[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-794-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":606},{"id":5,"name":6,"category":7,"favorite":8},794,"一建港口与航道工程实务","建筑工程",0,1,50,1132,[13,33,45,57,69,81,93,105,117,129,141,153,165,177,189,201,213,225,237,249,261,273,284,296,308,320,330,338,350,362,374,386,398,408,420,428,440,451,463,475,487,499,511,523,535,547,558,570,582,594],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":19,"analysis":32},1129130,"单选题","混凝土插入式振动器的振捣顺序宜（ ），移动问距不应大于振动器有效半径的1．5倍。",[18,22,26,29],{"key":19,"text":20,"correct":21},"A","从近模板处开始，先外后内",true,{"key":23,"text":24,"correct":25},"B","从浇筑中心处开始，先内后外",false,{"key":27,"text":28,"correct":25},"C","从底部开始，先下后上",{"key":30,"text":31,"correct":25},"D","从一端向另一端","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":27,"analysis":32},1129131,"对于底面积为15m×6m的沉箱结构，基床夯实后，当基床顶面补抛块石的连续面积超过（ ），且厚度普遍大于0．5m时，就需要作补夯处理。",[37,39,41,43],{"key":19,"text":38,"correct":25},"10m2",{"key":23,"text":40,"correct":25},"20m2",{"key":27,"text":42,"correct":21},"30m2",{"key":30,"text":44,"correct":25},"40m2",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":19,"analysis":32},1129132,"重力式方块码头为墩式建筑物时，方块安装以墩为单位，逐墩安装，每个墩（ ）逐层安装。",[49,51,53,55],{"key":19,"text":50,"correct":21},"由一边的一角开始",{"key":23,"text":52,"correct":25},"由一端向另一端安装",{"key":27,"text":54,"correct":25},"由中间向四周安装",{"key":30,"text":56,"correct":25},"先安外侧，后安内侧",{"id":58,"libraryId":5,"type":9,"typeLabel":15,"stem":59,"options":60,"answer":23,"analysis":32},1129133,"板桩建筑物沉桩施工中，板桩偏移轴线产生平面扭转时，可（ ），使墙面平滑过渡。",[61,63,65,67],{"key":19,"text":62,"correct":25},"加异形钢板桩的方法进行调整",{"key":23,"text":64,"correct":21},"在后沉的板桩中逐根纠正",{"key":27,"text":66,"correct":25},"采用修整桩边的方法逐渐调整",{"key":30,"text":68,"correct":25},"调整打桩架的位置逐渐调整",{"id":70,"libraryId":5,"type":9,"typeLabel":15,"stem":71,"options":72,"answer":23,"analysis":32},1129134,"当钢丝石笼垫单层高度超过（ ）时，充填石料时应在石笼网垫周边采取支护措施，确保四周隔板竖直整齐。",[73,75,77,79],{"key":19,"text":74,"correct":25},"20cm",{"key":23,"text":76,"correct":21},"30cm",{"key":27,"text":78,"correct":25},"40cm",{"key":30,"text":80,"correct":25},"50cm",{"id":82,"libraryId":5,"type":9,"typeLabel":15,"stem":83,"options":84,"answer":30,"analysis":32},1129136,"板桩建筑物沉桩时导向梁距板墙顶的距离应（ ）替打套入桩的长度。",[85,87,89,91],{"key":19,"text":86,"correct":25},"小于",{"key":23,"text":88,"correct":25},"等于",{"key":27,"text":90,"correct":25},"略大于",{"key":30,"text":92,"correct":21},"大于",{"id":94,"libraryId":5,"type":9,"typeLabel":15,"stem":95,"options":96,"answer":30,"analysis":32},1129137,"斜坡堤砂垫层施工时，砂的粒径应符合设计要求，含泥量不宜大于（ ）。",[97,99,101,103],{"key":19,"text":98,"correct":25},"0．