[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-794-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":723},{"id":5,"name":6,"category":7,"favorite":8},794,"一建港口与航道工程实务","建筑工程",0,14,50,1132,[13,34,46,58,70,82,100,114,129,144,159,174,189,203,218,233,248,263,278,292,306,321,335,350,365,379,393,407,421,436,450,464,478,492,506,519,532,543,558,569,583,597,612,627,641,655,669,682,695,709],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1130006,1,"单选题","套用《沿海港口水工建筑工程定额》编制概算时，（）工程的概算扩大系数按1.02 ~ 1.05确定。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","斜坡式引堤",false,{"key":24,"text":25,"correct":26},"B","直立式防波堤",true,{"key":28,"text":29,"correct":22},"C","栈引桥",{"key":31,"text":32,"correct":22},"D","斜坡式护岸","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1130007,"《内河航运水工建筑工程定额》是以（ ）为单位并用人工、材料和船舶机械艘（台）班消耗量表示的工程定额,是计算内河航运水工建筑工程定额直接费的依据。",[38,40,42,44],{"key":20,"text":39,"correct":22},"分部工程",{"key":24,"text":41,"correct":26},"分项工程",{"key":28,"text":43,"correct":22},"单位工程",{"key":31,"text":45,"correct":22},"检验批",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1130009,"港口与航道工程现场文明施工的基本要求中，施工现场必须设置明显的标牌，标明工程项目名称、建设单位、设计单位、施工单位、项目经理和施工现场总代表人的姓名，开、竣工日期，（ ）等。",[50,52,54,56],{"key":20,"text":51,"correct":26},"施工许可证批准文号",{"key":24,"text":53,"correct":22},"合同号",{"key":28,"text":55,"correct":22},"卫生许可证文号",{"key":31,"text":57,"correct":22},"施工进度表",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1130010,"港口与航道工程现场文明施工的基本要求中，施工单位应当按照施工总平面布置图设置各项临时设施，施工单位若改变施工总平面布置图，应当先向（ ）提出申请，同意后方可实施。",[62,64,66,68],{"key":20,"text":63,"correct":26},"总承包单位",{"key":24,"text":65,"correct":22},"设计单位",{"key":28,"text":67,"correct":22},"监理单位",{"key":31,"text":69,"correct":22},"承包单位",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1130011,"港口与航道工程现场文明施工的基本要求中，（ ）应当做好施工现场安全保卫工作，采取必要的防盗措施，在现场周边设立围护设施。施工现场应设置各类必要的职工生活设施，并符合卫生、通风、照明等要求，职工的膳食、饮水供应等应符合卫生要求。",[74,76,78,80],{"key":20,"text":75,"correct":22},"建设单位",{"key":24,"text":77,"correct":22},"总包单位",{"key":28,"text":79,"correct":26},"施工单位",{"key":31,"text":81,"correct":22},"分包单位",{"id":83,"libraryId":5,"type":84,"typeLabel":85,"stem":86,"options":87,"answer":99,"analysis":33},1130016,2,"多选题","对于在浅水区或可能被水淹没的岸滩区软弱地基上的沉井，适宜的施工方案是（ ）。",[88,90,92,94,96],{"key":20,"text":89,"correct":26},"就地筑岛制作",{"key":24,"text":91,"correct":22},"预制厂制作",{"key":28,"text":93,"correct":26},"制作沉井，应采取换填地基、打设砂桩等地基加固措施",{"key":31,"text":95,"correct":22},"基础大开挖，浮运安装沉井",{"key":97,"text":98,"correct":26},"E","当沉井高度大于6m时，宜分节制作、分次接高下沉","ACE",{"id":101,"libraryId":5,"type":84,"typeLabel":85,"stem":102,"options":103,"answer":99,"analysis":33},1130017,"现行行业标准对后张法预应力混凝土大管桩的表观质量有一系列规定，其中裂缝方面要求有（ ）。",[104,106,108,110,112],{"key":20,"text":105,"correct":26},"外壁面不得出现裂缝",{"key":24,"text":107,"correct":22},"内壁面不得出现裂缝",{"key":28,"text":109,"correct":26},"内壁面裂缝宽度不得超过0．2mm",{"key":31,"text":111,"correct":22},"外壁面裂缝宽度不得超过0．