[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1130706":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1130706,794,2,"多选题","建设单位收到单位工程竣工报告后应及时组织（ ）对单位工程进行预验收。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","质检单位",false,{"key":16,"text":17,"correct":18},"B","施工单位",true,{"key":20,"text":21,"correct":18},"C","监理单位",{"key":23,"text":24,"correct":18},"D","设计单位",{"key":26,"text":27,"correct":14},"E","质量监督单位","BCD","2020版教材页码P328-P337 建设单位收到单位工程竣工报告后应及时组织施工单位、设计单位、监理单位对单位工程进行预验收。",{"id":6,"name":31,"category":32,"favorite":33},"一建港口与航道工程实务","建筑工程",0]