5％",{"key":23,"text":100,"correct":25},"1％",{"key":27,"text":102,"correct":25},"3％",{"key":30,"text":104,"correct":21},"5％",{"id":106,"libraryId":5,"type":9,"typeLabel":15,"stem":107,"options":108,"answer":30,"analysis":32},1129138,"重力式扶壁码头的混凝土胸墙宜在底板上（ ）浇筑施工。",[109,111,113,115],{"key":19,"text":110,"correct":25},"回填前",{"key":23,"text":112,"correct":25},"回填后",{"key":27,"text":114,"correct":25},"压载前",{"key":30,"text":116,"correct":21},"回填压载后",{"id":118,"libraryId":5,"type":9,"typeLabel":15,"stem":119,"options":120,"answer":23,"analysis":32},1129139,"钢板桩的施工要特别注意榫口，在沉桩前通常用不短于（ ）m的钢板桩做通过检查。",[121,123,125,127],{"key":19,"text":122,"correct":25},"1",{"key":23,"text":124,"correct":21},"2",{"key":27,"text":126,"correct":25},"3",{"key":30,"text":128,"correct":25},"4",{"id":130,"libraryId":5,"type":9,"typeLabel":15,"stem":131,"options":132,"answer":30,"analysis":32},1129140,"铰链排护滩施工时，排体铺设宜按（ ）的先后顺序逐段铺设。",[133,135,137,139],{"key":19,"text":134,"correct":25},"自上游往下游、从河岸往河心",{"key":23,"text":136,"correct":25},"自上游往下游、从河心往河岸",{"key":27,"text":138,"correct":25},"自下游往上游、从河心往河岸",{"key":30,"text":140,"correct":21},"自下游往上游、从河岸往河心",{"id":142,"libraryId":5,"type":9,"typeLabel":15,"stem":143,"options":144,"answer":30,"analysis":32},1129141,"固定的沉降、位移观测点，应（ ），交工验收时一并交付使用单位。",[145,147,149,151],{"key":19,"text":146,"correct":25},"用文字说明",{"key":23,"text":148,"correct":25},"存人档案中",{"key":27,"text":150,"correct":25},"逐个工序交接",{"key":30,"text":152,"correct":21},"在竣工平面图上注明",{"id":154,"libraryId":5,"type":9,"typeLabel":15,"stem":155,"options":156,"answer":19,"analysis":32},1129142,"重力式码头的倒滤层完成后，应及时回填，采用吹填时，排水口宜（ ）。",[157,159,161,163],{"key":19,"text":158,"correct":21},"远离码头前沿",{"key":23,"text":160,"correct":25},"靠近码头前沿",{"key":27,"text":162,"correct":25},"远离墙背",{"key":30,"text":164,"correct":25},"靠近墙背",{"id":166,"libraryId":5,"type":9,"typeLabel":15,"stem":167,"options":168,"answer":23,"analysis":32},1129148,"重力式码头基槽抛石前，对重力密度超过12．6kN／m3、厚度大于（ ）的回淤物应予清除。",[169,171,173,175],{"key":19,"text":170,"correct":25},"200mm",{"key":23,"text":172,"correct":21},"300mm",{"key":27,"text":174,"correct":25},"400mm",{"key":30,"text":176,"correct":25},"500mm",{"id":178,"libraryId":5,"type":9,"typeLabel":15,"stem":179,"options":180,"answer":23,"analysis":32},1129149,"高桩码头沉桩后进行回填或抛石时，在基桩处，沿桩周对称抛填，桩两侧高差不得大于（ ）。如设计另有规定，应满足设计要求。",[181,183,185,187],{"key":19,"text":182,"correct":25},"0．5m",{"key":23,"text":184,"correct":21},"1m",{"key":27,"text":186,"correct":25},"1．