2mm",{"key":97,"text":113,"correct":26},"内壁裂缝深度不宜大于10mm",{"id":115,"libraryId":5,"type":84,"typeLabel":85,"stem":116,"options":117,"answer":128,"analysis":33},1130018,"重力式码头扶壁混凝土构件宜整体预制，混凝土浇筑一次完成，以免出现冷缝。预制可以采用（ ）的方法。",[118,120,122,124,126],{"key":20,"text":119,"correct":22},"斜制",{"key":24,"text":121,"correct":26},"立制",{"key":28,"text":123,"correct":26},"卧制",{"key":31,"text":125,"correct":22},"侧制",{"key":97,"text":127,"correct":22},"反制","BC",{"id":130,"libraryId":5,"type":84,"typeLabel":85,"stem":131,"options":132,"answer":143,"analysis":33},1130019,"板桩码头建筑物沉桩施工，可采用（ ）方法。",[133,135,137,139,141],{"key":20,"text":134,"correct":22},"插打沉桩",{"key":24,"text":136,"correct":26},"一次沉桩",{"key":28,"text":138,"correct":22},"复打沉桩",{"key":31,"text":140,"correct":22},"冲击沉桩",{"key":97,"text":142,"correct":26},"多次往复沉桩","BE",{"id":145,"libraryId":5,"type":84,"typeLabel":85,"stem":146,"options":147,"answer":158,"analysis":33},1130021,"急滩整治应优先采取（ ）等措施。",[148,150,152,154,156],{"key":20,"text":149,"correct":22},"固滩",{"key":24,"text":151,"correct":26},"清礁",{"key":28,"text":153,"correct":26},"疏浚",{"key":31,"text":155,"correct":26},"筑坝",{"key":97,"text":157,"correct":22},"护岸","BCD",{"id":160,"libraryId":5,"type":84,"typeLabel":85,"stem":161,"options":162,"answer":173,"analysis":33},1130023,"板桩建筑物中锚碇板一般是预制的钢筋混凝土板块，它的断面形状主要有（ ）。",[163,165,167,169,171],{"key":20,"text":164,"correct":26},"平板形",{"key":24,"text":166,"correct":26},"双向梯形",{"key":28,"text":168,"correct":26},"T形",{"key":31,"text":170,"correct":22},"H形",{"key":97,"text":172,"correct":22},"三角形","ABC",{"id":175,"libraryId":5,"type":84,"typeLabel":85,"stem":176,"options":177,"answer":188,"analysis":33},1130025,"斜坡堤护面块体扭王字块的安放，可采用以下方法：（ ）。",[178,180,182,184,186],{"key":20,"text":179,"correct":22},"坐标安放法",{"key":24,"text":181,"correct":26},"定点随机安放法",{"key":28,"text":183,"correct":22},"不规则安放法",{"key":31,"text":185,"correct":26},"规则安放法",{"key":97,"text":187,"correct":22},"极坐标安放法","BD",{"id":190,"libraryId":5,"type":84,"typeLabel":85,"stem":191,"options":192,"answer":128,"analysis":33},1130026,"回填土吹填施工时，排水口宜远离码头前沿，其口径尺寸和高程应根据（ ）确定。",[193,195,197,199,201],{"key":20,"text":194,"correct":22},"回淤隋况",{"key":24,"text":196,"correct":26},"排水要求",{"key":28,"text":198,"correct":26},"沉淀效果",{"key":31,"text":200,"correct":22},"施工水位",{"key":97,"text":202,"correct":22},"排水效果",{"id":204,"libraryId":5,"type":84,"typeLabel":85,"stem":205,"options":206,"answer":217,"analysis":33},1130027,"重力式码头沉箱漂浮接高一般适用于（ ）的情况。",[207,209,211,213,215],{"key":20,"text":208,"correct":22},"地基条件好",{"key":24,"text":210,"correct":26},"所需接高沉箱数量少",{"key":28,"text":212,"correct":26},"风浪小",{"key":31,"text":214,"correct":22},"所需接高沉箱数量多",{"key":97,"text":216,"correct":26},"水深较大","BCE",{"id":219,"libraryId":5,"type":84,"typeLabel":85,"stem":220,"options":221,"answer":232,"analysis":33},1130032,"对于有抗冻要求的素混凝土方块养护要求，包含（ ）等。",[222,224,226,228,230],{"key":20,"text":223,"correct":26},"混凝土浇筑完后及时覆盖，结硬后保湿养护",{"key":24,"text":225,"correct":26},"当日平均气温低于+5℃时，不宜洒水养护",{"key":28,"text":227,"correct":22},"无论采用何种水泥，混凝土潮湿养护时间都不少于14d",{"key":31,"text":229,"correct":26},"缺乏淡水的地区，可采用海水保持潮湿养护",{"key":97,"text":231,"correct":26},"潮湿养护后，宜在空气中干燥碳化14～21d","ABDE",{"id":234,"libraryId":5,"type":84,"typeLabel":85,"stem":235,"options":236,"answer":247,"analysis":33},1130034,"重力式码头方块装驳前，（ ），以免方块安不平稳。",[237,239,241,243,245],{"key":20,"text":238,"correct":26},"应清除方块顶面的杂物",{"key":24,"text":240,"correct":22},"应将方块底面不平处凿除",{"key":28,"text":242,"correct":22},"方块底面应凿毛处理",{"key":31,"text":244,"correct":22},"应将方块顶面凿毛处理",{"key":97,"text":246,"correct":26},"应清除方块底面的粘底物","AE",{"id":249,"libraryId":5,"type":84,"typeLabel":85,"stem":250,"options":251,"answer":262,"analysis":33},1130036,"重力式码头预制大型沉箱海上运输，可用（ ）。",[252,254,256,258,260],{"key":20,"text":253,"correct":26},"浮运拖带法",{"key":24,"text":255,"correct":26},"半潜驳干运法",{"key":28,"text":257,"correct":22},"货轮运输法",{"key":31,"text":259,"correct":22},"方驳运输法",{"key":97,"text":261,"correct":22},"潜驳运输法","AB",{"id":264,"libraryId":5,"type":84,"typeLabel":85,"stem":265,"options":266,"answer":277,"analysis":33},1130037,"重力式码头沉箱采用浮运拖带法时，拖带前应进行以下项目的验算：（ ）。",[267,269,271,273,275],{"key":20,"text":268,"correct":22},"总体强度",{"key":24,"text":270,"correct":26},"吃水",{"key":28,"text":272,"correct":22},"局部承载力",{"key":31,"text":274,"correct":26},"压载",{"key":97,"text":276,"correct":26},"浮运稳定","BDE",{"id":279,"libraryId":5,"type":84,"typeLabel":85,"stem":280,"options":281,"answer":217,"analysis":33},1130038,"大型预制件吊运采用的吊具应经设计，并满足（ ）要求。",[282,284,286,288,290],{"key":20,"text":283,"correct":22},"耐久性",{"key":24,"text":285,"correct":26},"强度",{"key":28,"text":287,"correct":26},"刚度",{"key":31,"text":289,"correct":22},"通用性",{"key":97,"text":291,"correct":26},"稳定性",{"id":293,"libraryId":5,"type":84,"typeLabel":85,"stem":294,"options":295,"answer":305,"analysis":33},1130039,"采用半潜驳载运沉箱时，应对沉箱的（ ）进行验算。",[296,298,300,301,303],{"key":20,"text":297,"correct":26},"整体强度",{"key":24,"text":299,"correct":22},"隔舱强度",{"key":28,"text":291,"correct":26},{"key":31,"text":302,"correct":22},"封舱密封度",{"key":97,"text":304,"correct":22},"变形","AC",{"id":307,"libraryId":5,"type":84,"typeLabel":85,"stem":308,"options":309,"answer":320,"analysis":33},1130040,"重力式码头棱体抛填前应检查基床和岸坡有无（ ），必要时应进行清理。",[310,312,314,316,318],{"key":20,"text":311,"correct":22},"冲刷",{"key":24,"text":313,"correct":22},"沉积",{"key":28,"text":315,"correct":26},"回淤",{"key":31,"text":317,"correct":26},"塌坡",{"key":97,"text":319,"correct":22},"塌陷","CD",{"id":322,"libraryId":5,"type":84,"typeLabel":85,"stem":323,"options":324,"answer":262,"analysis":33},1130042,"回填土吹填施工时，排水口宜远离码头前沿，其（ ）应根据排水要求和沉淀效果确定。",[325,327,329,331,333],{"key":20,"text":326,"correct":26},"口径尺寸",{"key":24,"text":328,"correct":26},"高程",{"key":28,"text":330,"correct":22},"排水管类型",{"key":31,"text":332,"correct":22},"排水管直径",{"key":97,"text":334,"correct":22},"排水管长度",{"id":336,"libraryId":5,"type":84,"typeLabel":85,"stem":337,"options":338,"answer":349,"analysis":33},1130043,"重力式码头的倒滤层完成后，应及时回填，墙后采用吹填时，吹填过程中，应对码头的（ ）进行观测。