[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-794-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":590},{"id":5,"name":6,"category":7,"favorite":8},794,"一建港口与航道工程实务","建筑工程",0,12,50,1132,[13,34,46,58,69,81,93,105,117,127,139,151,160,172,184,193,202,214,226,238,250,262,274,286,294,306,317,329,339,351,363,375,387,399,410,422,431,442,454,466,478,490,498,510,522,534,546,558,566,578],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1129905,1,"单选题","变更指示应由（ ）发出。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","发包人",false,{"key":24,"text":25,"correct":26},"B","监理人",true,{"key":28,"text":29,"correct":22},"C","设计人",{"key":31,"text":32,"correct":22},"D","质量监督人","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1129906,"最普遍、最常见和最易被对方接受的担保是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"不可撤销的银行备用信用证",{"key":24,"text":41,"correct":22},"保险公司的担保书",{"key":28,"text":43,"correct":26},"银行保证书",{"key":31,"text":45,"correct":22},"第三者保证书",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1129907,"下列保函形式中，（）不是我国港口与航道工程的工程担保保函形式。",[50,52,54,56],{"key":20,"text":51,"correct":22},"投标保函",{"key":24,"text":53,"correct":22},"履约保担保",{"key":28,"text":55,"correct":22},"预付款担保",{"key":31,"text":57,"correct":26},"质量保函",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1129908,"中标人应当就分包项目向（ ）负责。",[62,64,65,67],{"key":20,"text":63,"correct":22},"建设单位",{"key":24,"text":25,"correct":22},{"key":28,"text":66,"correct":22},"施工单位",{"key":31,"text":68,"correct":26},"招标人",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":24,"analysis":33},1129909,"质量保证金总预留比例不得高于工程价款结算总额的（ ）。",[73,75,77,79],{"key":20,"text":74,"correct":22},"1％",{"key":24,"text":76,"correct":26},"3％",{"key":28,"text":78,"correct":22},"5％",{"key":31,"text":80,"correct":22},"10％",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":28,"analysis":33},1129910,"承包人对所施工工程的照管和维护责任到（ ）为止。",[85,87,89,91],{"key":20,"text":86,"correct":22},"隐蔽工程验收合格",{"key":24,"text":88,"correct":22},"主体工程验收合格",{"key":28,"text":90,"correct":26},"工程接收证书颁发",{"key":31,"text":92,"correct":22},"工程交工并结算",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":24,"analysis":33},1129911,"承包人应在计划开工日期（ ）前，向发包人和监理人报送施工组织设计。",[97,99,101,103],{"key":20,"text":98,"correct":22},"5d",{"key":24,"text":100,"correct":26},"7d",{"key":28,"text":102,"correct":22},"14d",{"key":31,"text":104,"correct":22},"28d",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":31,"analysis":33},1129912,"承包人在自检合格后，填写隐蔽工程验收申请单，在覆盖前（ ）通知监理人进行验收。",[109,111,113,115],{"key":20,"text":110,"correct":22},"8h",{"key":24,"text":112,"correct":22},"12h",{"key":28,"text":114,"correct":22},"24h",{"key":31,"text":116,"correct":26},"48h",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":28,"analysis":33},1129913,"发包人应在监理人收到进度付款申请单后的（ ）内，将进度应付款支付给承包人。",[121,122,124,125],{"key":20,"text":102,"correct":22},{"key":24,"text":123,"correct":22},"21d",{"key":28,"text":104,"correct":26},{"key":31,"text":126,"correct":22},"30d",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":24,"analysis":33},1129914,"应当在海上打桩活动开始之日的（ ）天前向所涉及海区的主管机关递交发布海上航行警告、航行通告的书面申请。",[131,133,135,137],{"key":20,"text":132,"correct":22},"3",{"key":24,"text":134,"correct":26},"7",{"key":28,"text":136,"correct":22},"15",{"key":31,"text":138,"correct":22},"30",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":24,"analysis":33},1129915,"主管发布海上航行通告的机构是（ ）。",[143,145,147,149],{"key":20,"text":144,"correct":22},"所在地方主管交通的安技部门",{"key":24,"text":146,"correct":26},"海事局",{"key":28,"text":148,"correct":22},"国家海上安全局",{"key":31,"text":150,"correct":22},"地方交通厅、局",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":28,"analysis":33},1129916,"违反海上航行通告的当事人对处罚决定不服的，可以自接到处罚决定通知之日起（ ）天内向中华人民共和国海事部门申请复议。",[155,156,158,159],{"key":20,"text":134,"correct":22},{"key":24,"text":157,"correct":22},"10",{"key":28,"text":136,"correct":26},{"key":31,"text":138,"correct":22},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":28,"analysis":33},1129917,"违反海上航行警告和航行通告规定，造成海上交通事故，构成犯罪的，依法追究（ ）责任。",[164,166,168,170],{"key":20,"text":165,"correct":22},"民事",{"key":24,"text":167,"correct":22},"行政",{"key":28,"text":169,"correct":26},"刑事",{"key":31,"text":171,"correct":22},"玩忽职守法律",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":31,"analysis":33},1129918,"海上航行警告由国家主管机关或者其授权的机关以（）或者无线电话的形式发布。",[176,178,180,182],{"key":20,"text":177,"correct":22},"广播",{"key":24,"text":179,"correct":22},"电视",{"key":28,"text":181,"correct":22},"有线电话",{"key":31,"text":183,"correct":26},"无线电报",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":20,"analysis":33},1129919,"海事局应自收到书面申请次日起至申请的拟开始施工作业次日（ ）天前，作出施工作业是否符合通航安全的决定。",[188,189,190,192],{"key":20,"text":134,"correct":26},{"key":24,"text":157,"correct":22},{"key":28,"text":191,"correct":22},"12",{"key":31,"text":136,"correct":22},{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":20,"analysis":33},1129920,"在海上拖运超大型沉箱施工应当在启拖开始之日（ ）天前向启拖地所在海区的区域主管机关递交发布海上航行警告、航行通告的书面申请。",[197,198,200,201],{"key":20,"text":132,"correct":26},{"key":24,"text":199,"correct":22},"5",{"key":28,"text":134,"correct":22},{"key":31,"text":157,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},1129921,"港口与航道工程的技术交底应当做到（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":26},"技术交底要填写技术交底记录单",{"key":24,"text":209,"correct":22},"正式施工前要一次全面交底完毕",{"key":28,"text":211,"correct":22},"将施工组织设计的主要方案交代清楚",{"key":31,"text":213,"correct":22},"项目部技术人员清楚设计意图",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":28,"analysis":33},1129922,"港口与航道工程项目技术管理的基本任务中，不包括（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"确保项目技术方案科学",{"key":24,"text":221,"correct":22},"工艺与工序合理",{"key":28,"text":223,"correct":26},"直接、及时向业主报送施工组织设计",{"key":31,"text":225,"correct":22},"技术管理流程受控、技术资料规范",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},1129923,"港口与航道工程图纸的熟悉与审查应由（ ）来负责组织。",[230,232,234,236],{"key":20,"text":231,"correct":22},"项目总工程师",{"key":24,"text":233,"correct":26},"项目经理",{"key":28,"text":235,"correct":22},"设计代表",{"key":31,"text":237,"correct":22},"总监理工程师",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1129924,"为搞好工程的技术总结，工程竣工后（ ）是不适宜的。",[242,244,246,248],{"key":20,"text":243,"correct":26},"安排技术总结计划",{"key":24,"text":245,"correct":22},"确定总结题材",{"key":28,"text":247,"correct":22},"整理已经收集和积累的资料",{"key":31,"text":249,"correct":22},"由亲自参加项目的施工者执笔",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},1129925,"工程所用的原材料、半成品、成品、构配件和设备进场时应进行（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"检验",{"key":24,"text":257,"correct":26},"验收",{"key":28,"text":259,"correct":22},"检定",{"key":31,"text":261,"correct":22},"检测",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},1129926,"工程所用的原材料中涉及结构耐久性的应按有关标准的规定进行抽样检验，并经（ ）认可。",[266,268,270,272],{"key":20,"text":267,"correct":26},"监理单位",{"key":24,"text":269,"correct":22},"质检单位",{"key":28,"text":271,"correct":22},"设计单位",{"key":31,"text":273,"correct":22},"质监单位",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},1129927,"造成直接经济损失1000万元以上5000万元以下的质量事故是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"特别重大质量事故",{"key":24,"text":281,"correct":26},"较大质量事故",{"key":28,"text":283,"correct":22},"重大质量事故",{"key":31,"text":285,"correct":22},"一般质量事故",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":31,"analysis":33},1129928,"工程项目交工验收前，（ ）为工程质量事故报告的责任单位。",[290,291,292,293],{"key":20,"text":273,"correct":22},{"key":24,"text":267,"correct":22},{"key":28,"text":63,"correct":22},{"key":31,"text":66,"correct":26},{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":31,"analysis":33},1129929,"港口与航道总承包二级资质可承担的港口与航道工程包括（ ）。",[298,300,302,304],{"key":20,"text":299,"correct":22},"人工岛及平台",{"key":24,"text":301,"correct":22},"海上风电",{"key":28,"text":303,"correct":22},"各种升船机",{"key":31,"text":305,"correct":26},"内河1000吨级以下航道工程",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":28,"analysis":33},1129930,"港口与海岸工程专业承包二级资质可承担的港口与海岸工程施工包括（ ）。",[310,311,313,315],{"key":20,"text":301,"correct":22},{"key":24,"text":312,"correct":22},"1500m以下围堤护岸工程",{"key":28,"text":314,"correct":26},"5万t级以下船坞",{"key":31,"text":316,"correct":22},"水深8m的防波堤",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":28,"analysis":33},1129931,"高桩码头工程施工组织设计编制中，“各项资源的需用计划”包括：劳动力需用计划、材料需用计划、（ ）、预制构件和半成品需用计划等。",[321,323,325,327],{"key":20,"text":322,"correct":22},"工资计划",{"key":24,"text":324,"correct":22},"混凝土试验计划",{"key":28,"text":326,"correct":26},"施工船舶和机械需用计划",{"key":31,"text":328,"correct":22},"分期分批竣工项目计划",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":24,"analysis":33},1129932,"施工组织设计应在（ ）的领导下编写，并经（ ）审查后报企业审定。",[333,334,335,337],{"key":20,"text":231,"correct":22},{"key":24,"text":233,"correct":26},{"key":28,"text":336,"correct":22},"项目技术主管",{"key":31,"text":338,"correct":22},"项目工程主管",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":24,"analysis":33},1129933,"在（ ）将经项目经理审查、企业审定、企业法人代表签发批准的施工组织设计报送业主和工程监理单位。",[343,345,347,349],{"key":20,"text":344,"correct":22},"宣布中标之后",{"key":24,"text":346,"correct":26},"工程开工之前",{"key":28,"text":348,"correct":22},"工程开工之后",{"key":31,"text":350,"correct":22},"工程开工令下达之后",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":20,"analysis":33},1129934,"在沉箱重力式码头施工中，沉箱安放就位填充完毕后，后方抛石棱体及倒滤层的抛填，应（ ）。",[355,357,359,361],{"key":20,"text":356,"correct":26},"从墙后开始抛填",{"key":24,"text":358,"correct":22},"在岸边从陆上向海中推填",{"key":28,"text":360,"correct":22},"根据施工方便随机抛填",{"key":31,"text":362,"correct":22},"海、陆双向对头抛填",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":28,"analysis":33},1129935,"在沉箱重力式码头施工中，沉箱安放就位填充完毕后，后方抛石棱体及倒滤层应从墙后开始抛填，是为了（ ）。",[367,369,371,373],{"key":20,"text":368,"correct":22},"增强沉箱抗浪的能力",{"key":24,"text":370,"correct":22},"保持沉箱的稳定性",{"key":28,"text":372,"correct":26},"避免把岸坡淤泥挤入棱体下",{"key":31,"text":374,"correct":22},"保持岸坡稳定",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":31,"analysis":33},1129936,"下列施工条件中，不属于自然条件的是（ ）。",[379,381,383,385],{"key":20,"text":380,"correct":22},"水文",{"key":24,"text":382,"correct":22},"地震",{"key":28,"text":384,"correct":22},"地质",{"key":31,"text":386,"correct":26},"水陆交通",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":24,"analysis":33},1129937,"在编制斜坡堤施工组织设计时，试验检测部分应包括（ ）等内容。",[391,393,395,397],{"key":20,"text":392,"correct":22},"平面控制测量",{"key":24,"text":394,"correct":26},"工地试验室",{"key":28,"text":396,"correct":22},"高程控制测量",{"key":31,"text":398,"correct":22},"变形观测",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":28,"analysis":33},1129938,"以下属于施工自然条件的是（ ）。",[403,405,407,408],{"key":20,"text":404,"correct":22},"交通",{"key":24,"text":406,"correct":22},"补给",{"key":28,"text":380,"correct":26},{"key":31,"text":409,"correct":22},"修船",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":28,"analysis":33},1129939,"筑坝工程的常规施工工序包括①测量放样；②水上沉排；③坝体表面整理；④水上抛石；⑤水上抛枕；⑥坝根接岸处理等项，其一般施工流程为（ ）。",[414,416,418,420],{"key":20,"text":415,"correct":22},"①②③④⑤⑥",{"key":24,"text":417,"correct":22},"②①⑥④⑤③",{"key":28,"text":419,"correct":26},"①⑥②⑤④③",{"key":31,"text":421,"correct":22},"②⑤④⑥③①",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":24,"analysis":33},1129940,"以下属于疏浚与吹填工程的施工组织条件的是（ ）。",[426,427,428,429],{"key":20,"text":384,"correct":22},{"key":24,"text":409,"correct":26},{"key":28,"text":380,"correct":22},{"key":31,"text":430,"correct":22},"气象",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":24,"analysis":33},1129941,"港口与航道工程的施工组织设计，应在项目经理领导下，由（）组织编写。",[435,437,438,440],{"key":20,"text":436,"correct":22},"项目副经理",{"key":24,"text":231,"correct":26},{"key":28,"text":439,"correct":22},"项目部工程部长",{"key":31,"text":441,"correct":22},"项目部技术部长",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":28,"analysis":33},1129942,"高桩码头工程施工组织设计编制中，“自然条件”包括岸线和水深情况、水位资料、潮流资料、风、气温、降雨、（ ）等。",[446,448,450,452],{"key":20,"text":447,"correct":22},"交通条件",{"key":24,"text":449,"correct":22},"水电供应条件",{"key":28,"text":451,"correct":26},"工程地质条件",{"key":31,"text":453,"correct":22},"建设项目地区预制构件加工能力",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":28,"analysis":33},1129943,"高桩码头工程施工组织设计编制中，高桩码头施工工序主要有施工挖泥、沉桩、构件安装、现浇混凝土和岸坡施工等。沉桩是（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"一般工序",{"key":24,"text":461,"correct":22},"主要工序",{"key":28,"text":463,"correct":26},"关键工序",{"key":31,"text":465,"correct":22},"重要工序",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":28,"analysis":33},1129944,"高桩码头工程施工组织设计编制中，分析和确定施工特点、难点是施工的（ ）问题。",[470,472,474,476],{"key":20,"text":471,"correct":22},"特殊",{"key":24,"text":473,"correct":22},"主要",{"key":28,"text":475,"correct":26},"关键",{"key":31,"text":477,"correct":22},"重要",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":28,"analysis":33},1129945,"实现在施工组织设计中所确定的（ ）是编制施工组织设计要实现的最终效果和目的。",[482,484,486,488],{"key":20,"text":483,"correct":22},"最优施工方案",{"key":24,"text":485,"correct":22},"协调各方面的关系",{"key":28,"text":487,"correct":26},"技术经济指标",{"key":31,"text":489,"correct":22},"统筹安排各项工作",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},1129946,"以下属于疏浚与吹填施工组织条件的是（ ）。",[494,495,496,497],{"key":20,"text":384,"correct":22},{"key":24,"text":409,"correct":26},{"key":28,"text":380,"correct":22},{"key":31,"text":430,"correct":22},{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":31,"analysis":33},1129947,"吹填工程量计算时应考虑（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":22},"超深量",{"key":24,"text":505,"correct":22},"超宽量",{"key":28,"text":507,"correct":22},"超挖量",{"key":31,"text":509,"correct":26},"沉降量",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":31,"analysis":33},1129948,"航道整治工程施工组织设计中应编制资源需求供应计划，其内容应包括（ ）。",[514,516,518,520],{"key":20,"text":515,"correct":22},"施工准备工作计划",{"key":24,"text":517,"correct":22},"外部资源需求计划",{"key":28,"text":519,"correct":22},"主要分部（项）工程施工网络计划及说明",{"key":31,"text":521,"correct":26},"劳动力需求量计划",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":28,"analysis":33},1129949,"在对进度计划调整时，大量超前领先的非关键线路（ ）。",[526,528,530,532],{"key":20,"text":527,"correct":22},"应继续保持其领先地位",{"key":24,"text":529,"correct":22},"对于保证进度计划是有利的",{"key":28,"text":531,"correct":26},"可能受其他线路发展的制约，中途不得不临时停工",{"key":31,"text":533,"correct":22},"可能转化为关键线路",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":28,"analysis":33},1129950,"施工图预算可以由（ ）负责编制或委托有资格的造价咨询公司编制。",[538,540,542,544],{"key":20,"text":539,"correct":22},"承担建设的建设单位",{"key":24,"text":541,"correct":22},"承担施工的施工单位",{"key":28,"text":543,"correct":26},"承担设计任务的设计单位",{"key":31,"text":545,"correct":22},"承担监理的监理单位",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":24,"analysis":33},1129951,"下列沿海港口工程中，按二类工程施工取费的是（ ）。",[550,552,554,556],{"key":20,"text":551,"correct":22},"直立式防波堤",{"key":24,"text":553,"correct":26},"码头吨级\u003C10000t",{"key":28,"text":555,"correct":22},"海上孤立建筑物",{"key":31,"text":557,"correct":22},"取水构筑物",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":24,"analysis":33},1129952,"工程概算是初步设计文件的重要组成部分,应由项目（ ）根据工程的构成和工程造价管理的有关规定及计价标准编制。",[562,563,564,565],{"key":20,"text":63,"correct":22},{"key":24,"text":271,"correct":26},{"key":28,"text":66,"correct":22},{"key":31,"text":267,"correct":22},{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":20,"analysis":33},1129953,"总概算应控制在建设项目工程可行性研究阶段批准的（ ）允许范围内。",[570,572,574,576],{"key":20,"text":571,"correct":26},"投资总估算",{"key":24,"text":573,"correct":22},"最高限额",{"key":28,"text":575,"correct":22},"全部费用",{"key":31,"text":577,"correct":22},"总投资额",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":31,"analysis":33},1129954,"下列不属于工程概算文件的选项是（ ）。",[582,584,586,588],{"key":20,"text":583,"correct":22},"封面",{"key":24,"text":585,"correct":22},"扉页",{"key":28,"text":587,"correct":22},"编制说明",{"key":31,"text":589,"correct":26},"编制依据",[591,594,597,600,603,606],{"id":15,"name":592,"category":7,"favorite":593},"领导干部任职前廉政法规知识测试题",92,{"id":595,"name":596,"category":7,"favorite":15},595,"建筑结构与设备",{"id":598,"name":599,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":601,"name":602,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":604,"name":605,"category":7,"favorite":8},534,"BIM工程师",{"id":607,"name":605,"category":7,"favorite":8},535]