5m",{"key":30,"text":188,"correct":25},"2m",{"id":190,"libraryId":5,"type":9,"typeLabel":15,"stem":191,"options":192,"answer":23,"analysis":32},1129150,"砂枕充填宜采用泥浆泵充填，砂枕充填饱满度不应大于（ ）。",[193,195,197,199],{"key":19,"text":194,"correct":25},"70％",{"key":23,"text":196,"correct":21},"80％",{"key":27,"text":198,"correct":25},"85％",{"key":30,"text":200,"correct":25},"90％",{"id":202,"libraryId":5,"type":9,"typeLabel":15,"stem":203,"options":204,"answer":23,"analysis":32},1129151,"斜坡堤在软土地基上的抛石时，当堤侧有块石压载层时，应（ ）。",[205,207,209,211],{"key":19,"text":206,"correct":25},"先抛堤身，后抛压载层",{"key":23,"text":208,"correct":21},"先抛压载层，后抛堤身",{"key":27,"text":210,"correct":25},"在低潮时抛压载层",{"key":30,"text":212,"correct":25},"在高潮时抛压载层",{"id":214,"libraryId":5,"type":9,"typeLabel":15,"stem":215,"options":216,"answer":27,"analysis":32},1129154,"重力式码头胸墙混凝土浇筑应在下部安装构件（ ）进行。",[217,219,221,223],{"key":19,"text":218,"correct":25},"达预定沉降值后",{"key":23,"text":220,"correct":25},"稳定后",{"key":27,"text":222,"correct":21},"沉降稳定后",{"key":30,"text":224,"correct":25},"沉降速率符合设计值后",{"id":226,"libraryId":5,"type":9,"typeLabel":15,"stem":227,"options":228,"answer":27,"analysis":32},1129155,"在已有建筑物附近进行基槽开挖时，应选择（ ）。",[229,231,233,235],{"key":19,"text":230,"correct":25},"绞吸式挖泥船",{"key":23,"text":232,"correct":25},"链斗式挖泥船",{"key":27,"text":234,"correct":21},"小型抓扬式挖泥船",{"key":30,"text":236,"correct":25},"大型铲斗式挖泥船",{"id":238,"libraryId":5,"type":9,"typeLabel":15,"stem":239,"options":240,"answer":19,"analysis":32},1129156,"对于抛石基床应预留沉降量，夯实的基床，可按（ ）预留。",[241,243,245,247],{"key":19,"text":242,"correct":21},"地基沉降量",{"key":23,"text":244,"correct":25},"地基沉降量和基床沉降量之和",{"key":27,"text":246,"correct":25},"基床本身的沉降量",{"key":30,"text":248,"correct":25},"地基沉降量和基床沉降量各50％",{"id":250,"libraryId":5,"type":9,"typeLabel":15,"stem":251,"options":252,"answer":23,"analysis":32},1129157,"重力式码头不需夯实的基床要求块石的饱水抗压强度（ ）。",[253,255,257,259],{"key":19,"text":254,"correct":25},"≥50MPa",{"key":23,"text":256,"correct":21},"≥30MPa",{"key":27,"text":258,"correct":25},"≥80MPa",{"key":30,"text":260,"correct":25},"≥100MPa",{"id":262,"libraryId":5,"type":9,"typeLabel":15,"stem":263,"options":264,"answer":23,"analysis":32},1129158,"对抛石基床顶面标高的控制，应掌握抛石（ ）的原则。",[265,267,269,271],{"key":19,"text":266,"correct":25},"宁高勿低",{"key":23,"text":268,"correct":21},"宁低勿高",{"key":27,"text":270,"correct":25},"高低均可",{"key":30,"text":272,"correct":25},"有时以A为主，有时以B为主",{"id":274,"libraryId":5,"type":9,"typeLabel":15,"stem":275,"options":276,"answer":27,"analysis":32},1129159,"基床夯实后，进行复夯检验时，对离岸码头采用选点复打一夯次，其平均沉降量不大于（ ）。",[277,279,281,283],{"key":19,"text":278,"correct":25},"10mm",{"key":23,"text":280,"correct":25},"30mm",{"key":27,"text":282,"correct":21},"50mm",{"key":30,"text":172,"correct":25},{"id":285,"libraryId":5,"type":9,"typeLabel":15,"stem":286,"options":287,"answer":23,"analysis":32},1129160,"基床夯实后，进行复夯检验时，对离岸码头采用选点复打一夯次，复夯选点的数量不少于（ ）点，并应均匀分布在选点的基床上。",[288,290,292,294],{"key":19,"text":289,"correct":25},"10",{"key":23,"text":291,"correct":21},"20",{"key":27,"text":293,"correct":25},"50",{"key":30,"text":295,"correct":25},"80",{"id":297,"libraryId":5,"type":9,"typeLabel":15,"stem":298,"options":299,"answer":23,"analysis":32},1129161,"采用爆夯法密实基床时，其夯沉量一般控制在抛石厚度的（ ）。",[300,302,304,306],{"key":19,"text":301,"correct":25},"0～10％",{"key":23,"text":303,"correct":21},"10％～20％",{"key":27,"text":305,"correct":25},"20％～30％",{"key":30,"text":307,"correct":25},"10％～30％",{"id":309,"libraryId":5,"type":9,"typeLabel":15,"stem":310,"options":311,"answer":30,"analysis":32},1129162,"在模板设计时，作用在有效高度内的倾倒混凝土所产生的水平动力荷载取决于向模板内供料的方法，用容量0．8m3以上的运输器具，其产生的水平荷载为（ ）kN／m2。",[312,314,316,318],{"key":19,"text":313,"correct":25},"2．0",{"key":23,"text":315,"correct":25},"3．0",{"key":27,"text":317,"correct":25},"4．0",{"key":30,"text":319,"correct":21},"6．0",{"id":321,"libraryId":5,"type":9,"typeLabel":15,"stem":322,"options":323,"answer":27,"analysis":32},1129163,"重力式码头施工中，预制体积较大的方块时，在混凝土中往往埋放块石，尺寸应根据运输条件和振捣能力而定，其最大边与最小边长之比不应大于（ ）。",[324,326,328,329],{"key":19,"text":325,"correct":25},"1．2",{"key":23,"text":327,"correct":25},"1．5",{"key":27,"text":124,"correct":21},{"key":30,"text":126,"correct":25},{"id":331,"libraryId":5,"type":9,"typeLabel":15,"stem":332,"options":333,"answer":23,"analysis":32},1129164,"混凝土振捣采用插入式振动器的振捣顺序宜从近模板处开始，先外后内，移动间距不应大于振动器有效半径的（ ）倍。",[334,335,336,337],{"key":19,"text":122,"correct":25},{"key":23,"text":327,"correct":21},{"key":27,"text":124,"correct":25},{"key":30,"text":126,"correct":25},{"id":339,"libraryId":5,"type":9,"typeLabel":15,"stem":340,"options":341,"answer":23,"analysis":32},1129166,"沉箱可整体预制或分层预制。分层预制时，施工缝不宜设在（ ）。",[342,344,346,348],{"key":19,"text":343,"correct":25},"浪溅区",{"key":23,"text":345,"correct":21},"水位变动区",{"key":27,"text":347,"correct":25},"大气区",{"key":30,"text":349,"correct":25},"水下区",{"id":351,"libraryId":5,"type":9,"typeLabel":15,"stem":352,"options":353,"answer":23,"analysis":32},1129167,"沉箱和扶壁式重力式码头，其抛填棱体需（ ）后进行。",[354,356,358,360],{"key":19,"text":355,"correct":25},"基础完成后",{"key":23,"text":357,"correct":21},"墙身安装好",{"key":27,"text":359,"correct":25},"上部结构完成",{"key":30,"text":361,"correct":25},"端头护岸完成",{"id":363,"libraryId":5,"type":9,"typeLabel":15,"stem":364,"options":365,"answer":27,"analysis":32},1129168,"重力式码头棱体抛填断面的平均轮廓线不得小于设计断面，顶面和坡面的表层应铺（ ）厚度的二片石，其上再铺倒滤层。",[366,368,370,372],{"key":19,"text":367,"correct":25},"0．