[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-794-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":582},{"id":5,"name":6,"category":7,"favorite":8},794,"一建港口与航道工程实务","建筑工程",0,13,50,1132,[13,34,46,58,70,82,94,106,117,129,141,153,165,177,188,196,206,218,230,242,254,264,273,285,293,305,317,325,334,342,352,363,372,384,396,408,420,432,444,456,468,479,488,500,512,524,536,548,560,572],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1129955,1,"单选题","下列不属于概算主要表格的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","工程建设其他费用分项概算表",false,{"key":24,"text":25,"correct":22},"B","主要材料用量汇总表",{"key":27,"text":28,"correct":22},"C","建筑安装单位工程概算表",{"key":30,"text":31,"correct":32},"D","单项工程概算汇总表",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1129956,"港口与航道工程施工中，（ ）不是工期索赔计算的分析方法。",[38,40,42,44],{"key":20,"text":39,"correct":22},"网络分析方法",{"key":24,"text":41,"correct":22},"按实际记录确定补偿工期",{"key":27,"text":43,"correct":32},"概率分析法",{"key":30,"text":45,"correct":22},"比例分析法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},1129957,"水运工程施工过程中，索赔费用的计算原则是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"计算合理",{"key":24,"text":53,"correct":22},"真实可信",{"key":27,"text":55,"correct":22},"证据确凿",{"key":30,"text":57,"correct":32},"赔（补）偿实际损失",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1129958,"工程月、旬（或周）施工进度计划是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":32},"实施性的作业计划",{"key":24,"text":65,"correct":22},"控制性计划",{"key":27,"text":67,"correct":22},"确定总进度目标的计划",{"key":30,"text":69,"correct":22},"控制总工期的计划",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1129959,"在对进度计划调整时，对落后的关键线路（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"无需调整",{"key":24,"text":77,"correct":32},"必须采取措施加快",{"key":27,"text":79,"correct":22},"允许暂时落后",{"key":30,"text":81,"correct":22},"利用以后的时差可自然调整",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1129960,"项目进度控制应以实现（ ）为最终目标。",[86,88,90,92],{"key":20,"text":87,"correct":22},"最短工期",{"key":24,"text":89,"correct":22},"最大经济效益",{"key":27,"text":91,"correct":32},"施工合同约定的竣工日期",{"key":30,"text":93,"correct":22},"业主下达的工期",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1129961,"项目部应向（ ）提出开工申请报告。",[98,100,102,104],{"key":20,"text":99,"correct":22},"业主",{"key":24,"text":101,"correct":32},"监理工程师",{"key":27,"text":103,"correct":22},"企业法人代表",{"key":30,"text":105,"correct":22},"当地的工程质量监督站",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1129962,"项目部应按（ ）下达的开工令指定的日期开工。",[110,112,113,115],{"key":20,"text":111,"correct":22},"建设单位",{"key":24,"text":101,"correct":32},{"key":27,"text":114,"correct":22},"企业领导",{"key":30,"text":116,"correct":22},"工程质量监督机构",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":20,"analysis":33},1129963,"检验批质量合格的标准包括（ ）。",[121,123,125,127],{"key":20,"text":122,"correct":32},"主要检验项目应全部合格",{"key":24,"text":124,"correct":22},"主要检验项目中允许偏差的抽查合格率达到80％以上",{"key":27,"text":126,"correct":22},"一般检验项目中允许偏差的抽检合格率达到90％以上",{"key":30,"text":128,"correct":22},"一般检验项目的检验合格率达到90％以上",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":24,"analysis":33},1129964,"单位工程质量合格的标准包括（ ）。",[133,135,137,139],{"key":20,"text":134,"correct":22},"所含分部工程的质量合格率达95％以上",{"key":24,"text":136,"correct":32},"所含分部工程的质量全部合格",{"key":27,"text":138,"correct":22},"不合格的项目不影响工程的使用功能",{"key":30,"text":140,"correct":22},"主要功能项目抽检合格率达95％以上",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":27,"analysis":33},1129965,"建设项目和单项工程的质量合格标准包括（ ）。",[145,147,149,151],{"key":20,"text":146,"correct":22},"所含单位工程的合格率达到95％以上",{"key":24,"text":148,"correct":22},"工程资料完整",{"key":27,"text":150,"correct":32},"所含单位工程全部合格",{"key":30,"text":152,"correct":22},"主要功能项目抽检全部合格",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":27,"analysis":33},1129966,"水运工程项目实施，应当在（ ）划分单位工程、分部和分项工程。",[157,159,161,163],{"key":20,"text":158,"correct":22},"在编制施工方案时",{"key":24,"text":160,"correct":22},"在开工之后",{"key":27,"text":162,"correct":32},"在开工之前",{"key":30,"text":164,"correct":22},"在编制施工组织设计时",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":27,"analysis":33},1129967,"分项工程的质量检验应由（ ）组织进行。",[169,171,173,175],{"key":20,"text":170,"correct":22},"施工单位负责人",{"key":24,"text":172,"correct":22},"施工单位分项工程负责人",{"key":27,"text":174,"correct":32},"施工单位分项工程技术负责人",{"key":30,"text":176,"correct":22},"施工单位技术负责人",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":27,"analysis":33},1129968,"单位工程、分部分项工程的划分应由（ ）组织进行。",[181,183,185,186],{"key":20,"text":182,"correct":22},"监理单位",{"key":24,"text":184,"correct":22},"施工单位",{"key":27,"text":111,"correct":32},{"key":30,"text":187,"correct":22},"质量监督部门",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":30,"analysis":33},1129969,"验收批的质量检验应由（ ）组织进行。",[192,193,194,195],{"key":20,"text":101,"correct":22},{"key":24,"text":170,"correct":22},{"key":27,"text":176,"correct":22},{"key":30,"text":174,"correct":32},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":27,"analysis":33},1129970,"单位工程完工后，由施工单位组织自检合格后报（ ）。",[200,201,203,204],{"key":20,"text":111,"correct":22},{"key":24,"text":202,"correct":22},"质量监督单位",{"key":27,"text":182,"correct":32},{"key":30,"text":205,"correct":22},"企业质检部门",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":30,"analysis":33},1129971,"潜水作业的水深超过（ ）时，应在现场备有减压舱等设备。",[210,212,214,216],{"key":20,"text":211,"correct":22},"15m",{"key":24,"text":213,"correct":22},"20m",{"key":27,"text":215,"correct":22},"25m",{"key":30,"text":217,"correct":32},"30m",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":24,"analysis":33},1129972,"水运工程质量检验中，按建筑施工的（ ）划分分项工程。",[222,224,226,228],{"key":20,"text":223,"correct":22},"工程性质",{"key":24,"text":225,"correct":32},"主要工序（工种）",{"key":27,"text":227,"correct":22},"工程量",{"key":30,"text":229,"correct":22},"施工工期",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":27,"analysis":33},1129973,"港口工程质量检验中，施工企业在开工前应对单位工程和分部、分项工程做出明确划分，（ ）据此进行质量控制和检验。",[234,236,238,240],{"key":20,"text":235,"correct":22},"报上级领导机关同意后",{"key":24,"text":237,"correct":22},"报送上级领导机关",{"key":27,"text":239,"correct":32},"报水运工程质量监督机构备案后",{"key":30,"text":241,"correct":22},"报送监理工程师同意后",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":20,"analysis":33},1129974,"陆域形成的吹填工程可按（ ）的区域划分单位工程。",[246,248,250,252],{"key":20,"text":247,"correct":32},"设计文件",{"key":24,"text":249,"correct":22},"施工阶段",{"key":27,"text":251,"correct":22},"施工分区",{"key":30,"text":253,"correct":22},"检验阶段",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":27,"analysis":33},1129975,"分期实施的疏浚工程按（ ）划分单位工程。",[258,259,261,262],{"key":20,"text":227,"correct":22},{"key":24,"text":260,"correct":22},"疏浚土质情况",{"key":27,"text":249,"correct":32},{"key":30,"text":263,"correct":22},"工期长短",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":20,"analysis":33},1129976,"水运工程单位工程完工后，应由（ ）组织相关单位对单位工程进行预验收。",[268,269,270,271],{"key":20,"text":111,"correct":32},{"key":24,"text":182,"correct":22},{"key":27,"text":184,"correct":22},{"key":30,"text":272,"correct":22},"质量监督机构",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":30,"analysis":33},1129977,"水运工程分项、分部、单位工程的划分是进行工程质量控制和检验的依据，项目开工前应报水运工程质量监督机构（ ）。",[277,279,281,283],{"key":20,"text":278,"correct":22},"批准",{"key":24,"text":280,"correct":22},"审核",{"key":27,"text":282,"correct":22},"核定",{"key":30,"text":284,"correct":32},"备案",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},1129978,"水运工程单位工程完工后，（）应组织有关人员进行检验。",[289,290,291,292],{"key":20,"text":184,"correct":32},{"key":24,"text":182,"correct":22},{"key":27,"text":111,"correct":22},{"key":30,"text":202,"correct":22},{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":24,"analysis":33},1129979,"主要检验项目是指（ ）中对安全、卫生、环保和公众利益起决定性的检验项目。",[297,299,301,303],{"key":20,"text":298,"correct":22},"单位工程",{"key":24,"text":300,"correct":32},"分项工程",{"key":27,"text":302,"correct":22},"分部工程",{"key":30,"text":304,"correct":22},"主体工程",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":24,"analysis":33},1129980,"观感质量检查评为二级的项目，允许少量测点的偏差超过允许的偏差值，但未超过规定值的（ ）倍。",[309,311,313,315],{"key":20,"text":310,"correct":22},"1．