[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1130705":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1130705,794,2,"多选题","水运工程开工前，建设单位应组织（ ）对单位工程、分部、分项工程进行划分。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","设计单位",false,{"key":16,"text":17,"correct":18},"B","施工单位",true,{"key":20,"text":21,"correct":14},"C","质检单位",{"key":23,"text":24,"correct":18},"D","监理单位",{"key":26,"text":27,"correct":14},"E","质量监督单位","BD","2020版教材页码P328-P337 水运工程项目开工前，建设单位应组织施工单位、监理单位对单位工程、分部工程和分项工程进行划分，并报水运工程质量监督机构备案。工程建设各方应据此进行工程质量控制和检验。",{"id":6,"name":31,"category":32,"favorite":33},"一建港口与航道工程实务","建筑工程",0]