1～0．3m",{"key":23,"text":369,"correct":25},"0．2～0．6m",{"key":27,"text":371,"correct":21},"0．3～0．5m",{"key":30,"text":373,"correct":25},"0．5～0．8m",{"id":375,"libraryId":5,"type":9,"typeLabel":15,"stem":376,"options":377,"answer":30,"analysis":32},1129169,"重力式码头棱体抛填断面的平均轮廓线不得小于设计断面，顶面和坡面的表层应铺0．3～0．5m厚度的（ ），其上再铺倒滤层。",[378,380,382,384],{"key":19,"text":379,"correct":25},"瓜米石",{"key":23,"text":381,"correct":25},"1～3cm碎石",{"key":27,"text":383,"correct":25},"3～5cm碎石",{"key":30,"text":385,"correct":21},"二片石",{"id":387,"libraryId":5,"type":9,"typeLabel":15,"stem":388,"options":389,"answer":19,"analysis":32},1129170,"在有风浪影响地区的重力式码头施工，（ ）不应抛筑棱体顶面的倒滤层，倒滤层完工后应尽快填土覆盖。",[390,392,394,396],{"key":19,"text":391,"correct":21},"胸墙未完成前",{"key":23,"text":393,"correct":25},"胸墙已完成",{"key":27,"text":395,"correct":25},"墙身结构未完成前",{"key":30,"text":397,"correct":25},"墙身结构已完成",{"id":399,"libraryId":5,"type":9,"typeLabel":15,"stem":400,"options":401,"answer":23,"analysis":32},1129171,"重力式码头的棱体面铺设土工织物倒滤层时，土工织物的搭接长度应满足设计要求并不小于（ ）。",[402,403,405,406],{"key":19,"text":182,"correct":25},{"key":23,"text":404,"correct":21},"1．0m",{"key":27,"text":186,"correct":25},{"key":30,"text":407,"correct":25},"2．0m",{"id":409,"libraryId":5,"type":9,"typeLabel":15,"stem":410,"options":411,"answer":30,"analysis":32},1129172,"级配倒滤层的厚度允许偏差为（ ）。",[412,414,416,418],{"key":19,"text":413,"correct":25},"水上±50mm，水下±100mm",{"key":23,"text":415,"correct":25},"水上±100mm，水下±100mm",{"key":27,"text":417,"correct":25},"水上+100mm，水下+100mm",{"key":30,"text":419,"correct":21},"水上+50mm，水下+100mm",{"id":421,"libraryId":5,"type":9,"typeLabel":15,"stem":422,"options":423,"answer":30,"analysis":32},1129173,"重力式码头的倒滤层完成后，应及时回填，采用吹填时，吹泥管口宜（ ）。",[424,425,426,427],{"key":19,"text":158,"correct":25},{"key":23,"text":160,"correct":25},{"key":27,"text":162,"correct":25},{"key":30,"text":164,"correct":21},{"id":429,"libraryId":5,"type":9,"typeLabel":15,"stem":430,"options":431,"answer":27,"analysis":32},1129174,"重力式码头陆上填土如采用强夯法进行夯实，为防止码头因振动而发生位移，根据（ ）的大小，夯击区要离码头前沿一定距离（一般40m）。",[432,434,436,438],{"key":19,"text":433,"correct":25},"夯锤",{"key":23,"text":435,"correct":25},"落距",{"key":27,"text":437,"correct":21},"夯击能",{"key":30,"text":439,"correct":25},"填土厚度",{"id":441,"libraryId":5,"type":9,"typeLabel":15,"stem":442,"options":443,"answer":19,"analysis":32},1129175,"重力式码头干地填土的填料应分层压实，每层填土虚铺厚度，对人工夯实不宜大于（ ）。",[444,446,448,450],{"key":19,"text":445,"correct":21},"0．