂质含量低",{"key":27,"text":47,"correct":22},"氯离子含量低",{"key":31,"text":49,"correct":22},"压碎指标低",{"key":34,"text":51,"correct":29},"尽可能选用针片状","BCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1130178,"为保证混凝土的耐久性，混凝土应（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":29},"搅拌均匀，时间尽可能长",{"key":24,"text":60,"correct":29},"振捣时间尽可能长",{"key":27,"text":62,"correct":22},"充分养护",{"key":31,"text":64,"correct":22},"防止开裂",{"key":34,"text":66,"correct":22},"杂质含量尽可能低","CDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1130179,"高性能混凝土（HP C）的主要特性是（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"高耐久性",{"key":24,"text":75,"correct":22},"低水胶比",{"key":27,"text":77,"correct":22},"高工作性",{"key":31,"text":79,"correct":22},"高体积稳定性",{"key":34,"text":81,"correct":29},"高变形适应性","ABCD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1130182,"商性能混凝土（HP C）的主要技术条件特征是（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"大量掺用特定的矿物掺合料",{"key":24,"text":90,"correct":22},"采用高效减水剂",{"key":27,"text":92,"correct":22},"采用低水胶比",{"key":31,"text":94,"correct":29},"采用低砂率",{"key":34,"text":96,"correct":29},"大尺寸粗骨料","ABC",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":52,"analysis":37},1130183,"商性能混凝土（HP C）所用的矿物掺合料主要有（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":29},"磨细矿粉",{"key":24,"text":105,"correct":22},"磨细矿渣粉",{"key":27,"text":107,"correct":22},"硅灰",{"key":31,"text":109,"correct":22},"优质粉煤灰",{"key":34,"text":111,"correct":29},"磨细石粉",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1130184,"排水固结法的实质为在建筑物或构筑物建造前，先在拟建场地上施加或分级施加与其相当的荷载，使土体中孔隙水排出，孔隙体积变小，土体密实，（ ），同时可消除沉降量，减小土体的压缩性，以便使工程安全顺利地建造，在使用期不致产生有害的沉降和沉降差。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"提高软基的稳定性",{"key":24,"text":119,"correct":22},"提高软基的承载力",{"key":27,"text":121,"correct":29},"增加土的自重",{"key":31,"text":123,"correct":22},"增长土体的抗剪强度",{"key":34,"text":125,"correct":29},"改善土的颗粒级配组成","ABD",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":97,"analysis":37},1130185,"关于地基处理，以下说法不正确的是（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"排水固结法只有堆载预压法及真空预压法",{"key":24,"text":134,"correct":22},"竖向排水通道深度至少应深入最危险滑动面2m",{"key":27,"text":136,"correct":22},"竖向排水体间距应为1．5～2．0m",{"key":31,"text":138,"correct":29},"真空预压法，在满足真空度要求的条件下，应连续抽气，当沉降稳定后，方可停泵卸载",{"key":34,"text":140,"correct":29},"真空预压沉降稳定的标准是：实测地面沉降速率连续5～10d平均沉降量不大于2mm／d",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},1130186,"排水固结法加固软土地基时，为监控施工和优化设计，在施工全过程中必须进行观测。监测项目有（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"孔隙水压力",{"key":24,"text":148,"correct":29},"土的自重",{"key":27,"text":150,"correct":22},"侧向变形",{"key":31,"text":152,"correct":22},"分层沉降",{"key":34,"text":154,"correct":22},"总沉降","ACDE",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},1130187,"堆载预压施工时，应根据设计要求分级加载，通过观测（ ）来控制加载速率。