[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-794-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":581},{"id":5,"name":6,"category":7,"favorite":8},794,"一建港口与航道工程实务","建筑工程",0,11,50,1132,[13,34,42,54,66,78,90,102,114,126,138,150,162,174,186,198,207,219,231,243,254,266,278,290,302,314,322,334,344,356,364,376,388,397,409,420,432,443,453,462,474,485,495,505,517,528,539,549,557,569],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1129855,1,"单选题","检查混凝土浇筑过程坍落度、含气量、试块留置是否符合规范要求，属于（ ）的督查内容。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","施工工序",false,{"key":24,"text":25,"correct":26},"B","施工工艺",true,{"key":28,"text":29,"correct":22},"C","实体质量",{"key":31,"text":32,"correct":22},"D","质量管理行为","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1129856,"检查现浇混凝土与构件接槎以及分层浇注施工缝连接、错牙情况，属于（ ）的督查内容。",[38,39,40,41],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":22},{"id":43,"libraryId":5,"type":15,"typeLabel":16,"stem":44,"options":45,"answer":28,"analysis":33},1129857,"施工单位不按照施工技术标准施工造成工程质量一般事故的，处所涉及单位工程合同价款（ ）的罚款。",[46,48,50,52],{"key":20,"text":47,"correct":22},"1％",{"key":24,"text":49,"correct":22},"1％以上2％以下",{"key":28,"text":51,"correct":26},"2％以上3％以下",{"key":31,"text":53,"correct":22},"3％以上4％以下",{"id":55,"libraryId":5,"type":15,"typeLabel":16,"stem":56,"options":57,"answer":24,"analysis":33},1129858,"交通运输主管部门应当制定（ ）工程质量监督检查计划。",[58,60,62,64],{"key":20,"text":59,"correct":22},"季度",{"key":24,"text":61,"correct":26},"年度",{"key":28,"text":63,"correct":22},"月度",{"key":31,"text":65,"correct":22},"半年度",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":24,"analysis":33},1129859,"水运工程交工验收前，（ ）应当组织对工程质量是否合格进行检测，出具交工验收质量检测报告。",[70,72,74,76],{"key":20,"text":71,"correct":22},"施工单位",{"key":24,"text":73,"correct":26},"建设单位",{"key":28,"text":75,"correct":22},"监理单位",{"key":31,"text":77,"correct":22},"质检单位",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":28,"analysis":33},1129860,"根据行业监管重点，对水运工程建设存在的突出质量安全问题所采取的针对性抽查称之为（ ）。",[82,84,86,88],{"key":20,"text":83,"correct":22},"专项检查",{"key":24,"text":85,"correct":22},"综合检查",{"key":28,"text":87,"correct":26},"专项督查",{"key":31,"text":89,"correct":22},"综合督查",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":24,"analysis":33},1129861,"一般事故处理工作应当在30天内做出批复，批复时间可以适当延长，但延长的时间最长不超过（ ）天。",[94,96,98,100],{"key":20,"text":95,"correct":22},"60",{"key":24,"text":97,"correct":26},"30",{"key":28,"text":99,"correct":22},"45",{"key":31,"text":101,"correct":22},"90",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":31,"analysis":33},1129862,"水上交通特别重大事故，指造成30人以上死亡（含失踪）的，或者100人以上重伤的，或者船舶溢油（ ）t以上致水域污染的，或者1亿元以上直接经济损失的事故。",[106,108,110,112],{"key":20,"text":107,"correct":22},"300",{"key":24,"text":109,"correct":22},"500",{"key":28,"text":111,"correct":22},"800",{"key":31,"text":113,"correct":26},"1000",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":31,"analysis":33},1129863,"港口与航道工程施工中伤亡事故，是由于人的不安全行为和（ ）的不安全状态两大因素作用的结果。",[118,120,122,124],{"key":20,"text":119,"correct":22},"条件",{"key":24,"text":121,"correct":22},"环境",{"key":28,"text":123,"correct":22},"施工",{"key":31,"text":125,"correct":26},"物",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":28,"analysis":33},1129864,"采用专家调查法进行安全风险评估的评估小组成员（专家）不少于（ ）。",[130,132,134,136],{"key":20,"text":131,"correct":22},"3人",{"key":24,"text":133,"correct":22},"4人",{"key":28,"text":135,"correct":26},"5人",{"key":31,"text":137,"correct":22},"7人",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":28,"analysis":33},1129865,"伤亡事故预防，就是要做好（ ），消除人和物的不安全因素，实现作业行为和作业条件安全化。",[142,144,146,148],{"key":20,"text":143,"correct":22},"安全教育",{"key":24,"text":145,"correct":22},"安全技术交底",{"key":28,"text":147,"correct":26},"安全生产风险评估",{"key":31,"text":149,"correct":22},"持证上岗",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":28,"analysis":33},1129866,"工程施工合同段安全生产管理的第一责任人是（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":22},"项目安全总监",{"key":24,"text":157,"correct":22},"项目安全副经理",{"key":28,"text":159,"correct":26},"项目经理",{"key":31,"text":161,"correct":22},"项目书记",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":24,"analysis":33},1129867,"工程项目事故隐患排查治理的责任主体是（ ）。",[166,168,170,172],{"key":20,"text":167,"correct":22},"县以上安全监督部门",{"key":24,"text":169,"correct":26},"公路水运施工企业",{"key":28,"text":171,"correct":22},"水运建设单位",{"key":31,"text":173,"correct":22},"安全监理工程师",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":31,"analysis":33},1129868,"每年台风季节到来前，（）要编制大型施工船舶的防台预案。",[178,180,182,184],{"key":20,"text":179,"correct":22},"施工企业",{"key":24,"text":181,"correct":22},"企业的船机管理部门",{"key":28,"text":183,"correct":22},"船长",{"key":31,"text":185,"correct":26},"有船单位和项目经理部",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":24,"analysis":33},1129869,"对单船或两艘拖轮及两艘以上执行同一任务，均应指定（ ）担任总船长。",[190,192,194,196],{"key":20,"text":191,"correct":22},"被拖船船长",{"key":24,"text":193,"correct":26},"主拖船船长",{"key":28,"text":195,"correct":22},"助拖船船长",{"key":31,"text":197,"correct":22},"任意船长均可",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":31,"analysis":33},1129870,"编队（组）航行时，（ ）负责主持制定拖航计划和安全实施方案。",[202,203,205,206],{"key":20,"text":191,"correct":22},{"key":24,"text":204,"correct":22},"任一拖船船长",{"key":28,"text":195,"correct":22},{"key":31,"text":193,"correct":26},{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":31,"analysis":33},1129871,"出海拖航时，被拖船在限定航区内，为短途拖航，超越限制航区或在限制航区超过（ ）时为长途拖航。",[211,213,215,217],{"key":20,"text":212,"correct":22},"50海里",{"key":24,"text":214,"correct":22},"300海里",{"key":28,"text":216,"correct":22},"100海里",{"key":31,"text":218,"correct":26},"200海里",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":28,"analysis":33},1129872,"近海航区，系指中国渤海、黄海及东海距岸不超过（ ）海里的海域。",[223,225,227,229],{"key":20,"text":224,"correct":22},"100",{"key":24,"text":226,"correct":22},"150",{"key":28,"text":228,"correct":26},"200",{"key":31,"text":230,"correct":22},"250",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":28,"analysis":33},1129873,"大型施工船舶防风、防台是指船舶防御风力在（ ）级以上的季风和热带气旋。",[235,237,239,241],{"key":20,"text":236,"correct":22},"8",{"key":24,"text":238,"correct":22},"7",{"key":28,"text":240,"correct":26},"6",{"key":31,"text":242,"correct":22},"5",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":20,"analysis":33},1129874,"台风是中心风力达（ ）级以上的风。",[247,249,251,252],{"key":20,"text":248,"correct":26},"12",{"key":24,"text":250,"correct":22},"10",{"key":28,"text":236,"correct":22},{"key":31,"text":253,"correct":22},"13",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":31,"analysis":33},1129875,"热带风暴：中心风力达（ ）级的风。",[258,260,262,264],{"key":20,"text":259,"correct":22},"6～7",{"key":24,"text":261,"correct":22},"5～6",{"key":28,"text":263,"correct":22},"10～11",{"key":31,"text":265,"correct":26},"8～9",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":24,"analysis":33},1129876,"大型施工船舶防台准备中，自航船舶撤离时机应根据（）进行计算。",[270,272,274,276],{"key":20,"text":271,"correct":22},"确保在6级大风范围半径到达工地5h前抵达防台锚地",{"key":24,"text":273,"correct":26},"确保在8级大风范围半径到达工地5h前抵达防台锚地",{"key":28,"text":275,"correct":22},"确保在6级大风范围半径到达工地8h前抵达防台锚地",{"key":31,"text":277,"correct":22},"确保在8级大风范围半径到达工地8h前抵达防台锚地",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":28,"analysis":33},1129877,"大型工程船舶拖航、调遣作业中，负责拖航全程管理的总指挥应由（）担任。",[282,284,286,288],{"key":20,"text":283,"correct":22},"企业船机主管部门负责人",{"key":24,"text":285,"correct":22},"企业调度部门负责人",{"key":28,"text":287,"correct":26},"主拖船长",{"key":31,"text":289,"correct":22},"被拖船长",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":28,"analysis":33},1129878,"（ ）不属大型施工船舶。",[294,296,298,300],{"key":20,"text":295,"correct":22},"起重船",{"key":24,"text":297,"correct":22},"打桩船",{"key":28,"text":299,"correct":26},"大型交通船",{"key":31,"text":301,"correct":22},"挖泥船",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":20,"analysis":33},1129879,"执行拖航任务时，任何船只（ ）。",[306,308,310,312],{"key":20,"text":307,"correct":26},"严禁搭乘无关人员随航",{"key":24,"text":309,"correct":22},"只能搭乘1人",{"key":28,"text":311,"correct":22},"只能搭乘2人",{"key":31,"text":313,"correct":22},"只能搭乘3人",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":20,"analysis":33},1129880,"按照有关安全技术操作规程和实施细则，由（ ）负责组织对所有拖航船舶的安全技术状态进行全面检查和封舱加固。",[318,319,320,321],{"key":20,"text":287,"correct":26},{"key":24,"text":191,"correct":22},{"key":28,"text":195,"correct":22},{"key":31,"text":197,"correct":22},{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},1129881,"中心风力12级以上的风被称为（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":26},"台风",{"key":24,"text":329,"correct":22},"热带风暴",{"key":28,"text":331,"correct":22},"强热带风暴",{"key":31,"text":333,"correct":22},"热带低压",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},1129882,"“在台风严重威胁中”，系指船舶于未来（ ）h以内，遭遇风力可能达到6级以上。",[338,340,341,343],{"key":20,"text":339,"correct":22},"24",{"key":24,"text":248,"correct":26},{"key":28,"text":342,"correct":22},"48",{"key":31,"text":240,"correct":22},{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":24,"analysis":33},1129883,"（ ），有船单位和项目经理部要编制防台预案。",[348,350,352,354],{"key":20,"text":349,"correct":22},"每年进入台风季节后",{"key":24,"text":351,"correct":26},"每年台风季节到来前",{"key":28,"text":353,"correct":22},"每年年初",{"key":31,"text":355,"correct":22},"任何时候",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":20,"analysis":33},1129884,"船舶撤离时机应能确保自航施工船舶在（ ）级大风范围半径到达工地5h前抵达防台锚地。",[360,361,362,363],{"key":20,"text":236,"correct":26},{"key":24,"text":238,"correct":22},{"key":28,"text":240,"correct":22},{"key":31,"text":242,"correct":22},{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":28,"analysis":33},1129885,"以下船舶需在6级大风范围半径到达工地5h前抵达防台锚地的是（ ）。",[368,370,372,374],{"key":20,"text":369,"correct":22},"自航耙吸式挖泥船",{"key":24,"text":371,"correct":22},"拖轮",{"key":28,"text":373,"correct":26},"非自航铰吸式挖泥船",{"key":31,"text":375,"correct":22},"自航泥驳",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":28,"analysis":33},1129886,"水上水下活动通航安全监督管理工作的负责单位是（ ）。",[380,382,384,386],{"key":20,"text":381,"correct":22},"国务院交通运输主管部门",{"key":24,"text":383,"correct":22},"各地安全监督部门",{"key":28,"text":385,"correct":26},"国家海事管理机构",{"key":31,"text":387,"correct":22},"各地港务监督",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":24,"analysis":33},1129887,"自资格预审文件停止发售之日起至提交资格预审申请文件截止之日止，不得少于（ ）日。",[392,394,395,396],{"key":20,"text":393,"correct":22},"3",{"key":24,"text":242,"correct":26},{"key":28,"text":238,"correct":22},{"key":31,"text":250,"correct":22},{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":20,"analysis":33},1129888,"水运工程施工开标由（ ）组织并主持，投标人的法定代表人或其授权的代理人应到会。",[401,403,405,407],{"key":20,"text":402,"correct":26},"招标人",{"key":24,"text":404,"correct":22},"招投标管理部门",{"key":28,"text":406,"correct":22},"招标机构上级管理部门",{"key":31,"text":408,"correct":22},"评标委员会",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":28,"analysis":33},1129889,"水运工程实行邀请招标的，应报（ ）审批。",[413,415,417,419],{"key":20,"text":414,"correct":22},"上级管理部门",{"key":24,"text":416,"correct":22},"港区海事部门",{"key":28,"text":418,"correct":26},"交通运输主管部门",{"key":31,"text":404,"correct":22},{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":24,"analysis":33},1129890,"水运工程依法必须招标的项目，全部使用国有资金投资，或者国有资金投资占控股或主导地位的，应当（ ）。",[424,426,428,430],{"key":20,"text":425,"correct":22},"邀请招标",{"key":24,"text":427,"correct":26},"公开招标",{"key":28,"text":429,"correct":22},"议标",{"key":31,"text":431,"correct":22},"由招标人选择，主管部门批准",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":20,"analysis":33},1129891,"水运工程招标人自招标文件开始发售之日起至潜在投标人提交投标文件截止之日止最短不得少于（ ）日。",[436,438,439,441],{"key":20,"text":437,"correct":26},"20",{"key":24,"text":97,"correct":22},{"key":28,"text":440,"correct":22},"35",{"key":31,"text":442,"correct":22},"40",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":24,"analysis":33},1129892,"水运工程施工招标中，在资格预审文件停止发售之日止获取资格预审文件的潜在投标人少于（ ）个的，招标人应当依照规定进行重新招标。",[447,449,450,452],{"key":20,"text":448,"correct":22},"2",{"key":24,"text":393,"correct":26},{"key":28,"text":451,"correct":22},"4",{"key":31,"text":242,"correct":22},{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":20,"analysis":33},1129893,"水运工程建设项目施工单项合同估价在（ ）万元人民币以上的工程，必须进行招标。",[457,458,459,461],{"key":20,"text":228,"correct":26},{"key":24,"text":107,"correct":22},{"key":28,"text":460,"correct":22},"400",{"key":31,"text":109,"correct":22},{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":28,"analysis":33},1129894,"招标人和中标人应当自中标通知书发出之日起（ ）内签署合同。",[466,468,470,472],{"key":20,"text":467,"correct":22},"15d",{"key":24,"text":469,"correct":22},"28d",{"key":28,"text":471,"correct":26},"30d",{"key":31,"text":473,"correct":22},"45d",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":24,"analysis":33},1129895,"中标人经（ ）同意，可将中标项目的部分工作分包给他人完成。",[478,480,481,483],{"key":20,"text":479,"correct":22},"项目监督部分",{"key":24,"text":402,"correct":26},{"key":28,"text":482,"correct":22},"招标管理机构",{"key":31,"text":484,"correct":22},"质量监督机构",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":28,"analysis":33},1129896,"港口与航道工程施工合同，（ ）单位应该按合同条款约定的数量向施工单位提供工程地质报告以及水准点等技术资料。",[489,491,492,493],{"key":20,"text":490,"correct":22},"设计单位",{"key":24,"text":75,"correct":22},{"key":28,"text":73,"correct":26},{"key":31,"text":494,"correct":22},"招标单位",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":24,"analysis":33},1129897,"航行通告、抛泥区许可证应由（ ）负责办理。",[499,500,501,503],{"key":20,"text":71,"correct":22},{"key":24,"text":73,"correct":26},{"key":28,"text":502,"correct":22},"施工单位与建设单位共同",{"key":31,"text":504,"correct":22},"施工单位与政府有关部门",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":31,"analysis":33},1129898,"合同成立的地点是（ ）。",[509,511,513,515],{"key":20,"text":510,"correct":22},"项目所在地",{"key":24,"text":512,"correct":22},"业主注册地",{"key":28,"text":514,"correct":22},"递交标书地",{"key":31,"text":516,"correct":26},"签字或盖章地",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":24,"analysis":33},1129899,"发包人向承包人无偿提供符合合同约定的施工水域或场地的时间，是在计划开工日期（ ）前。",[521,523,525,527],{"key":20,"text":522,"correct":22},"7d",{"key":24,"text":524,"correct":26},"14d",{"key":28,"text":526,"correct":22},"21d",{"key":31,"text":469,"correct":22},{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":20,"analysis":33},1129900,"设计交底会的主持方是（ ）。",[532,534,535,537],{"key":20,"text":533,"correct":26},"发包人",{"key":24,"text":490,"correct":22},{"key":28,"text":536,"correct":22},"承包人",{"key":31,"text":538,"correct":22},"监理人",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":28,"analysis":33},1129901,"发包人需更换其代表时，应至少提前（ ）书面通知承包人。",[543,545,546,548],{"key":20,"text":544,"correct":22},"3d",{"key":24,"text":522,"correct":22},{"key":28,"text":547,"correct":26},"10d",{"key":31,"text":524,"correct":22},{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":28,"analysis":33},1129902,"发包人向承包人提供施工现场地质、地下管线、测量控制点交验等资料的时间，是在计划开工日期（ ）前。",[553,554,555,556],{"key":20,"text":522,"correct":22},{"key":24,"text":547,"correct":22},{"key":28,"text":524,"correct":26},{"key":31,"text":526,"correct":22},{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":31,"analysis":33},1129903,"分项工程的开工应事先得到监理人的书面同意，承包人应提前（ ）将申请开工的书面通知报送监理人。",[561,563,565,567],{"key":20,"text":562,"correct":22},"8h",{"key":24,"text":564,"correct":22},"12h",{"key":28,"text":566,"correct":22},"24h",{"key":31,"text":568,"correct":26},"48h",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":28,"analysis":33},1129904,"调整工程量清单项目的综合单价的前提，是依据该单项工程量的变化幅度和对合同总价影响幅度确定。当变化幅度达（ ）时可调整。",[573,575,577,579],{"key":20,"text":574,"correct":22},"单项超10％且总价超2％",{"key":24,"text":576,"correct":22},"单项超10％且总价超3％",{"key":28,"text":578,"correct":26},"单项超20％且总价超2％",{"key":31,"text":580,"correct":22},"单项超20％且总价超3％",[582,585,588,591,594,597],{"id":15,"name":583,"category":7,"favorite":584},"领导干部任职前廉政法规知识测试题",92,{"id":586,"name":587,"category":7,"favorite":15},595,"建筑结构与设备",{"id":589,"name":590,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":592,"name":593,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":595,"name":596,"category":7,"favorite":8},534,"BIM工程师",{"id":598,"name":596,"category":7,"favorite":8},535]