2m",{"key":23,"text":447,"correct":25},"0．3m",{"key":27,"text":449,"correct":25},"0．4m",{"key":30,"text":182,"correct":25},{"id":452,"libraryId":5,"type":9,"typeLabel":15,"stem":453,"options":454,"answer":27,"analysis":32},1129177,"重力式码头后方抛填棱体的作用是（ ）。",[455,457,459,461],{"key":19,"text":456,"correct":25},"防止回填土的流失",{"key":23,"text":458,"correct":25},"对地基压载加固",{"key":27,"text":460,"correct":21},"降低墙后主动土压力",{"key":30,"text":462,"correct":25},"防止地基沉降",{"id":464,"libraryId":5,"type":9,"typeLabel":15,"stem":465,"options":466,"answer":23,"analysis":32},1129178,"港航工程中不得采用（ ）作倒滤层材料。",[467,469,471,473],{"key":19,"text":468,"correct":25},"无纺土工织物",{"key":23,"text":470,"correct":21},"编织土工织物",{"key":27,"text":472,"correct":25},"非织造土工布",{"key":30,"text":474,"correct":25},"机织土工布",{"id":476,"libraryId":5,"type":9,"typeLabel":15,"stem":477,"options":478,"answer":19,"analysis":32},1129179,"重力式码头墙后吹填时，应对吹填的高度、码头前后水位、码头的位移和沉降进行观测，其主要目的是（ ）。",[479,481,483,485],{"key":19,"text":480,"correct":21},"为及时发现和防止码头产生过大变形",{"key":23,"text":482,"correct":25},"为统计吹填工作量",{"key":27,"text":484,"correct":25},"决定吹泥管口的位置",{"key":30,"text":486,"correct":25},"为确定合适的围堰高程",{"id":488,"libraryId":5,"type":9,"typeLabel":15,"stem":489,"options":490,"answer":27,"analysis":32},1129180,"采用无纺布作倒滤层材料时，其单位面积质量宜为（ ）g／m2。",[491,493,495,497],{"key":19,"text":492,"correct":25},"100～300",{"key":23,"text":494,"correct":25},"200～400",{"key":27,"text":496,"correct":21},"300～500",{"key":30,"text":498,"correct":25},"400～600",{"id":500,"libraryId":5,"type":9,"typeLabel":15,"stem":501,"options":502,"answer":27,"analysis":32},1129181,"重力式码头胸墙混凝土，在埋有块石的混凝土中留置水平施工缝时，应使埋人的块石（ ），增强新老混凝土接合。",[503,505,507,509],{"key":19,"text":504,"correct":25},"外露1／4",{"key":23,"text":506,"correct":25},"外露1／3",{"key":27,"text":508,"correct":21},"外露一半",{"key":30,"text":510,"correct":25},"外露3／4",{"id":512,"libraryId":5,"type":9,"typeLabel":15,"stem":513,"options":514,"answer":23,"analysis":32},1129182,"重力式码头在施工缝处浇筑混凝土时，已浇筑的混凝土，其抗压强度不应小于（ ）。",[515,517,519,521],{"key":19,"text":516,"correct":25},"1．0MPa",{"key":23,"text":518,"correct":21},"1．2MPa",{"key":27,"text":520,"correct":25},"1．5MPa",{"key":30,"text":522,"correct":25},"2．0MPa",{"id":524,"libraryId":5,"type":9,"typeLabel":15,"stem":525,"options":526,"answer":19,"analysis":32},1129183,"在混凝土施工缝处浇筑新混凝土前，应先用水充分湿润老混凝土表层，刷一层水泥浆或铺一层厚度为10～30mm的水泥砂浆。