在打设排水体之前，应测出原地基表面的高程，作为控制依据。",[160,162,164,166,168],{"key":20,"text":161,"correct":29},"加土量",{"key":24,"text":163,"correct":29},"加荷速率",{"key":27,"text":165,"correct":29},"土体变形",{"key":31,"text":167,"correct":22},"垂直位移",{"key":34,"text":169,"correct":22},"水平位移","DE",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":67,"analysis":37},1130189,"当采用视准线法进行水平位移观测时应符合下列（ ）等规定。",[175,177,179,181,183],{"key":20,"text":176,"correct":29},"应在视准线上至少布设3个检查点",{"key":24,"text":178,"correct":29},"视准线上的变形点偏离基准线的距离不应大于10mm",{"key":27,"text":180,"correct":22},"视准线两端应布设基准点或工作基点",{"key":31,"text":182,"correct":22},"应在视准线上至少布设2个检查点",{"key":34,"text":184,"correct":22},"视准线上的变形点偏离基准线的距离不应大于20mm",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":126,"analysis":37},1130190,"我国海图中计算水深的起算面又可称为（ ）。",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"理论最低潮位",{"key":24,"text":192,"correct":22},"潮高基准面",{"key":27,"text":194,"correct":29},"海底标高基准面",{"key":31,"text":196,"correct":22},"潮位基准面",{"key":34,"text":198,"correct":29},"航道深度基准面",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":82,"analysis":37},1130191,"常用波高统计特征值有（ ）。 A.H1／10",[203,205,207,209],{"key":20,"text":204,"correct":22},"H1／3",{"key":24,"text":206,"correct":22},"Hmax",{"key":27,"text":208,"correct":22},"H1／2",{"key":31,"text":37,"correct":22},{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":224,"analysis":37},1130192,"对于深水不规则波，波浪特征值换算正确的有（ ）。",[214,216,218,220,222],{"key":20,"text":215,"correct":22},"H1／100≈H0.4％",{"key":24,"text":217,"correct":29},"H1／100=H1％",{"key":27,"text":219,"correct":22},"H1／10≈H4％",{"key":31,"text":221,"correct":29},"H1／10=H10％",{"key":34,"text":223,"correct":22},"H1／3≈H13％","ACE",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":97,"analysis":37},1130195,"潮汐可分为（ ）。",[229,231,233,235,237],{"key":20,"text":230,"correct":22},"半日潮",{"key":24,"text":232,"correct":22},"日潮",{"key":27,"text":234,"correct":22},"混合潮",{"key":31,"text":236,"correct":29},"月潮",{"key":34,"text":238,"correct":29},"周潮",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":253,"analysis":37},1130196,"混合潮可分为（ ）。",[243,245,247,249,251],{"key":20,"text":244,"correct":29},"正规半日潮混合潮",{"key":24,"text":246,"correct":22},"不正规半日潮混合潮",{"key":27,"text":248,"correct":29},"正规日潮混合潮",{"key":31,"text":250,"correct":22},"不正规日潮混合潮",{"key":34,"text":252,"correct":29},"日潮混合潮","BD",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":155,"analysis":37},1130198,"海上钻孔灌注桩钢护筒打设顶标高的确定、筒底的埋深必须考虑到（ ）的可能性，以免出现高潮时海水内渗、低潮时筒内泥浆外渗的问题。",[258,260,262,264,266],{"key":20,"text":259,"correct":22},"施工潮高",{"key":24,"text":261,"correct":29},"潮汐类型",{"key":27,"text":263,"correct":22},"潮流冲刷筒底泥面",{"key":31,"text":265,"correct":22},"高潮位的影响",{"key":34,"text":267,"correct":22},"低潮位的影响",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":282,"analysis":37},1130199,"近岸海流一般以（ ）为主。在某些情况下，其他类型的海流也相当显著，如由于波浪破碎产生的沿岸流和离岸流等。",[272,274,276,278,280],{"key":20,"text":273,"correct":22},"潮流",{"key":24,"text":275,"correct":22},"风海流",{"key":27,"text":277,"correct":29},"径流",{"key":31,"text":279,"correct":29},"盐水楔异重流",{"key":34,"text":281,"correct":29},"气压梯度流","AB",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":296,"analysis":37},1130200,"外海海水流动的形式很多，按海流与海岸的相对关系，分为（ ）。",[287,289,291,293,295],{"key":20,"text":288,"correct":22},"沿岸流",{"key":24,"text":290,"correct":29},"补偿流",{"key":27,"text":292,"correct":22},"向岸流",{"key":31,"text":294,"correct":22},"裂流",{"key":34,"text":275,"correct":29},"ACD",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":282,"analysis":37},1130202,"某一水域某时刻的实际水深由（ ）组成。",[301,303,305,307,309],{"key":20,"text":302,"correct":22},"海图中所标注的水深",{"key":24,"text":304,"correct":22},"潮汐表中给出的潮高（或潮升）值",{"key":27,"text":306,"correct":29},"地形图中的水深",{"key":31,"text":308,"correct":29},"水下地形图中的水深",{"key":34,"text":310,"correct":29},"地质报告中的水深",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":325,"analysis":37},1130204,"对于普通硅酸盐水泥，可能包含的组分有（ ）。",[315,317,319,321,323],{"key":20,"text":316,"correct":22},"熟料+石膏",{"key":24,"text":318,"correct":22},"粒化高炉矿渣",{"key":27,"text":320,"correct":22},"火山灰质混合料",{"key":31,"text":322,"correct":29},"石灰石",{"key":34,"text":324,"correct":22},"粉煤灰","ABCE",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":126,"analysis":37},1130206,"港口工程中使用水泥应考虑的技术条件包括（ ）。",[330,332,334,336,338],{"key":20,"text":331,"correct":22},"品种及强度等级",{"key":24,"text":333,"correct":22},"凝结时间",{"key":27,"text":335,"correct":29},"早强性能",{"key":31,"text":337,"correct":22},"耐久性",{"key":34,"text":339,"correct":29},"潮解性能",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":354,"analysis":37},1130208,"高性能混凝土不宜采用（ ）。",[344,346,348,350,352],{"key":20,"text":345,"correct":29},"硅酸盐水泥",{"key":24,"text":347,"correct":22},"矿渣硅酸盐水泥",{"key":27,"text":349,"correct":22},"粉煤灰硅酸盐水泥",{"key":31,"text":351,"correct":22},"火山灰质硅酸盐水泥",{"key":34,"text":353,"correct":22},"复合硅酸盐水泥","BCDE",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":82,"analysis":37},1130210,"拌制大体积混凝土的水泥宜采用（ ）。",[359,360,361,362,363],{"key":20,"text":347,"correct":22},{"key":24,"text":349,"correct":22},{"key":27,"text":351,"correct":22},{"key":31,"text":353,"correct":22},{"key":34,"text":345,"correct":29},{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":374,"analysis":37},1130211,"拌制高性能混凝土的水泥宜选用（ ）。",[368,369,370,372,373],{"key":20,"text":345,"correct":22},{"key":24,"text":347,"correct":29},{"key":27,"text":371,"correct":22},"普通硅酸盐水泥",{"key":31,"text":351,"correct":29},{"key":34,"text":349,"correct":29},"AC",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":389,"analysis":37},1130212,"对骨料最大粒径的要求有（ ）。",[379,381,383,385,387],{"key":20,"text":380,"correct":29},"不大于60mm",{"key":24,"text":382,"correct":22},"不大于构件截面最小尺寸的1／4",{"key":27,"text":384,"correct":22},"不大于钢筋最小净距的3／4；最大粒径可不大于1／2板厚",{"key":31,"text":386,"correct":29},"对南方浪溅区不大于混凝土保护层厚度的4／5",{"key":34,"text":388,"correct":22},"对厚度不大于100mm的混凝土板，最大粒径可不大于1／2板厚","BCE",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":155,"analysis":37},1130213,"粉煤灰对混凝土性能的影响有（ ）。",[394,396,398,400,402],{"key":20,"text":395,"correct":22},"减少泌水和离析",{"key":24,"text":397,"correct":29},"提高混凝土的早期强度",{"key":27,"text":399,"correct":22},"降低混凝土的水化热",{"key":31,"text":401,"correct":22},"提高其抗渗性",{"key":34,"text":403,"correct":22},"降低干缩变形",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":36,"analysis":37},1130214,"粒化高炉矿渣粉对混凝土性能的影响有（ ）。",[408,410,412,413,414],{"key":20,"text":409,"correct":22},"增大浆体的流动性",{"key":24,"text":411,"correct":22},"提高混凝土的强度",{"key":27,"text":399,"correct":29},{"key":31,"text":401,"correct":22},{"key":34,"text":415,"correct":22},"提高其抗蚀性",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":354,"analysis":37},1130215,"钢筋阻锈剂按阻锈作用机理分类可分为（ ）。",[420,422,424,426,428],{"key":20,"text":421,"correct":29},"封堵毛细孔阻锈剂",{"key":24,"text":423,"correct":22},"控制阳极阻锈剂",{"key":27,"text":425,"correct":22},"控制阴极阻锈剂",{"key":31,"text":427,"correct":22},"吸附型阻锈剂",{"key":34,"text":429,"correct":22},"渗透迁移阻锈剂",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":325,"analysis":37},1130217,"港航工程钢筋混凝土结构用钢有（ ）。",[434,436,438,440,442],{"key":20,"text":435,"correct":22},"低碳钢热轧盘条",{"key":24,"text":437,"correct":22},"热轧光圆钢筋",{"key":27,"text":439,"correct":22},"热轧带肋钢筋",{"key":31,"text":441,"correct":29},"冷拉钢丝（级别为Ⅱ级）",{"key":34,"text":443,"correct":22},"冷拉钢筋",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":325,"analysis":37},1130218,"港航工程预应力混凝土结构用钢有（ ）。",[448,449,451,453,454],{"key":20,"text":439,"correct":22},{"key":24,"text":450,"correct":22},"矫直回火钢丝",{"key":27,"text":452,"correct":22},"冷拉钢丝",{"key":31,"text":443,"correct":29},{"key":34,"text":455,"correct":22},"预应力钢绞线",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":36,"analysis":37},1130219,"粗直径钢筋套筒挤压连接的优点有（ ）。",[460,462,464,466,468],{"key":20,"text":461,"correct":22},"无明火",{"key":24,"text":463,"correct":22},"不受气候影响",{"key":27,"text":465,"correct":29},"无需专用设备",{"key":31,"text":467,"correct":22},"钢筋断面不受损",{"key":34,"text":469,"correct":22},"可用于水下钢筋连接",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":484,"analysis":37},1130220,"粗直径钢筋锥螺纹连接的优点有（ ）。",[474,476,478,480,482],{"key":20,"text":475,"correct":22},"对中性好",{"key":24,"text":477,"correct":22},"可连接异径钢筋",{"key":27,"text":479,"correct":29},"锥螺纹套筒局部加粗，连接断面连接强度高于母材",{"key":31,"text":481,"correct":29},"现场套丝质量可靠",{"key":34,"text":483,"correct":22},"可连接水平、垂直、斜向钢筋","ABE",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":389,"analysis":37},1130222,"堆载预压工程应作好施工监测和效果检验，工程结束后应进行（ ），必要时尚应进行现场载荷试验。",[489,491,493,495,497],{"key":20,"text":490,"correct":29},"动力触探试验",{"key":24,"text":492,"correct":22},"室内土工试验",{"key":27,"text":494,"correct":22},"十字板剪切试验",{"key":31,"text":496,"correct":29},"标准贯入试验",{"key":34,"text":498,"correct":22},"静力触探",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":67,"analysis":37},1130224,"港航工程钢结构防腐蚀的主要方法中，电化学的阴极防护法适用于钢结构的（ ）。",[503,505,507,509,511],{"key":20,"text":504,"correct":29},"大气区",{"key":24,"text":506,"correct":29},"浪溅区",{"key":27,"text":508,"correct":22},"水位变动区",{"key":31,"text":510,"correct":22},"水下区",{"key":34,"text":512,"correct":22},"泥下区",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":296,"analysis":37},1130225,"水工建筑物施工，在施工前及施工过程中应按要求测设一定数量的（ ），并应定期检测。",[517,519,521,523,525],{"key":20,"text":518,"correct":22},"永久控制点",{"key":24,"text":520,"correct":29},"水位观测站",{"key":27,"text":522,"correct":22},"沉降观测点",{"key":31,"text":524,"correct":22},"位移观测点",{"key":34,"text":526,"correct":29},"地下水观测点",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":224,"analysis":37},1130229,"港口航道工程测量施工中，施工高程控制的规定包括（ ）。",[531,533,535,537,539],{"key":20,"text":532,"correct":22},"施工过程中，应定期对施工水准点进行校核",{"key":24,"text":534,"correct":29},"码头、船坞、船闸和滑道施工高程控制点引测精度不应低于四等水准精度要求",{"key":27,"text":536,"correct":22},"码头、船坞、船闸和滑道施工高程控制点引测精度应按三等水准测量进行",{"key":31,"text":538,"correct":29},"施工水准点数量不应少于4个",{"key":34,"text":540,"correct":22},"施工水准点数量不应少于2个",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":555,"analysis":37},1130230,"港口与航道工程垂直和水平位移观测使用的监控网宜采用独立坐标和假定高程系统。每次应固定观测人员和仪器设备，采用（ ），在规定的环境条件下进行观测。",[545,547,549,551,553],{"key":20,"text":546,"correct":29},"相同的观测线路和不同观测方法",{"key":24,"text":548,"correct":29},"不同的观测线路和相同观测方法",{"key":27,"text":550,"correct":22},"相同的观测线路和相同观测方法",{"key":31,"text":552,"correct":29},"不同的观测线路和不同观测方法",{"key":34,"text":554,"correct":22},"选择最佳时段","CE",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":354,"analysis":37},1130231,"港口与航道工程变形监测网布设前，应充分收集测区已有基础资料，根据测区的地形、地质条件，（ ）进行全面计划和设计。",[560,562,564,566,568],{"key":20,"text":561,"correct":29},"波浪与海流情况",{"key":24,"text":563,"correct":22},"现有的仪器设备",{"key":27,"text":565,"correct":22},"变形观测的要求",{"key":31,"text":567,"correct":22},"变形观测的内容",{"key":34,"text":569,"correct":22},"变形观测的性质",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":224,"analysis":37},1130232,"水工建筑物表层垂直位移观测点应结合工程特点布设在下列位置：（ ）；不同结构分界处；不同基础或地基交结处。",[574,576,578,580,582],{"key":20,"text":575,"correct":22},"墩式结构的四角",{"key":24,"text":577,"correct":29},"墩式结构的中心",{"key":27,"text":579,"correct":22},"沉降或伸缩缝两侧",{"key":31,"text":581,"correct":29},"码头的左右两端",{"key":34,"text":583,"correct":22},"码头的前后沿",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":82,"analysis":37},1130247,"工程建设标准强制性条文中《高桩码头设计与施工规范》JTS 167-1-2010第10．0．11．1条对施工期验算岸坡稳定的要求有（ ）。",[588,590,592,594,596],{"key":20,"text":589,"correct":22},"应验算岸坡由于挖泥对稳定性的影响",{"key":24,"text":591,"correct":22},"考虑打桩振动所带来的不利因素",{"key":27,"text":593,"correct":22},"施工时期按可能出现的各种受荷情况，与设计低水位组合，进行岸坡稳定性计算",{"key":31,"text":595,"correct":22},"应验算岸坡由于回填土、抛填块石和吹填等对稳定性的影响",{"key":34,"text":597,"correct":29},"码头上部结构施工的荷载对岸坡稳定的影响",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":325,"analysis":37},1130248,"码头接岸结构及岸坡在施工期和使用期整体稳定性验算应符合下列规定：施工期应验算（ ）等各种情况下的岸坡稳定性。",[602,604,606,608,610],{"key":20,"text":603,"correct":22},"挖泥",{"key":24,"text":605,"correct":22},"回填土",{"key":27,"text":607,"correct":22},"抛填块石",{"key":31,"text":609,"correct":29},"混凝土浇筑",{"key":34,"text":611,"correct":22},"吹填",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":52,"analysis":37},1130262,"下列质量安全督查时抽查的内容中，属于质量管理行为内容的有（ ）。",[616,618,620,622,624],{"key":20,"text":617,"correct":29},"挤密砂桩的灌砂率是否符合规范规定",{"key":24,"text":619,"correct":22},"施工组织设计是否符合工程实际",{"key":27,"text":621,"correct":22},"是否交底到一线人员",{"key":31,"text":623,"correct":22},"专项施工方案是否具有针对性",{"key":34,"text":625,"correct":29},"抛石前是否对基槽尺寸进行检查",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":224,"analysis":37},1130266,"事故性质通常分为（ ）。",[630,632,634,636,638],{"key":20,"text":631,"correct":22},"责任事故",{"key":24,"text":633,"correct":29},"自然灾害",{"key":27,"text":635,"correct":22},"非责任事故",{"key":31,"text":637,"correct":29},"安全设施失当",{"key":34,"text":639,"correct":22},"破坏性事故",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":325,"analysis":37},1130273,"消除物的不安全状态，实现作业条件安全化的主要措施有（ ）。",[644,646,648,650,652],{"key":20,"text":645,"correct":22},"鼓励采用新工艺、新技术、新设备、新材料，保证安全措施费用足额使用，改善劳动条件",{"key":24,"text":647,"correct":22},"加强安全技术的研究，采用安全防护装置，隔离危险部位",{"key":27,"text":649,"correct":22},"采用符合标准的安全防护用具、机械设备和机具配件",{"key":31,"text":651,"correct":29},"建立安全总监巡查制度，及时发现和整改安全隐患",{"key":34,"text":653,"correct":22},"创建“平安工地”，定期对施工项目进行安全评价，持续改进安全绩效",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":668,"analysis":37},1130285,"施工作业者提出水上水下施工作业申请时，提供的申请资料包括（ ）。",[658,660,662,664,666],{"key":20,"text":659,"correct":22},"有关管理部门对该项目批准的文件",{"key":24,"text":661,"correct":29},"项目的施工组织设计",{"key":27,"text":663,"correct":29},"工地文明施工计划及措施",{"key":31,"text":665,"correct":22},"施工作业者的资质认证文件",{"key":34,"text":667,"correct":22},"法人资格证明文件","ADE",{"id":670,"libraryId":5,"type":15,"typeLabel":16,"stem":671,"options":672,"answer":155,"analysis":37},1130290,"水运工程建设项目的招标包括（ ）等的招标。",[673,675,677,679,681],{"key":20,"text":674,"correct":22},"施工",{"key":24,"text":676,"correct":29},"规划",{"key":27,"text":678,"correct":22},"监理",{"key":31,"text":680,"correct":22},"招标代理机构",{"key":34,"text":682,"correct":22},"监测",{"id":684,"libraryId":5,"type":15,"typeLabel":16,"stem":685,"options":686,"answer":325,"analysis":37},1130305,"使用疏浚工程预算定额编制预算时应考虑（ ）等因素。",[687,689,691,693,695],{"key":20,"text":688,"correct":22},"施工区土质",{"key":24,"text":690,"correct":22},"工程量",{"key":27,"text":692,"correct":22},"水域条件",{"key":31,"text":694,"correct":29},"实际、超宽、超深的影响",{"key":34,"text":696,"correct":22},"船舶性能",{"id":698,"libraryId":5,"type":15,"typeLabel":16,"stem":699,"options":700,"answer":711,"analysis":37},1130325,"高桩码头工程施工组织设计编制中，“各项资源的需用计划”包括：劳动力需用计划、材料需用计划、（ ）等。",[701,703,705,707,709],{"key":20,"text":702,"correct":29},"工资计划",{"key":24,"text":704,"correct":22},"预制构件和半成品需用计划",{"key":27,"text":706,"correct":22},"施工船舶和机械需用计划",{"key":31,"text":708,"correct":29},"分期分批竣工项目计划",{"key":34,"text":710,"correct":29},"混凝土试验计划","BC",{"id":713,"libraryId":5,"type":15,"typeLabel":16,"stem":714,"options":715,"answer":354,"analysis":37},1130335,"航道整治工程施工组织设计的主要内容包括（ ）。",[716,718,720,722,724],{"key":20,"text":717,"correct":29},"施工准备工作计划",{"key":24,"text":719,"correct":22},"工程概况",{"key":27,"text":721,"correct":22},"施工主体部署和主要施工方案",{"key":31,"text":723,"correct":22},"施工进度计划和施工资源需求计划",{"key":34,"text":725,"correct":22},"施工总平面布置和主要技术经济指标",[727,731,734,737,740,743],{"id":728,"name":729,"category":7,"favorite":730},1,"领导干部任职前廉政法规知识测试题",92,{"id":732,"name":733,"category":7,"favorite":728},595,"建筑结构与设备",{"id":735,"name":736,"category":7,"favorite":728},715,"招标采购专业知识与法律法规",{"id":738,"name":739,"category":7,"favorite":728},848,"市政方向-通用基础",{"id":741,"name":742,"category":7,"favorite":8},534,"BIM工程师",{"id":744,"name":742,"category":7,"favorite":8},535]