2",{"key":24,"text":312,"correct":32},"1．5",{"key":27,"text":314,"correct":22},"1．4",{"key":30,"text":316,"correct":22},"2．0",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":27,"analysis":33},1129981,"单位工程完工后应由（ ）组织进行质量检验。",[321,322,323,324],{"key":20,"text":182,"correct":22},{"key":24,"text":111,"correct":22},{"key":27,"text":184,"correct":32},{"key":30,"text":187,"correct":22},{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":20,"analysis":33},1129982,"分项工程的质量由施工单位组织自检合格后应报（ ）。",[329,330,331,332],{"key":20,"text":182,"correct":32},{"key":24,"text":111,"correct":22},{"key":27,"text":202,"correct":22},{"key":30,"text":333,"correct":22},"企业主要部门",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},1129983,"检验批质量由施工单位自检合格后报监理单位，由（ ）组织进行检验与确认。",[338,339,340,341],{"key":20,"text":111,"correct":22},{"key":24,"text":101,"correct":32},{"key":27,"text":202,"correct":22},{"key":30,"text":205,"correct":22},{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":27,"analysis":33},1129984,"分项工程的质量由施工单位组织自检合格后，由监理工程师组织（ ）检查确认。",[346,347,348,350],{"key":20,"text":111,"correct":22},{"key":24,"text":202,"correct":22},{"key":27,"text":349,"correct":32},"施工单位专职质量检查员",{"key":30,"text":351,"correct":22},"设计单位",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":24,"analysis":33},1129985,"港口工程质量检验评定中，按建筑物的（ ）划分分部工程。",[356,358,360,361],{"key":20,"text":357,"correct":22},"工程材料",{"key":24,"text":359,"correct":32},"主要部位",{"key":27,"text":227,"correct":22},{"key":30,"text":362,"correct":22},"施工顺序",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":20,"analysis":33},1129986,"港口工程质量检验中，码头工程按（ ）划分单位工程。",[367,369,370,371],{"key":20,"text":368,"correct":32},"泊位",{"key":24,"text":359,"correct":22},{"key":27,"text":357,"correct":22},{"key":30,"text":362,"correct":22},{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":27,"analysis":33},1129987,"港口工程质量检验中，防波堤工程按结构形式和施工及验收的分期划分单位工程；工程量大、工期长的同一结构形式的防波堤工程，可按（ ）划分为一个单位工程。",[376,378,380,382],{"key":20,"text":377,"correct":22},"100m左右",{"key":24,"text":379,"correct":22},"5000m左右",{"key":27,"text":381,"correct":32},"1000m左右",{"key":30,"text":383,"correct":22},"3000m左右",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":20,"analysis":33},1129988,"沉桩时，发现桩、锤、桩架有异常，应（ ）。",[388,390,392,394],{"key":20,"text":389,"correct":32},"立即停锤",{"key":24,"text":391,"correct":22},"立即向监理报告",{"key":27,"text":393,"correct":22},"密切注意观察",{"key":30,"text":395,"correct":22},"立即向业主报告",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":30,"analysis":33},1129989,"载人升降设备用钢丝绳的安全系数应不小于（ ）。",[400,402,404,406],{"key":20,"text":401,"correct":22},"5",{"key":24,"text":403,"correct":22},"8",{"key":27,"text":405,"correct":22},"10",{"key":30,"text":407,"correct":32},"14",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":20,"analysis":33},1129990,"起吊混凝土桩时，捆绑位置的偏差不得大于（ ）。",[412,414,416,418],{"key":20,"text":413,"correct":32},"200mm",{"key":24,"text":415,"correct":22},"250mm",{"key":27,"text":417,"correct":22},"300mm",{"key":30,"text":419,"correct":22},"350mm",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":24,"analysis":33},1129991,"用起重船助浮安装沉箱，起重船吊重不得超过其额定负荷的（ ）。",[424,426,428,430],{"key":20,"text":425,"correct":22},"70％",{"key":24,"text":427,"correct":32},"80％",{"key":27,"text":429,"correct":22},"90％",{"key":30,"text":431,"correct":22},"100％",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":30,"analysis":33},1129992,"船舶上使用的移动灯具的电压不得大于（ ），电路应设有过载和短路保护。",[436,438,440,442],{"key":20,"text":437,"correct":22},"12V",{"key":24,"text":439,"correct":22},"24V",{"key":27,"text":441,"correct":22},"36V",{"key":30,"text":443,"correct":32},"50V",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":24,"analysis":33},1129993,"耙吸挖泥船遇有不良工况船身摇晃较大时，吹填作业应立即停止，并（ ）。",[448,450,452,454],{"key":20,"text":449,"correct":22},"下锚驻位",{"key":24,"text":451,"correct":32},"拆除管线接口",{"key":27,"text":453,"correct":22},"放松锚缆",{"key":30,"text":455,"correct":22},"改用柔性管线",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":24,"analysis":33},1129994,"按照港口与航道工程施工用电安全生产的要求，施工现场必须实行（）制，所有电器设备必须做到“一机、一闸、一漏电保护器”。",[460,462,464,466],{"key":20,"text":461,"correct":22},"二相五线",{"key":24,"text":463,"correct":32},"三相五线",{"key":27,"text":465,"correct":22},"四相五线",{"key":30,"text":467,"correct":22},"二相四线",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":27,"analysis":33},1129995,"陆上作业时，当风力大于等于（ ）级时，应对设备采取防风固定措施。",[472,474,476,477],{"key":20,"text":473,"correct":22},"6",{"key":24,"text":475,"correct":22},"7",{"key":27,"text":403,"correct":32},{"key":30,"text":478,"correct":22},"9",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":27,"analysis":33},1129996,"起重吊装作业时，当被吊物的重量达到起重设备额定起重能力的（ ）及以上时，应进行试吊。",[483,484,485,486],{"key":20,"text":425,"correct":22},{"key":24,"text":427,"correct":22},{"key":27,"text":429,"correct":32},{"key":30,"text":487,"correct":22},"95％",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":30,"analysis":33},1129997,"起吊混凝土预制构件时，吊绳与水平夹角不得小于（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":22},"30°",{"key":24,"text":495,"correct":22},"35°",{"key":27,"text":497,"correct":22},"40°",{"key":30,"text":499,"correct":32},"45°",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":27,"analysis":33},1129999,"对于直立式防波堤概算扩大系数取（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":22},"1．01～1．03",{"key":24,"text":507,"correct":22},"1．02～1．04",{"key":27,"text":509,"correct":32},"1．02～1．05",{"key":30,"text":511,"correct":22},"1．03～1．05",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":24,"analysis":33},1130000,"编制概算时，可在套用本定额计算出定额直接费后（ ）。",[516,518,520,522],{"key":20,"text":517,"correct":22},"即可应用",{"key":24,"text":519,"correct":32},"乘以概算扩大系数",{"key":27,"text":521,"correct":22},"乘以折减系数",{"key":30,"text":523,"correct":22},"分不同情况分别乘以系数",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":30,"analysis":33},1130001,"定额直接费低于300万元的一般水工建筑项目，应计列小型工程增加费，按定额直接费的（ ）计算。",[528,530,532,534],{"key":20,"text":529,"correct":22},"2％",{"key":24,"text":531,"correct":22},"3％",{"key":27,"text":533,"correct":22},"4％",{"key":30,"text":535,"correct":32},"5％",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":20,"analysis":33},1130002,"（ ）不计概算扩大系数。",[540,542,544,546],{"key":20,"text":541,"correct":32},"大型土石方工程",{"key":24,"text":543,"correct":22},"直立式护岸",{"key":27,"text":545,"correct":22},"斜坡式引堤",{"key":30,"text":547,"correct":22},"斜坡式护岸",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":30,"analysis":33},1130003,"下列不属于工程船舶机械艘（台）班费用的是（ ）。",[552,554,556,558],{"key":20,"text":553,"correct":22},"一类费用",{"key":24,"text":555,"correct":22},"二类费用",{"key":27,"text":557,"correct":22},"车船税",{"key":30,"text":559,"correct":32},"管理费",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":24,"analysis":33},1130004,"下列不属于链斗挖泥船定额的是（）。",[564,566,568,570],{"key":20,"text":565,"correct":22},"基本定额",{"key":24,"text":567,"correct":32},"增转头定额",{"key":27,"text":569,"correct":22},"超挖深定额",{"key":30,"text":571,"correct":22},"超运距定额",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":24,"analysis":33},1130005,"根据《水运工程混凝土和砂浆材料用量定额》JTS 277—2019，细骨料以中（粗）砂为准，若采用细砂时，水泥用量和水增加（）。",[576,577,578,580],{"key":20,"text":529,"correct":22},{"key":24,"text":535,"correct":32},{"key":27,"text":579,"correct":22},"6％",{"key":30,"text":581,"correct":22},"8％",[583,586,589,592,595,598],{"id":15,"name":584,"category":7,"favorite":585},"领导干部任职前廉政法规知识测试题",92,{"id":587,"name":588,"category":7,"favorite":15},595,"建筑结构与设备",{"id":590,"name":591,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":593,"name":594,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":596,"name":597,"category":7,"favorite":8},534,"BIM工程师",{"id":599,"name":597,"category":7,"favorite":8},535]