水泥净浆和水泥砂浆的（ ）。",[527,529,531,533],{"key":19,"text":528,"correct":21},"水灰比应小于混凝土的水灰比",{"key":23,"text":530,"correct":25},"水灰比应等于混凝土的水灰比",{"key":27,"text":532,"correct":25},"强度等级与混凝土相等",{"key":30,"text":534,"correct":25},"强度等级大于混凝土强度",{"id":536,"libraryId":5,"type":9,"typeLabel":15,"stem":537,"options":538,"answer":27,"analysis":32},1129184,"高桩码头沉桩时桩的坡度由（ ）来保证。",[539,541,543,545],{"key":19,"text":540,"correct":25},"经纬仪",{"key":23,"text":542,"correct":25},"水准仪",{"key":27,"text":544,"correct":21},"打桩架",{"key":30,"text":546,"correct":25},"坡度尺",{"id":548,"libraryId":5,"type":9,"typeLabel":15,"stem":549,"options":550,"answer":19,"analysis":32},1129185,"为保证基桩承载力满足设计要求，桩尖应落在设计规定的标高上，桩尖标高是通过（ ）的标高测量实现的。",[551,553,555,556],{"key":19,"text":552,"correct":21},"桩顶",{"key":23,"text":554,"correct":25},"替打顶",{"key":27,"text":544,"correct":25},{"key":30,"text":557,"correct":25},"龙口",{"id":559,"libraryId":5,"type":9,"typeLabel":15,"stem":560,"options":561,"answer":23,"analysis":32},1129187,"高桩码头沉桩后进行岸坡抛填时，应（ ）进行。如设计另有规定，应满足设计要求。",[562,564,566,568],{"key":19,"text":563,"correct":25},"由岸向水域分层",{"key":23,"text":565,"correct":21},"由水域向岸分层",{"key":27,"text":567,"correct":25},"由岸向水域",{"key":30,"text":569,"correct":25},"由水域向岸",{"id":571,"libraryId":5,"type":9,"typeLabel":15,"stem":572,"options":573,"answer":27,"analysis":32},1129188,"岸坡结构采用板桩时，锚碇结构回填顺序应符合设计要求。回填时首先应回填（ ）的区域。",[574,576,578,580],{"key":19,"text":575,"correct":25},"板桩结构前",{"key":23,"text":577,"correct":25},"板桩结构后",{"key":27,"text":579,"correct":21},"锚碇结构前",{"key":30,"text":581,"correct":25},"锚碇结构后",{"id":583,"libraryId":5,"type":9,"typeLabel":15,"stem":584,"options":585,"answer":27,"analysis":32},1129189,"高桩码头在接岸结构岸坡回填土和抛石施工时，采用板桩的锚碇结构前回填时，应按设计要求（ ）。",[586,588,590,592],{"key":19,"text":587,"correct":25},"分层自密",{"key":23,"text":589,"correct":25},"不分层自密",{"key":27,"text":591,"correct":21},"分层夯实",{"key":30,"text":593,"correct":25},"不分层夯实",{"id":595,"libraryId":5,"type":9,"typeLabel":15,"stem":596,"options":597,"answer":23,"analysis":32},1129190,"高桩码头在浇筑码头面层时，应埋置（ ）的沉降、位移观测点，定期进行观测，并做好记录。",[598,600,602,604],{"key":19,"text":599,"correct":25},"临时",{"key":23,"text":601,"correct":21},"固定",{"key":27,"text":603,"correct":25},"活动",{"key":30,"text":605,"correct":25},"长期",[607,610,613,616,619,622],{"id":9,"name":608,"category":7,"favorite":609},"领导干部任职前廉政法规知识测试题",92,{"id":611,"name":612,"category":7,"favorite":9},595,"建筑结构与设备",{"id":614,"name":615,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":617,"name":618,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":620,"name":621,"category":7,"favorite":8},534,"BIM工程师",{"id":623,"name":621,"category":7,"favorite":8},535]