如码头发生较大变形等危险迹象，应立即停止吹填，并采取有效措施。",[339,341,343,345,347],{"key":20,"text":340,"correct":26},"填土高度",{"key":24,"text":342,"correct":26},"内外水位",{"key":28,"text":344,"correct":26},"位移",{"key":31,"text":346,"correct":26},"沉降",{"key":97,"text":348,"correct":22},"回填速率","ABCD",{"id":351,"libraryId":5,"type":84,"typeLabel":85,"stem":352,"options":353,"answer":364,"analysis":33},1130046,"重力式码头胸墙混凝土在施工缝处浇筑时，应清除已硬化混凝土表面上的（ ）。",[354,356,358,360,362],{"key":20,"text":355,"correct":26},"水泥薄膜",{"key":24,"text":357,"correct":22},"面层气泡",{"key":28,"text":359,"correct":22},"面层水泥砂浆",{"key":31,"text":361,"correct":26},"松动石子",{"key":97,"text":363,"correct":26},"软弱混凝土层","ADE",{"id":366,"libraryId":5,"type":84,"typeLabel":85,"stem":367,"options":368,"answer":305,"analysis":33},1130048,"高桩码头桩沉完以后，应保证满足设计承载力的要求。一般是采用双控，即：（ ）（最后一阵平均每击下沉量）。",[369,371,373,375,377],{"key":20,"text":370,"correct":26},"桩尖标高",{"key":24,"text":372,"correct":22},"桩入土深度",{"key":28,"text":374,"correct":26},"打桩最后贯入度",{"key":31,"text":376,"correct":22},"贯入度的变化",{"key":97,"text":378,"correct":22},"桩下沉标高情况",{"id":380,"libraryId":5,"type":84,"typeLabel":85,"stem":381,"options":382,"answer":364,"analysis":33},1130050,"锤击沉桩的控制应根据（ ）综合考虑。",[383,385,387,389,391],{"key":20,"text":384,"correct":26},"地质条件",{"key":24,"text":386,"correct":22},"水流条件",{"key":28,"text":388,"correct":22},"波浪情况",{"key":31,"text":390,"correct":26},"锤型",{"key":97,"text":392,"correct":26},"桩长",{"id":394,"libraryId":5,"type":84,"typeLabel":85,"stem":395,"options":396,"answer":349,"analysis":33},1130051,"沉桩过程中要控制桩身裂损，应做到（ ）。",[397,399,401,403,405],{"key":20,"text":398,"correct":26},"合理选锤",{"key":24,"text":400,"correct":26},"控制打桩应力",{"key":28,"text":402,"correct":26},"合理选择桩垫",{"key":31,"text":404,"correct":26},"锤与替打、桩三者要处于同一轴线上",{"key":97,"text":406,"correct":22},"降低锤芯冲程",{"id":408,"libraryId":5,"type":84,"typeLabel":85,"stem":409,"options":410,"answer":188,"analysis":33},1130052,"拉杆在（ ）过程中应避免产生永久变形和保护层及丝扣等遭受损伤。",[411,413,415,417,419],{"key":20,"text":412,"correct":22},"加工",{"key":24,"text":414,"correct":26},"堆存",{"key":28,"text":416,"correct":22},"安装",{"key":31,"text":418,"correct":26},"调运",{"key":97,"text":420,"correct":22},"使用",{"id":422,"libraryId":5,"type":84,"typeLabel":85,"stem":423,"options":424,"answer":435,"analysis":33},1130053,"板桩建筑物锚碇系统拉杆安装时，在满足条件（ ）后，方可张紧拉杆。",[425,427,429,431,433],{"key":20,"text":426,"correct":26},"锚碇结构前回填完成",{"key":24,"text":428,"correct":22},"锚碇结构后回填完成",{"key":28,"text":430,"correct":26},"锚碇结构的现浇混凝土达到设计强度",{"key":31,"text":432,"correct":26},"板桩墙导梁或胸墙的现浇混凝土达到设计强度",{"key":97,"text":434,"correct":22},"拉杆防护层检查完好","ACD",{"id":437,"libraryId":5,"type":84,"typeLabel":85,"stem":438,"options":439,"answer":173,"analysis":33},1130054,"斜坡堤砂垫层抛填施工时，应考虑（ ）等自然条件对砂粒产生漂流的影响，可通过试抛确定抛砂船的驻位。",[440,442,444,446,448],{"key":20,"text":441,"correct":26},"水深",{"key":24,"text":443,"correct":26},"水流",{"key":28,"text":445,"correct":26},"波浪",{"key":31,"text":447,"correct":22},"风向",{"key":97,"text":449,"correct":22},"风力",{"id":451,"libraryId":5,"type":84,"typeLabel":85,"stem":452,"options":453,"answer":463,"analysis":33},1130055,"斜坡堤抛砂施工应分段，砂垫层抛填后应及时用块石等覆盖。分段的长度应根据（ ）确定。",[454,456,458,459,461],{"key":20,"text":455,"correct":26},"自然条件",{"key":24,"text":457,"correct":22},"气候条件",{"key":28,"text":386,"correct":22},{"key":31,"text":460,"correct":26},"施工条件",{"key":97,"text":462,"correct":22},"供料情况","AD",{"id":465,"libraryId":5,"type":84,"typeLabel":85,"stem":466,"options":467,"answer":188,"analysis":33},1130056,"斜坡堤的砂垫层顶面高程（ ），砂垫层厚度不小于设计厚度。",[468,470,472,474,476],{"key":20,"text":469,"correct":22},"不高于设计高程0．3m",{"key":24,"text":471,"correct":26},"不高于设计高程0．5m",{"key":28,"text":473,"correct":22},"不高于设计高程0．8m",{"key":31,"text":475,"correct":26},"不低于设计高程0．3m",{"key":97,"text":477,"correct":22},"不低于设计高程0．5m",{"id":479,"libraryId":5,"type":84,"typeLabel":85,"stem":480,"options":481,"answer":320,"analysis":33},1130058,"斜坡堤土工织物铺设块的拼缝宜采用（ ）连接，但在长度方向（主要受力方向）不得有接头缝。",[482,484,486,488,490],{"key":20,"text":483,"correct":22},"顺缝",{"key":24,"text":485,"correct":22},"直缝",{"key":28,"text":487,"correct":26},"丁缝",{"key":31,"text":489,"correct":26},"包缝",{"key":97,"text":491,"correct":22},"线缝",{"id":493,"libraryId":5,"type":84,"typeLabel":85,"stem":494,"options":495,"answer":232,"analysis":33},1130060,"对于石料缺乏的地区，经论证斜坡堤堤心石可采用开山石，但开山石应（ ）。",[496,498,500,502,504],{"key":20,"text":497,"correct":26},"无严重风化",{"key":24,"text":499,"correct":26},"不成片",{"key":28,"text":501,"correct":22},"有混合级配要求",{"key":31,"text":503,"correct":26},"有适当的级配",{"key":97,"text":505,"correct":26},"含泥量小于10％",{"id":507,"libraryId":5,"type":84,"typeLabel":85,"stem":508,"options":509,"answer":305,"analysis":33},1130062,"当斜坡堤堤身采用爆破挤淤填石施工方法时，置换淤泥质软基的（ ）均应进行施工期和竣工期检查。",[510,512,514,516,518],{"key":20,"text":511,"correct":26},"平面位置",{"key":24,"text":513,"correct":22},"厚度",{"key":28,"text":515,"correct":26},"深度",{"key":31,"text":517,"correct":22},"工程量",{"key":97,"text":344,"correct":22},{"id":520,"libraryId":5,"type":84,"typeLabel":85,"stem":521,"options":522,"answer":217,"analysis":33},1130063,"斜坡堤堤心石抛石船可根据（ ）等因素选择。",[523,525,527,528,530],{"key":20,"text":524,"correct":22},"风浪流速",{"key":24,"text":526,"correct":26},"抛填工程量大小",{"key":28,"text":460,"correct":26},{"key":31,"text":529,"correct":22},"质量要求",{"key":97,"text":531,"correct":26},"石料来源",{"id":533,"libraryId":5,"type":84,"typeLabel":85,"stem":534,"options":535,"answer":542,"analysis":33},1130064,"斜坡堤堤心石水上抛填块石，应根据（ ）等自然条件对块石产生的漂流的影响，确定抛石船的驻位。",[536,537,539,540,541],{"key":20,"text":449,"correct":22},{"key":24,"text":538,"correct":22},"风速",{"key":28,"text":441,"correct":26},{"key":31,"text":443,"correct":26},{"key":97,"text":445,"correct":26},"CDE",{"id":544,"libraryId":5,"type":84,"typeLabel":85,"stem":545,"options":546,"answer":557,"analysis":33},1130067,"预制混凝土护面块体的底模可根据制作方式分别采用（ ）。",[547,549,551,553,555],{"key":20,"text":548,"correct":22},"固定在混凝土地坪上的木模",{"key":24,"text":550,"correct":26},"固定在混凝土地坪上的钢模",{"key":28,"text":552,"correct":26},"固定在钢支架上的钢模",{"key":31,"text":554,"correct":26},"混凝土胎膜",{"key":97,"text":556,"correct":26},"混凝土地坪","BCDE",{"id":559,"libraryId":5,"type":84,"typeLabel":85,"stem":560,"options":561,"answer":349,"analysis":33},1130070,"重力式码头沉箱座底接高一般适用于（ ）的情况。",[562,563,565,566,568],{"key":20,"text":214,"correct":26},{"key":24,"text":564,"correct":26},"风浪大",{"key":28,"text":208,"correct":26},{"key":31,"text":567,"correct":26},"水深适当",{"key":97,"text":210,"correct":22},{"id":570,"libraryId":5,"type":84,"typeLabel":85,"stem":571,"options":572,"answer":349,"analysis":33},1130071,"对于土石围堰材料的要求，正确的有（ ）。",[573,575,577,579,581],{"key":20,"text":574,"correct":26},"匀质土宜选用粉质黏土",{"key":24,"text":576,"correct":26},"粉质黏土的土粒渗透系数不宜大于1×10-4cm／s",{"key":28,"text":578,"correct":26},"钢板桩围堰内填料宜采用中砂、粗砂",{"key":31,"text":580,"correct":26},"滤层应选用水稳定性好的砂砾料",{"key":97,"text":582,"correct":22},"填筑土粒含水率与最优含水率的偏差不宜超过5％",{"id":584,"libraryId":5,"type":84,"typeLabel":85,"stem":585,"options":586,"answer":232,"analysis":33},1130072,"构筑土石围堰的原则有（ ）。",[587,589,591,593,595],{"key":20,"text":588,"correct":26},"陆上围堰应分层填筑、分层压实",{"key":24,"text":590,"correct":26},"水中围堰宜一次填筑出水并压实",{"key":28,"text":592,"correct":22},"水中围堰宜分层填筑，对出水部分要分层压实",{"key":31,"text":594,"correct":26},"结合基坑开挖进行填筑",{"key":97,"text":596,"correct":26},"围堰宜在枯水期合龙",{"id":598,"libraryId":5,"type":84,"typeLabel":85,"stem":599,"options":600,"answer":611,"analysis":33},1130073,"换填地基应通过试验和试验性施工确定的有（ ）。",[601,603,605,607,609],{"key":20,"text":602,"correct":26},"施工方法",{"key":24,"text":604,"correct":22},"施工定额",{"key":28,"text":606,"correct":26},"最优含水率",{"key":31,"text":608,"correct":26},"分层厚度",{"key":97,"text":610,"correct":26},"每层的压实遍数","ACDE",{"id":613,"libraryId":5,"type":84,"typeLabel":85,"stem":614,"options":615,"answer":626,"analysis":33},1130074,"砌体护岸与护底的技术要求包含（ ）。",[616,618,620,622,624],{"key":20,"text":617,"correct":26},"砌体所用石料应质地坚硬、不易风化、无裂纹",{"key":24,"text":619,"correct":26},"砌石形状大致方正，厚度不小于200mm",{"key":28,"text":621,"correct":26},"浆砌块石在使用前必须浇水湿润，表面清除干净，不得有油污",{"key":31,"text":623,"correct":22},"砌筑完成后养护时间不宜少于7d",{"key":97,"text":625,"correct":26},"养护期不宜回填","ABCE",{"id":628,"libraryId":5,"type":84,"typeLabel":85,"stem":629,"options":630,"answer":305,"analysis":33},1130076,"连续急滩整治可采取（ ）相结合的工程措施，分散水面的集中落差，减缓流速比降。",[631,633,635,637,639],{"key":20,"text":632,"correct":26},"疏浚开挖",{"key":24,"text":634,"correct":22},"布置错口丁坝",{"key":28,"text":636,"correct":26},"筑坝壅水",{"key":31,"text":638,"correct":22},"建多级拦石坝",{"key":97,"text":640,"correct":22},"溪沟内筑栅栏坝",{"id":642,"libraryId":5,"type":84,"typeLabel":85,"stem":643,"options":644,"answer":349,"analysis":33},1130077,"影响挖泥船时间利用率的主要客观因素有（ ）。",[645,647,649,651,653],{"key":20,"text":646,"correct":26},"强风及风向情况",{"key":24,"text":648,"correct":26},"浓雾",{"key":28,"text":650,"correct":26},"潮汐",{"key":31,"text":652,"correct":26},"施工干扰",{"key":97,"text":654,"correct":22},"泥层厚度",{"id":656,"libraryId":5,"type":84,"typeLabel":85,"stem":657,"options":658,"answer":349,"analysis":33},1130078,"在计算耙吸挖泥船施工时间利用率时，其挖泥时间是指（ ）等时间。",[659,661,663,665,667],{"key":20,"text":660,"correct":26},"挖泥",{"key":24,"text":662,"correct":26},"运泥",{"key":28,"text":664,"correct":26},"抛泥",{"key":31,"text":666,"correct":26},"吹泥",{"key":97,"text":668,"correct":22},"吹水",{"id":670,"libraryId":5,"type":84,"typeLabel":85,"stem":671,"options":672,"answer":99,"analysis":33},1130079,"耙吸船装舱施工的施工运转小时生产率与（ ）时间有关。",[673,675,677,679,681],{"key":20,"text":674,"correct":26},"空载航行",{"key":24,"text":676,"correct":22},"避让",{"key":28,"text":678,"correct":26},"重载航行",{"key":31,"text":680,"correct":22},"检修",{"key":97,"text":664,"correct":26},{"id":683,"libraryId":5,"type":84,"typeLabel":85,"stem":684,"options":685,"answer":128,"analysis":33},1130080,"挖掘型耙头适用于挖掘（ ）等土质。",[686,688,690,692,693],{"key":20,"text":687,"correct":22},"松散砂",{"key":24,"text":689,"correct":26},"淤泥土类",{"key":28,"text":691,"correct":26},"密实砂",{"key":31,"text":445,"correct":22},{"key":97,"text":694,"correct":22},"硬黏土",{"id":696,"libraryId":5,"type":84,"typeLabel":85,"stem":697,"options":698,"answer":217,"analysis":33},1130081,"重力式码头基槽开挖时，为保证断面尺寸的精度和边坡稳定，对靠近岸边的基槽需分层开挖，每层厚度根据（ ）确定。",[699,701,703,705,707],{"key":20,"text":700,"correct":22},"开挖厚度",{"key":24,"text":702,"correct":26},"边坡精度要求",{"key":28,"text":704,"correct":26},"土质",{"key":31,"text":706,"correct":22},"风浪",{"key":97,"text":708,"correct":26},"挖泥船类型",{"id":710,"libraryId":5,"type":84,"typeLabel":85,"stem":711,"options":712,"answer":262,"analysis":33},1130083,"基床夯实后，应进行夯实检验。检验时，每个夯实施工段（按土质和基床厚度划分）抽查不少于5m一段基床，用（ ）复打一夯次（夯锤相邻排列，不压半夯）。",[713,715,717,719,721],{"key":20,"text":714,"correct":26},"原夯锤",{"key":24,"text":716,"correct":26},"原夯击能",{"key":28,"text":718,"correct":22},"原锤重",{"key":31,"text":720,"correct":22},"原锤型",{"key":97,"text":722,"correct":22},"设计夯锤",[724,727,730,733,736,739],{"id":15,"name":725,"category":7,"favorite":726},"领导干部任职前廉政法规知识测试题",92,{"id":728,"name":729,"category":7,"favorite":15},595,"建筑结构与设备",{"id":731,"name":732,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":734,"name":735,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":737,"name":738,"category":7,"favorite":8},534,"BIM工程师",{"id":740,"name":738,"category":7,"favorite":8},535]